Loading…
Loading…
3,748 results • Best match
Excavation, loading of pond ash from 111 hectare Ash pond of STPS Sarni and its transportation an unloading at designated locations of Construction of 4 laning of NHAI road project of Budhni to Shahganj bypass end.
Sr. No. 1 Loading of ash Iin vehicles at ash pond i/c excavation ,making all arrangementof suitable machines like poclain ,making all arrangement i/c temporary road on ash surface of pond, sprinkling of water to prevent fugitive ash emission ,all labour fuel charges etc. complete as per direction of Engineer In-charge (Base rate Rs 20.20 per cum) Note: Rate of GST may please indicate in TC. Bid Sr. No. 2 Transportation of Ash from 111 hectare ash pond of STPS, Sarni including covering ash surfaces in vehicles with tarpaulin for transportation of pond/PH-IV silo ash, all transportation and unloading upto designated place (Budhni to Shahganj bypass end of NH-146 B ) required toll tax payment, all fuel charges and overhead charges weighment of loaded vehicles engaged for transportation etc. Complete as per direction of engineer-in charge for following distances. Slab from 100 Km to 125 Km For 112 Km (Base Rate Rs. 461.27 Per Cum) For 114 Km (Base Rate Rs. 467.95 Per Cum) Note: Rate of GST may please indicate in TC. Bid (Percentage Rate should be quoted excluding GST) 2.Base rate has been derived from MPPWD SOR 2022
Construction of Clothing Ration and Misc store MT shed Tradesman shop Training shed WT office and store 20 KLD UG sump and 10 KLD STP at Tuting BOP of 49th Bn ITBP
Providing and laying integral cement based treatment for water proofing on horizontal surface at all depth below ground level for under ground structures as directed by Engineer-in-Charge and consisting of : i). I st layer of 22mm to 25mm thick approved and specified rough stone slab over a 25mm thick base of cement mortar 1:3 (1 cement : 3 coarse sand) mixed with water proofing compound conforming to IS:2645 in the recommended proportion over the leveling course (leveling course to be paid separately). Joints sealed and grouted with cement slurry mixed with water proofing compound. ii). 2nd layer of 25mm thick cement mortar 1:3 (1 cement: 3 coarse sand) mixed with water proofing compound in recommended proportions. iii). Finishing top with stone aggregate of 10mm to 12mm nominal size spreading @ 8 cudm/sqm thoroughly embedded in the 2nd layer. Using rough kota stone.
Annual Maintenance Contract for RO Drinking units, STP & ETP units at Line-2 metro stations (BIET to APTS - 29 Stns), RSS Switch Yard at PUTH Station and Peenya Depot
Annual Maintenance Contract for RO Drinking units, STP & ETP units at Line-2 metro stations (BIET to APTS - 29 Stns), RSS Switch Yard at PUTH Station and Peenya Depot
Comprehensive AMC of Split/Cassette/Ductable type AC machines installed at Webel Bhavan, Monibhandar,SDF,STP-II,Webel Tower-I and Incubation Centre, Salt Lake, Sec-V, Kol-91
Annual Maintenance Contract of Split/Cassette/Ductable type AC machines installed at Webel Bhavan, Monibhandar, SDF, STP-II,Webel Tower-I and Incubation Centre(X-1 building),Salt Lake, Sector-V, Kolkata-700091
Construction of Cement Concrete Pavement Road from JE(EandM) store to Digestor road and making drainage system functional at Kashipur STP under EE (C) SDW-NW/SE(SDW)-III
Construction of Cement Concrete Pavement Road from JE(E&M) store to Digestor road and making drainage system functional at Kashipur STP under EE (C) SDW-NW/SE(SDW)-III
Facility Management Services - LumpSum Based - OBRA TPS; O&M OF WTP STP ETP WATER SUPPLY RO & ANTILARVAL FOGGING; Consumables to be provided by service provider (inclusive in contract cost)
Facility Management Services - LumpSum Based - OBRA TPS; O&M OF WTP STP ETP WATER SUPPLY RO & ANTILARVAL FOGGING; Consumables to be provided by service provider (inclusive in contract cost)