Loading…
Loading…
10,345 results • Best match
Construction of Newly Libarary Block at Government Degree College Sopore ( Phase _Ist)
Providing and fixing 3 layer PP-R (Poly propylene Random copolymer) pipes conforming to IS: 15801, UV stabilized and anti-microbial fusion welded, having thermal stability for hot and cold water supply including all PP-R plain and brass threaded Polypropylene random fittings. This includes ...
DBOT (Design–Build–Operate–Transfer) model for Two (2) Foot Over Bridges (FOBs) and 40 gantry/hoarding banner on various locations within Rajkot Municipal Corporation limits.(3rd Attempt)
Water pipelines
COMPREHENSIVE REPAIRS TO TILING, FLOORING, PLINTH PROTECTION, ROOF COVERINGS AND SANITARY FITTINGS AT CERTAIN BUILDINGS AT 5 AFH UNDER GE (AF) JORHAT
Supply and laying of CPVC pipes of outer dia 16mm SDR 11 & plain CPVC SDR 11 fittings on walls/ceiling or laying in floors complete all as specified and as directed.
SPECIAL REPAIRS TO TOLET BLOCK AND ROOF SHEET AT APS KAMPTEE, UPGRADATION OF BLDG NO. P-294 UNDER KAMPTEE, CONSTRUCTION OF CONCRETE STAGE AT FORT AREA NAGPUR AND SPL REPAIR TO STREET LIGHT AND ALLIED E/M WORKS AT ARMY PUBLIC SCHOOL UNDER GE KAMPTEE.
Supplying and laying of CPVC pipes 16 mm SDR 11 & Plain CPVC SDR 11 fittings on walls/ceiling or laying in floors complete all as specified.
WELCOME MAINTENANCE FOR OFFRs AND OTHER SERVICES TO JCOs/ORs MD ACCN IN ZONE B AND C AREA UNDER AGE B/R-I UNDER GE (CENTRAL) KHADKI.
Supplying and laying of CPVC pipes, 16mm (outer Diameter) Dia SDR 11 & Plain CPVC SDR 11 fittings in trenches complete all as specified and as directed.
Redrilling of Tubewell, Maintenance of existing P.H, WTA with wiring supply of materials at Kolbansh MDTW (H.W.21) located at Mouza Kolbansh, Gazipur GP, JL No 107, Plot No44 under Amta II Dev. Block in Howrah District under Core Sector 2025 26 Pro
Earth work in filling in trenches after laying pipe lines (PVC, RCC, ACP etc.) with good earth obtained from excavation of field trenches in layers not exceeding 225 mm, including watering and ramming etc. layer by layer complete. (Payment will be made on the basis of measurement of finished quantity of work.)