Loading…
Loading…
9,742 results • Best match
Construction of Seminar Hall at First Floor of Union Bhawan.
39(a) Providing and fixing CPVC (Chlorinated Polyvinyl Chloride) concealed pipe 20mm having thermal stability for hot & cold water supply, including fittings like brass socket MTA & FTA, CPVC L band, Elbow, clamps, CPVC Sockets ...
Estimate for Construction of Lift Schemes Sub Divisional Office at Kotla and Providing all Infrastructure
CONCEALED IN WALL: Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes as per IS15778 (ISImarked with the prior approval of Engineer-in Charge), having thermal stability for hot & cold water supply, including all CPVC plain&brass threaded fittings i/c fixing the pipe with clamps at ...
Urgent Construction of 03 No. cabins and sheds and other civil misc. work in the campus of DM office (outer north) at DM Office Campus Alipur, Delhi-36.
Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot & cold water supply and all CPVC plain & brass threaded fittings, including fixing the pipe with clamps at 1.00 m spacing. This includes jointing of pipes & fittings with one step ...
Construction of Boundary wall, Guard Hut and Store Shed at 132 KV GSS, Bhiyad, Distt. Barmer
(S-240/2.37.1) Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes (IS 15778 : 2007 code) having thermal stability for hot & cold water supply including all CPVC plain & brass threaded fittings i/c fixing the pipe with clamps at 1 metre spacing. This includes jointing of pipes & fittings with one step ...
PROVN OF AVIONICS ENGINEERING COMPLEX AEC AT AFS TAMBARAM
EXTERNAL WATER SUPPLY : Material and labour for cutting of existing 150/100mm CI /DI pipe line and taking of 80 mm dia branch connection and including inserting Tee of suitable size to connect existing pipe line (except CI/DI specials) complete all as specified and as directed.
REPAIR MAINT TO PUMP SETS, MOTOR, CHLORONOME PLANTS AT 20WG AFS AND 46 WEU AND REPAIR MAINT TO PUMP SETS, MOTOR, CHLORONOME PLANTS, WATER TREATMENT PLANTS, RCC OH TANKS, TESTING OF WATER IN EVERY QUARTER AT 273 SU AFS AND UNDER GE (AF) BAGDOGRA
Transportation of submersible pump sets 3 phase any make and capacity 5 to 15 HP from pump house to contractor work shop for carry out necessary repair work to pump set submersible and transporting it back to site of water supply installation of AF Stn area complete all as specified and directed.