Loading…
Loading…
3,535 results • Best match
Service for Chemical Treatment of Cooling Water - glycol water treatment; glycol water treatment; Contracts for supply of glycol water treatment chemicals
Service for Chemical Treatment of Cooling Water - glycol water treatment; glycol water treatment; Contracts for supply of glycol water treatment chemicals
CA NO. GE AF NO.1/GUR-36 /2026-27 REPAIR/ MAINTENANCE OF EXTERNAL ELECT, STREET LIGHT, SECURITY LIGHT, DG SETS AND OTHER CONNECTED WORKS AND REPAIR/ MAINTENANCE OF SEWAGE TREATMENT PLANT 800 KLD AND OTHER CONNECTED WORKS AT SEKHON VIHAR
Testing of STP before treatment to analysis the following parameter as per IS 10500:2000 through Govt. approved agency:- a) Physicochemical parameters of water / eflluent sample b) Oil and grease, mg/l max. c) Total residual chlorine, mg/l max. d) Biochemical oxygen demand mg/l max. e) Chemical oxygen demand mg/l max. f) Suspended solids mg/l max. Note:- Water sample for testing shall be arranged by the contractor. 2. Testing shall be done at a span of every 3 months starting from the date of commencement.
Custom Bid for Services - Operation & Maintenance of Hazardous waste storage facility and Environmental Condition Monitoring for 3 years at BPCL, Bina Refinery Similar Category Customized AMC/CMC for Pre-owned Products Operation and Maintenance of ... Effluent/ Sewage Treatment ... Effluent/Sewage Treatment Plant ... Treatment Plant Repair, ... of Plant Systems/Equipments ...
Bina Refinery Similar Category Customized AMC/CMC for Pre-owned Products Operation and Maintenance of Effluent/Sewage Treatment Plant Repair
Electrical work connection to (i) Construction of S&T Goomti under work Provision of Second goods shed common running line of CSL-730m at Pharia (ii) Provision of modular Sewage Treatment Plant at NGT nominated stations Belthara Road (BLTR) & Khorshan Road(KRND) Stations.
Description:- Supply, Installation, Testing and Commissioning of 70 W High Bay Light Fitting with Pressure die cast aluminium alloy ACD12 housing (Heat sink) for effective thermal management, sturdiness & excellent corrosion resistant, Epoxy powder coated after phosphochromate treatment in metallic grey finish with high efficiency long life SMD LEDs with lumen efficacy of > 130 lm/W with wide beam optics to ensure better uniformity of light distribution. Operating temperature -10 degree
ENGINEERING PROCUREMENT AND CONSTRUCTION (EPC) FOR AUGMENTATION OF SEWAGE TREATMENT WORK SYSTEM AT CME KHADKI
Engineering, Procurement & Construction (EPC) of entire scheme of Sewage Treatment Plant (STP) of 3 MLD capacity at CME Khadki, SCADA Compatible including all civil infrastructure, electrical, mechanical, control, instrumentation works and other allied equipment for STP as per OEM recommendation based on latest technology to achieve the parameter as mentioned in scope of work ; along with its earthwork excavation and including all external & internal water and electric supply services beyond transformer for satisfactory running of plant including comprehensive maintenance for 05 years (including 2 years of Defect Liability Period) from the date of completion of works .
REPAIR/REPLACEMENT OF SEWAGE LINES, MANHOLES, SEWAGE DUCTS, CRUMPLE TREATMENT AND ALLIED WORKS UNDER AOR OF AGE B/R CHANDIGARH
Providing water proofing treatment to RCC sunken slab as specified and directed as under:- (a) Cleaning the existing RCC sunken slab and vertical wall/RCC beam and hacking the surface. (b) 15mm thick plastering over the floor & vertical surface in CM 1:4, mixed with liquid water proofing compound @ 200ml per 50 kg of cement trowelled to even and smooth finish without using extra cement .(Water proofing compound shall be measured and paid separately). (c ) filling the sunken portion with water for 72 hrs and carring out the ponding test.(Any leakage /seapage noticed shall be repaired). (d) Applying two coats of elastomaric acrylic water proof coating Make: Dr. Fixit of pidilite or equivalent per sqm in each coat with roller application.(Note: Each coat of elastomaric acrylic compound requires 6-8hrs to dry up itself second coat shall be applied on getting the first coat completely dried up complete all as specified and directed. (NOTE: Water proofing compound shall be measured and paid separately under respective item)