10,012 results • Best match
JJM WATER SUPPLY SCHEME AT AADGAON TAL YAWAL DIST JALGAON.
RCC ESR CAP 64,000 LITR STG HT 12.00M Item.No.1 :- Designing (aesthetically), and constructing RCC elevated service reservoirs of following capacity with RCC staging consisting of columns, internal and external bracings spaced vertically not more than 4.5 meters centre to centre for E.S.R.having capacity 500 m3 & not more than 6 m c/c for E.S.R.having capacity above 500 m3 including excavation in all types of strata, foundation concret, cement plaster with water proofing compound to the inside face of the containerincluding refilling disposing of the surplus stuff within a lead of 50 meters, all labour and material charges including lowering, laying, erecting, hoisting and jointing of pipe assembly of inlet, outlet, washout, overflow and bypass arrangements as per departmental design. providing and fixing accessories such as Stainless steel ladder inside and M.S. ladder with G.I. railing outside, C. I. manhole frame and covers water level indicatiors, lightening conductor, G. I. pipe railing around walk way and top slab, providing spiral staire case from ground level to roof level, M.S.Grill gate of 2 Mtrs height with locking arrangement, B.B. masonry chambers for all valves, ventilating shafts, providing and applying three coats of acrylic emulsion with silicon additives paint to the structure including roof slab and epoxy paint to internal surface & anti-termite treatment for underground parts of the structures and giving satisfactory water tightness test as per I.S. code, The job to include painting the name of the scheme and other details on the reservoir as per the directions of Engineer-in-charge. Notes:1. The design of the structure be in accordance with relevent (I.S.3370 - 1965 or revised) 2. The design shall satisfy the stipulation as per IS 1893-1984 and I.S. 13920/1993 for seismic focrce and I.S.- 11682/1985 for R.C.C. staging of overhead tanks. 3. For design having more than 6 columns, Providing of internal bracing is obligatory,. External bracking is also obligatory. 4.. The entire structure shall be in M 300 mix only. 5. Plain round mild steel bars grade - I confirming to I.S,432 Part-I or high yield strengh deformed bars confirming to I.S. 1786 or I.S. 1139 shall be used, grade-II mild steel bars will not be allowed. 6. Irrespective of the type of foundation proposed in the design, one set of bracing be provided at the gound level. 7. These rates include providing, M.S. ladder for E.S.R's upto 2 lakhs liters capacity and providing sprial staircase for E.S.R. above 2 lakhs liters capacity. 8. Stagging shall have to be designed with stresses of M-250 for ESR. However all RCC construction should be done in M-300 9. These rates are including the cost of uplift pressure if any and entire dewatering during execution. In case of water logging area where water is struck at shallow depth extra provision of dewatering shall be made as per site condition. 10. All condition given in the Member Secretary"s Circular No.MJP/TS-I/350/1668 dt. 2.8.97 and MJP/S-I/350/2127 dt.13.7.99 shall be strictly followed and additional cost, if any due to these conditions is included in the rates mentioned below. 11.. 75% part rate shall be payable for reinforced cocnrete and plastering items of containers of E.S.R. till satisfactory hydraulic testing for water tightness is given ; and till that work shall be treated as incomplete. 12. The rates indicated in the table are excluding the cost of pipes, specials and valves required for inlet, outlet washout overflow and by-pass arrangement. The scope of work, however inclueds cost of erecting, laying and jointing of pipes and valvews including cost of jointing materials upto 5M beyond outer face of outermost column. 13. For ESR upto 500cum capacity C.I.D. double flanged pipes upto 300mm dia shall be provided and C.I.Specials shall be used.For ESR above 500 cum capacity C.I./M.S. pipes assembly with minimum 8mm thick ness up to 500mm dia. And minimum 10mm thickness above 500mm dia can be used with proper anti-corrosive epoxy teratment from inside and outside. 14. Below mentioned rates are for foundation, with individuals footing with bearing capacity of 30 tonnes per square metre. For raft foundations, these rates shall be increased by 7.5% wheresafebearing capacity ( SBC) is 5 M.T. per Sq.m and by 5% where SBC is more than 5 MT/Sqm. and upto 10MT/Sq.m. This percentage of 5% or 7,5% is applicable for estimation of amount of L.S. items ESR for Extra item due to change from individual footing foundation to raft actual increase in concrete and steel quantities be paid as per relevent DSR Item. 15.The rates shall be increase by 30% for brearing piles upto depth of 10m and for further increased in depth by 5M each it shall be increased by another 10% These rates are applicable where raft is not reasible for pile foundation sulfate resistant cement shall only be used. Single pile for the column is not permitted Group of piles shall be designed with pile cap for each column of ESR. 16. These rates are applicable for staging height of 12 M These rates shall be increased or decreased for per metre variation in the staging height as below 12 to 16 M staging 2% per metre 16 to 20m staging 3% per meter 20 M and abovd - 4% per metre I.e. for 17m stagging height percentage calculation will be like below 12 to16m = 4 x 2 = 8% 16 to 17 m x 1 x 3 = 3% Total = 11 % For 21 m stagging height Percentage calculation will be like below 12 to 16m = 4 x 2 = 8% 16 to 20m = 4 x 3 = 12% 20 to 21m = 1 x 4 = 4% Total = 24% 17. Following rates are for seismic zone-III for Zone-IV these rates shall be increased by 5% and for Zone-II, these rates shall be decreased by 5% concerned Executive Engineer shall confirm the seismic zone for the scheme from seismic zones plan before estimation and adopt appropriate rates as per actual seismic zones( Seismic maps attached in this C.S.R.) Note:- 1) Conditin from Sr.No.1 to 11 shall form a part and parcel of the tender papers and shall be included in the DTP for works of R.C.C.E.S.R. Note:-2) Condition from Sr.No.12 to 17 are for estimation purpose only and shall not be appear in the tender. Cost of 64,000 litres capacity 12 m stage height ESR Add for raft foundation 7.5 % Net Total Cost of 64,000 litres capacity 12 m stg. height ESR RCC ESR 64,000 lit.Cap.
JJM WATER SUPPLY SCHEME AT GIRADGAON TAL YAWAL DIST. JALGAON
RCC ESR 52000 lit cap Item No : - 1Designing (aesthetically), and constructing RCC elevated service reservoirs of following capacity with RCC staging consisting of columns, internal and external bracings spaced vertically not more than 4.5 meters centre to centre for E.S.R. having capacity 500 m3 & not more than 6 m c/c for E.S.R.having capacity above 500 m3 including excavation in all types of strata, foundation concret, cement plaster with water proofing compound to the inside face of the container including refilling disposing of the surplus stuff within a lead of 50 meters, all labour and material charges including lowering, laying, erecting, hoisting and jointing of pipe assembly of inlet, outlet, washout, overflow and bypass arrangements as per departmental design. providing and fixing accessories such as M.S. ladder, C. I. manhole frame and covers water level indicatiors, lightening conductor, G. I. pipe railing around walk way and top slab, providing spiral staire case from ground level to roof level, M.S.Grill gate of 2 Mtrs height with locking arrangement, B.B. masonry chambers for all valves, ventilating shafts, providing and applying three coats of cement paint to the structure including roof slab and epoxy paint to internal surface & anti-termite treatment for underground parts of the structures and giving satisfactory water tightness test as per I.S. code, The job to include painting the name of the scheme and other details on the reservoir as per the directions of Engineer-in-charge.For raft Fundation Increase vate by 7.5% Notes: 1. The design of the structure be in accordance with relevent (I.S.3370 - 1965 or revised) 2 3. For design having more than 6 columns, Providing of internal bracing is obligatory,. External bracking is also obligatory. 4.. The entire structure shall be in M/300mix only.5. Plain round mild steel bars grade - I confirming to I.S,432 Part-I or high yield strengh deformed bars confirming to I.S. 1786 or I.S. 1139 shall be used, grade-II mild steel bars will not be allowed. 6. Irrespective of the type of foundation proposed in the design, one set of bracing be provided at the gound level.7. These rates include providing, M.S. ladder for E.S.R's upto 2 lakhs liters capacity and providing sprial staircase for E.S.R. above 2 lakhs liters capacity.8. Stagging shall have to be designed with stresses of M-200 for ESR. However all RCC construction should be done in M-250 9. These rates are including the cost of uplift pressure if any and entire dewatering during execution. In case of water logging area where water is struck at shallow depth extra provision of dewatering shall be made as per site condition. 10. All condition given in the Member Secretary"s Circular No.MJP/TS-I/350/1668 dt. 2.8.97 and MJP/S-I/350/2127 dt. 13.7.99 shall be strictly followed and additional cost, if any due to these conditions is included in the rates mentioned below. 11.. 75% part rate shall be payable for reinforced cocnrete and plastering items of containers of E.S.R. till satisfactory hydraulic testing for water tightness is given ; and till that work shall be treated as incomplete.12. The rates indicated in the table are excluding the cost of pipes, specials and valves required for inlet, outlet washout overflow and by-pass arrangement. The scope of work, however inclueds cost of erecting, laying and jointing of pipes and valvews including cost of jointing materials upto 5M beyond outer face of outermost column.13. For ESR upto 500cum capacity C.I.D. double flanged pipes upto 300mm dia shall be provided and C.I.Specials shall be used.For ESR above 500 cum capacity C.I./M.S. pipes assembly with minimum 8mm thick ness up to 500mm dia. And minimum 10mm thickness above 500mm dia can be used with proper anti-corrosive epoxy teratment from inside and outside.14.Below mentioned rates are for foundations with individual footing with bearing capacity of 20 tonnes per square metre. For raft foundations, these rates shall be increased by 7.5% where safe bearing capacity (SBC) is 5 MT per sqm and by 5% where SBC is more than 5 MT/sqm and upto 10 MT/sqm. This % of 5% or 7.5% is applicable for estimation of amount of lumpsum item of ESR. For extra item due to change from individual foundation to raft, actual increase in concrete and steel be paid as per relevant DSR item. 15.The rate shall be increased by 30% for bearing piles upto depth of 10 M and for further increased in depth by 5 M each, it shall be increased by another 10%. These rates are applicable where raft is not feasible. For pile foundations sulphate resistant cement shall only be used. Single pile for the column is not permitted, group of piles shall be designed with pile cap for each column of ESR.16.The rates are applicable for staging height of 12 M. These rates shall be increased or decreased for per metre variation in this staging height as below 12 to 16 M staging - 2% per metre 16 to 20 M staging - 3% per metre 20 M and above - 4% per metre For 17 M staging height, percentage calculation will be like below : 12 to 16 M --- 4 x 2 = 8% 16 & 17 M --- 1 x 3% = 3% Total = 11% For 21 M staging height, percentage calculation will be like below :12 to 16 M --- 4 x 2 = 8% 16 to 20 M --- 4 x 3% = 12% 20& 21 M --- 1 x 4% = 4% Total = 24% 17. Following rates are for seismic zone III. For zone IV, these rates shall be increased by 5% and for zone II, these rates shall be decreased by 5%. Concerned Executive Engineer shall confirm the seismic zone for the scheme from seismic zones plan before estimation and adopt appropriate rates as per actual seismic zones. (Seismic maps attached in this CSR). Capacity of ESR 52000 Lits.Cost of 25000Litres capacity E.S.R. (for 01 no. ESR)Basic rate Rs. 14.4 per litre upto 9000 L Extra more capacity than specified in 7.5% Add for Stagging Ht. 12 M
JJM WATER SUPPLY SCHEME AT KASARKHEDE TAL YAWAL DIST. JALGAON
RCC ESR CAP 50,000 LITR STG HT 12.00M Item.No.1 :- Designing (aesthetically), and constructing RCC elevated service reservoirs of following capacity with RCC staging consisting of columns, internal and external bracings spaced vertically not more than 4.5 meters centre to centre for E.S.R.having capacity 500 m3 & not more than 6 m c/c for E.S.R.having capacity above 500 m3 including excavation in all types of strata, foundation concret, cement plaster with water proofing compound to the inside face of the containerincluding refilling disposing of the surplus stuff within a lead of 50 meters, all labour and material charges including lowering, laying, erecting, hoisting and jointing of pipe assembly of inlet, outlet, washout, overflow and bypass arrangements as per departmental design. providing and fixing accessories such as Stainless steel ladder inside and M.S. ladder with G.I. railing outside, C. I. manhole frame and covers water level indicatiors, lightening conductor, G. I. pipe railing around walk way and top slab, providing spiral staire case from ground level to roof level, M.S.Grill gate of 2 Mtrs height with locking arrangement, B.B. masonry chambers for all valves, ventilating shafts, providing and applying three coats of acrylic emulsion with silicon additives paint to the structure including roof slab and epoxy paint to internal surface & anti-termite treatment for underground parts of the structures and giving satisfactory water tightness test as per I.S. code, The job to include painting the name of the scheme and other details on the reservoir as per the directions of Engineer-in-charge. Notes:1. The design of the structure be in accordance with relevent (I.S.3370 - 1965 or revised) 2. The design shall satisfy the stipulation as per IS 1893-1984 and I.S. 13920/1993 for seismic focrce and I.S.- 11682/1985 for R.C.C. staging of overhead tanks. 3. For design having more than 6 columns, Providing of internal bracing is obligatory,. External bracking is also obligatory. 4.. The entire structure shall be in M 300 mix only. 5. Plain round mild steel bars grade - I confirming to I.S,432 Part-I or high yield strengh deformed bars confirming to I.S. 1786 or I.S. 1139 shall be used, grade-II mild steel bars will not be allowed. 6. Irrespective of the type of foundation proposed in the design, one set of bracing be provided at the gound level. 7. These rates include providing, M.S. ladder for E.S.R's upto 2 lakhs liters capacity and providing sprial staircase for E.S.R. above 2 lakhs liters capacity. 8. Stagging shall have to be designed with stresses of M-250 for ESR. However all RCC construction should be done in M-300 9. These rates are including the cost of uplift pressure if any and entire dewatering during execution. In case of water logging area where water is struck at shallow depth extra provision of dewatering shall be made as per site condition. 10. All condition given in the Member Secretary"s Circular No.MJP/TS-I/350/1668 dt. 2.8.97 and MJP/S-I/350/2127 dt.13.7.99 shall be strictly followed and additional cost, if any due to these conditions is included in the rates mentioned below. 11.. 75% part rate shall be payable for reinforced cocnrete and plastering items of containers of E.S.R. till satisfactory hydraulic testing for water tightness is given ; and till that work shall be treated as incomplete. 12. The rates indicated in the table are excluding the cost of pipes, specials and valves required for inlet, outlet washout overflow and by-pass arrangement. The scope of work, however inclueds cost of erecting, laying and jointing of pipes and valvews including cost of jointing materials upto 5M beyond outer face of outermost column. 16. These rates are applicable for staging height of 12 M These rates shall be increased or decreased for per metre variation in the staging height as below 12 to 16 M staging 2% per metre 16 to 20m staging 3% per meter 20 M and abovd - 4% per metre I.e. for 17m stagging height percentage calculation will be like below 12 to16m = 4 x 2 = 8% 16 to 17 m x 1 x 3 = 3% Total = 11 % For 21 m stagging height Percentage calculation will be like below 12 to 16m = 4 x 2 = 8% 16 to 20m = 4 x 3 = 12% 20 to 21m = 1 x 4 = 4% Total = 24% 17. Following rates are for seismic zone-III for Zone-IV these rates shall be increased by 5% and for Zone-II, these rates shall be decreased by 5% concerned Executive Engineer shall confirm the seismic zone for the scheme from seismic zones plan before estimation and adopt appropriate rates as per actual seismic zones( Seismic maps attached in this C.S.R.) Note:- 1) Conditin from Sr.No.1 to 11 shall form a part and parcel of the tender papers and shall be included in the DTP for works of R.C.C.E.S.R. Note:-2) Condition from Sr.No.12 to 17 are for estimation purpose only and shall not be appear in the tender. Cost of 50,000 litres capacity 12 m stage height ESR Add for raft foundation 7.5 % Net Total Cost of 50,000 litres capacity 12 m stg. height ESR RCC ESR 50,000 lit.Cap.
JJM WATER SUPPLY SCHEME AT KHIRWAD TAL RAVER DIST JALGAON.
RCC ESR CAP 100000 LITR STG HT 12.00M Item.No.1 :- Designing (aesthetically), and constructing RCC elevated service reservoirs of following capacity with RCC staging consisting of columns, internal and external bracings spaced vertically not more than 4.5 meters centre to centre for E.S.R.having capacity 500 m3 & not more than 6 m c/c for E.S.R.having capacity above 500 m3 including excavation in all types of strata, foundation concret, cement plaster with water proofing compound to the inside face of the containerincluding refilling disposing of the surplus stuff within a lead of 50 meters, all labour and material charges including lowering, laying, erecting, hoisting and jointing of pipe assembly of inlet, outlet, washout, overflow and bypass arrangements as per departmental design. providing and fixing accessories such as Stainless steel ladder inside and M.S. ladder with G.I. railing outside, C. I. manhole frame and covers water level indicatiors, lightening conductor, G. I. pipe railing around walk way and top slab, providing spiral staire case from ground level to roof level, M.S.Grill gate of 2 Mtrs height with locking arrangement, B.B. masonry chambers for all valves, ventilating shafts, providing and applying three coats of acrylic emulsion with silicon additives paint to the structure including roof slab and epoxy paint to internal surface & anti-termite treatment for underground parts of the structures and giving satisfactory water tightness test as per I.S. code, The job to include painting the name of the scheme and other details on the reservoir as per the directions of Engineer-in-charge. Notes:1. The design of the structure be in accordance with relevent (I.S.3370 - 1965 or revised) 2. The design shall satisfy the stipulation as per IS 1893-1984 and I.S. 13920/1993 for seismic focrce and I.S.- 11682/1985 for R.C.C. staging of overhead tanks. 3. For design having more than 6 columns, Providing of internal bracing is obligatory,. External bracking is also obligatory. 4.. The entire structure shall be in M 300 mix only. 5. Plain round mild steel bars grade - I confirming to I.S,432 Part-I or high yield strengh deformed bars confirming to I.S. 1786 or I.S. 1139 shall be used, grade-II mild steel bars will not be allowed. 6. Irrespective of the type of foundation proposed in the design, one set of bracing be provided at the gound level. 7. These rates include providing, M.S. ladder for E.S.R's upto 2 lakhs liters capacity and providing sprial staircase for E.S.R. above 2 lakhs liters capacity. 8. Stagging shall have to be designed with stresses of M-250 for ESR. However all RCC construction should be done in M-300 9. These rates are including the cost of uplift pressure if any and entire dewatering during execution. In case of water logging area where water is struck at shallow depth extra provision of dewatering shall be made as per site condition. 10. All condition given in the Member Secretary"s Circular No.MJP/TS-I/350/1668 dt. 2.8.97 and MJP/S-I/350/2127 dt.13.7.99 shall be strictly followed and additional cost, if any due to these conditions is included in the rates mentioned below. 11.. 75% part rate shall be payable for reinforced cocnrete and plastering items of containers of E.S.R. till satisfactory hydraulic testing for water tightness is given ; and till that work shall be treated as incomplete. 12. The rates indicated in the table are excluding the cost of pipes, specials and valves required for inlet, outlet washout overflow and by-pass arrangement. The scope of work, however inclueds cost of erecting, laying and jointing of pipes and valvews including cost of jointing materials upto 5M beyond outer face of outermost column. 13. For ESR upto 500cum capacity C.I.D. double flanged pipes upto 300mm dia shall be provided and C.I.Specials shall be used.For ESR above 500 cum capacity C.I./M.S. pipes assembly with minimum 8mm thick ness up to 500mm dia. And minimum 10mm thickness above 500mm dia can be used with proper anti-corrosive epoxy teratment from inside and outside. 14. Below mentioned rates are for foundation, with individuals footing with bearing capacity of 30 tonnes per square metre. For raft foundations, these rates shall be increased by 7.5% wheresafebearing capacity ( SBC) is 5 M.T. per Sq.m and by 5% where SBC is more than 5 MT/Sqm. and upto 10MT/Sq.m. This percentage of 5% or 7,5% is applicable for estimation of amount of L.S. items ESR for Extra item due to change from individual footing foundation to raft actual increase in concrete and steel quantities be paid as per relevent DSR Item. 15.The rates shall be increase by 30% for brearing piles upto depth of 10m and for further increased in depth by 5M each it shall be increased by another 10% These rates are applicable where raft is not reasible for pile foundation sulfate resistant cement shall only be used. Single pile for the column is not permitted Group of piles shall be designed with pile cap for each column of ESR. 16. These rates are applicable for staging height of 12 M These rates shall be increased or decreased for per metre variation in the staging height as below 12 to 16 M staging 2% per metre 16 to 20m staging 3% per meter 20 M and abovd - 4% per metre I.e. for 17m stagging height percentage calculation will be like below 12 to16m = 4 x 2 = 8% 16 to 17 m x 1 x 3 = 3% Total = 11 % For 21 m stagging height Percentage calculation will be like below 12 to 16m = 4 x 2 = 8% 16 to 20m = 4 x 3 = 12% 20 to 21m = 1 x 4 = 4% Total = 24% 17. Following rates are for seismic zone-III for Zone-IV these rates shall be increased by 5% and for Zone-II, these rates shall be decreased by 5% concerned Executive Engineer shall confirm the seismic zone for the scheme from seismic zones plan before estimation and adopt appropriate rates as per actual seismic zones( Seismic maps attached in this C.S.R.) Note:- 1) Conditin from Sr.No.1 to 11 shall form a part and parcel of the tender papers and shall be included in the DTP for works of R.C.C.E.S.R. Note:-2) Condition from Sr.No.12 to 17 are for estimation purpose only and shall not be appear in the tender. Cost of 15,000 litres capacity 12 m stage height ESR Add for 13000 Ltr. @ Rs. 11.07/ Ltr. Add for raft foundation 7.5 % Net Total Cost of 32000 litres capacity 12 m stg. height ESR
JJM WATER SUPPLY SCHEME AT SANGAMESHWAR TAL PACHORA DIST JALGAON.
R.C.C E.S.R. CAPACITY 25000 Capacity and 15 m Staging Ht Item No.1 Designing (aesthetically), and constructing RCC elevated service reservoirs of following capacity with RCC staging consisting of columns, internal and external bracings spaced vertically not more than 4.5 meters centre to centre for E.S.R. having capacity 500 m3 & not more than 6 m c/c for E.S.R.having capacity above 500 m3 including excavation in all types of strata, foundation concret, cement plaster with water proofing compound to the inside face of the container including refilling disposing of the surplus stuff within a lead of 50 meters, all labour and material charges including lowering, laying, erecting, hoisting and jointing of pipe assembly of inlet, outlet, washout, overflow and bypass arrangements as per departmental design. providing and fixing accessories such as M.S. ladder, C. I. manhole frame and covers water level indicatiors, lightening conductor, G. I. pipe railing around walk way and top slab, providing spiral staire case from ground level to roof level, M.S.Grill gate of 2 Mtrs height with locking arrangement, B.B. masonry chambers for all valves, ventilating shafts, providing and applying three coats of cement paint to the structure including roof slab and epoxy paint to internal surface & anti-termite treatment for underground parts of the structures and giving satisfactory water tightness test as per I.S. code, The job to include painting the name of the scheme and other details on the reservoir as per the directions of Engineer-in-charge. For raft Fundation Increase vate by 7.5% Notes: 1. The design of the structure be in accordance with relevent (I.S.3370 - 1965 or revised) 2 3. For design having more than 6 columns, Providing of internal bracing is obligatory,. External bracking is also obligatory. 4.. The entire structure shall be in M/300mix only. 5. Plain round mild steel bars grade - I confirming to I.S,432 Part-I or high yield strengh deformed bars confirming to I.S. 1786 or I.S. 1139 shall be used, grade-II mild steel bars will not be allowed. 6. Irrespective of the type of foundation proposed in the design, one set of bracing be provided at the gound level. 7. These rates include providing, M.S. ladder for E.S.R's upto 2 lakhs liters capacity and providing sprial staircase for E.S.R. above 2 lakhs liters capacity. 8. Stagging shall have to be designed with stresses of M-200 for ESR. However all RCC construction should be done in M-250 9. These rates are including the cost of uplift pressure if any and entire dewatering during execution. In case of water logging area where water is struck at shallow depth extra provision of dewatering shall be made as per site condition. 10. All condition given in the Member Secretary"s Circular No.MJP/TS-I/350/1668 dt. 2.8.97 and MJP/S-I/350/2127 dt. 13.7.99 shall be strictly followed and additional cost, if any due to these conditions is included in the rates mentioned below. 11.. 75% part rate shall be payable for reinforced cocnrete and plastering items of containers of E.S.R. till satisfactory hydraulic testing for water tightness is given ; and till that work shall be treated as incomplete. 12. The rates indicated in the table are excluding the cost of pipes, specials and valves required for inlet, outlet washout overflow and by-pass arrangement. The scope of work, however inclueds cost of erecting, laying and jointing of pipes and valvews including cost of jointing materials upto 5M beyond outer face of outermost column. 13. For ESR upto 500cum capacity C.I.D. double flanged pipes upto 300mm dia shall be provided and C.I.Specials shall be used.For ESR above 500 cum capacity C.I./M.S. pipes assembly with minimum 8mm thick ness up to 500mm dia. And minimum 10mm thickness above 500mm dia can be used with proper anti-corrosive epoxy teratment from inside and outside. 14.Below mentioned rates are for foundations with individual footing with bearing capacity of 20 tonnes per square metre. For raft foundations, these rates shall be increased by 7.5% where safe bearing capacity (SBC) is 5 MT per sqm and by 5% where SBC is more than 5 MT/sqm and upto 10 MT/sqm. This % of 5% or 7.5% is applicable for estimation of amount of lumpsum item of ESR. For extra item due to change from individual foundation to raft, actual increase in concrete and steel be paid as per relevant DSR item. 15.The rate shall be increased by 30% for bearing piles upto depth of 10 M and for further increased in depth by 5 M each, it shall be increased by another 10%. These rates are applicable where raft is not feasible. For pile foundations sulphate resistant cement shall only be used. Single pile for the column is not permitted, group of piles shall be designed with pile cap for each column of ESR. 16.The rates are applicable for staging height of 12 M. These rates shall be increased or decreased for per metre variation in this staging height as below 12 to 16 M staging - 2% per metre 16 to 20 M staging - 3% per metre 20 M and above - 4% per metre For 17 M staging height, percentage calculation will be like below : 12 to 16 M --- 4 x 2 = 8% 16 & 17 M --- 1 x 3% = 3% Total = 11% For 21 M staging height, percentage calculation will be like below : 12 to 16 M --- 4 x 2 = 8% 16 to 20 M --- 4 x 3% = 12% 20& 21 M --- 1 x 4% = 4% Total = 24% 17. Following rates are for seismic zone III. For zone IV, these rates shall be increased by 5% and for zone II, these rates shall be decreased by 5%. Concerned Executive Engineer shall confirm the seismic zone for the scheme from seismic zones plan before estimation and adopt appropriate rates as per actual seismic zones. (Seismic maps attached in this CSR). R.C.C E.S.R. CAPACITY 25000 Capacity and 15 m Staging Ht
Please refer BOQ
Providing water supply to different water stressed areas of Smailpur and Rahya Suchani section of Bari Brahmana Sub Division by way of engagement of Tractor water tanker of capacity 4 KL, 03 No. trips per day incl. cost of POL , Hire charges inclusive of salary of Drivers , all toll taxes, token and other taxes applicable for 75 days of peak summer season of the year 2026 (Rate to be quoted per trip)