Loading…
Loading…
3,769 results • Best match
Facility Management Services - LumpSum Based - OBRA TPS; O&M OF WTP STP ETP WATER SUPPLY RO & ANTILARVAL FOGGING; Consumables to be provided by service provider (inclusive in contract cost)
Facility Management Services - LumpSum Based - OBRA TPS; O&M OF WTP STP ETP WATER SUPPLY RO & ANTILARVAL FOGGING; Consumables to be provided by service provider (inclusive in contract cost)
Yamuna Nagar Town, Annual Mtc. estimate for Sewerage scheme Yamuna Nagar, District Yamuna Nagar for the year 2025 2026. Providing and Installing 1 No. Analyzer at 10.00 MLD STP Unit II Badhi Majra at Yamuna Nagar, for L and C Societies
Supply, installation, testing, commissioning, operation and comprehensive Annual maintenance of effluent quality monitoring system at 10.00 MLD STP Unit - II at Badhi Majra for online (Continuous) measurement of PH, Total Suspended Solids TSS), Chemical Oxygen Demand (COD), Biological Oxygen Demand (5DSingle analyzer with various sensors (spectral measurement in the UV-VIS range200-/20mm) performing reagent and chemical free analysis with automatic Cleaning of censor, signal cables and power cables, local data acquisition and display of data on continuous basis for up linking the data to ????, HSPCBandPHED, TUV approved complete in all respect as per Central pollution control and (CPCB) guidelines for online continuous monitoring system for effluents and as contained in scope of work in the notice inviting tender. a) Multi-parameter measuring converter, for connecting up to 18 intelligent sensors scope including 8 analog inputs/ outputs (4 inputs and 4 outputs) (04 20Ma), wide- range power supply Optical COD/BOD and TSS probe with spectral processing Or the UV-VIS range, for measurement in the Outlet/ effluent of waste water treatment plant at 10.00 MLD STP Unit - II at Badhi Majra integrated with automatic cleaning. b) Robust digital PH/ORP electrodes, with built-in preamplifier and temperature sensor with Automatic Temperature Compensation (ATC) Cable length 100 Meter (minimum). c) Sensor adapter cable for all intelligent sensors, with IP68 water proof, connection to the intelligent Sensor Net system. Cable length 100 Metter(minimum) d) Data transfer to CPCB, HSPCB and PHED servers during 4 years of Operation and Maintenance after commissioning after 3 month trial period (including 4 years of defect liability period e) Providing GSM 3G, 4G modem with mobile network connectivity including network charges for 4 years of Operation and Maintenance after commissioning after 3 month trial run (Including 4 years detect liability period). Make – Forbes Marshall or Horiba
Estimate for providing and laying STP treated water supply distribution pipe line for various parks in Sector- 14, OLD DLF Colony and Sector 17A ward no. 25 under MCG area.
Estimate for providing and laying STP treated water supply distribution pipe line for various parks in Sector- 14, OLD DLF Colony and Sector 17A ward no. 25 under MCG area.
Diversion of sewage water and sullage water line from Emerald Hostel to Jasper Hostel and laying of new sewage line from Shanti Bhawan towards STP-1 at IIT (ISM) Dhanbad
Providing consultancy services for the Affordable Housing Project, Road Work, Drainage Work, STP Work, Lake Development, Garden Development, Water Supply, WTP, Street light Etc and other development work of VUDA.
i.e. Building above 25mt height, Drainage work, Water Supply work, STP,WTP Work,
Estimate for Repair, operation and maintenance for 2-years of existing 30 KLD STP based on Sustainable Microbial Advanced Eco Reactor Technology at Chakkarpur and Sector - 44, Zone-IV, MCG.Recall
Operation and Maintenance of STP based on Sustainable Microbial Advanced Eco reactor Technology including min. dosing of 150 litrs of activated OSI culture along with 01 no. operator (8.5 hrs shift) 06 days a week. Cost includes basic preventive maintenance.