Loading…
Loading…
3,535 results • Best match
Operation & Maintenance work for sewage treatment plant (20.20 MLD) based on SBR with MCC panel room, DG set and all contingent civil, electrical, mechanical, piping and instrumentation works of entire system for 5 years at Valsad, District: Valsad, Gujarat (2nd call)
Capacity of Sewage Treatment Plant 20.20 MLD STP Referance
State Plan-2025-26-Guruvayur Drainage Scheme- Supply-Installation- Testing and Commissioning of Sewage Transfer pump seta t S e w e r a g e T r e a t m e n t P l a n t - Chakkamkandam- Guruvayur-General Civil Work
OD162481/2025-2026:Fixing of Sewage transfer pump with all accessories - Supply, Installation, Commissioning, testing and trial run of submersible sewage handling type pump, with specified discharge and head and of reputed make, 25 HP including suction and delivery pipes ,starter, induction motor, capacitor etc complete as per the direction of engineer in charge.
COMPREHENSIVE REPAIR AND MAINTENANCE OF SEWAGE TREATMENT PLANTS AND ALLIED WORKS, DG SETS AND CONNECTED ITEMS SECURITY LIGHT, STREET LIGHT ETC AT SATWARI, RIDGE AREA, ROULKI AREA, MH RAIPUR SATWARI ETC AT MIL STN JAMMU UNDER GE SATWARI
Carry out water (Raw and treated ) from all STP plants and testing for bacterial, chemical and biological analysis of sewage water treated water from Govt approved lab for following parameters and submission of test reports all as directed: - (a) PH, (b) Chemical Oxygen demand/COD, (c) Biological Oxygen Demant/BOD (d) Total Suspended solids, (e) Oil and Grease (f) TKN, (g) Total Coliform, (h) Organism MPN (k) Dissolved Oxygen Note: Water testing shall be carried out twice in the peroid of contract and empty collection bottle will be arranged by the contractor.
Design, Supply, Transportation, Construction, Installation, Testing, and Commissioning of 2 Nos. of Sewage Treatment Plants at Doom Dooma MB for 1.55 MLD in WSP with FSTP for 6 KLD and Chapakhowa MB for 1.0 MLD in ASP with FSTP for 6 KLD
Stage I: Construction of 1.5 MLD Capacity STP in Waste Stabilzation Pond (WSP)Technology and 6 KLD FSTP at Doom Dooma ULB
with all contingent civil, including staff quarter, electrical, mechanical, piping and instrumentation works with three months trial run including three year defect liability period and operation and maintenance of entire system for 5 years.
Construction, Site development, testing, commissioning and giving satisfactorily trials of 1.4 MLD STP of SBR technology which can be accommodated in limited identified land space consisting of Primary, Secondary and Tertiary Treatment Units as per the requirement of designed CPHEEO norms relevant IS codes etc. necessary piping work with required valves, gates, drains, path Ways, Administration Block cum Laboratory, Laboratory Equipments, Internal Roads, Pathways, Compound Wall, Tools and plants, Treated effluent arrangements complete as turnkey job with all involved Civil, electrical, (Including transformer) Instrumentation and mechanical works Inclusive of following Items, units as per detailed specifications for civil, electrical, Instrumentation and mechanical components complete to achieve latest CPCB/ HPPCB / CPHEEO discharge standards pH 6.5- 8.5, BOD 10ppm, COD50ppm, TSS 10ppm, NH4-N 5ppm, N-Total10ppm, Total Phosphorus (PO4-P) =1 ppm, Faecal Coliforms 100 MPN/100ml and Total residual Chlorine =1 ppm to get recyclable quality of water for Industrial / agricultural purposes. .All units shall be interconnected with administration building by suitable or RCC overhead walkways, boundary wall of average 4.0 mtr complete fencing (Campus should covered with boundary wall and fencing) at the STP component as per the scope and confirming norms as mentioned above. The plant should be completely automated with PLC - SCADA complete from Primary, secondary and Tertiary treatment etc price of items including GST and payment will be released on prorata basis complete as per Direction of Er-in Charge.(Schedule -B)
DETAILED PROJECT REPORT FOR PROVIDING SEWERAGE FACILITY and SEWAGE TREATMENT PLANT MUNAK DPR FOR AUGMENTATION OF W/S SCHEME MUNAK BY INSTALLATION OF TUBE WELLS and LAYING THE DI PIPE LINES IN VILLAGE MUNAK DISTRICT KARNAL UNDER SWARAN JAYANTI MAH
(PART-A):- MUNAK VILLAGE DISTT. KARNAL: W/S SCHEME “Installation of Tube wells, pump chamber, boundary wall, Laying the distribution lines and house connectionincluding Operation and Maintenance cum defect liability period for 06 years after successful completion of 3 Months trial run period complete in all respect. ” (PART–B):-MUNAK VILLAGE DISTT. KARNAL: SEWAGE SCHEME “Laying of sewerage system, construction of manholes, inspection chamber and construction of 2.50 MLD STP(SBR technology based) SCADA / PLC controlled including MPS and IPS comprising wet well sump, boundary wall, pump chamber, Rising Main, staff quarter, PumpingMachinery, DG set etc. including Operation and Maintenance cum defect liability period for 06 years after successful completion of 3 Months trial run period complete inall respect.” (The amount shall be included of complete cost of HSR + N.S. Items + O&M cost)