COMPREHENSIVE B/R REPAIR WITH WATER PROOFING TREATMENT TO TOILET, REPAIRS TO ROOF, CEILING, DAY TO DAY MAINT AND OTHER CONNECTED WORKS AT SITE A3 OF NAVAL BASE KARWAR
M/L for water proofing treatment by applying oil bound bitumen primer, having a density of 0.87 - 0.89 Kg/lit, @ 0.40 ltrs/Sqm, providing and laying APP modified water proofing membrane weighting not les than 3.50 Kg/Sqm of approved make including minimum 10 cm side lap and 15 cm end lap, laid and pasted with blue flame torching applications and finally finishing with two coats of solar reflective bituminous aluminium paint @ 0.1.Kg/Sqm complete all as specified and directed.
Works for Complete Repairing of Johnson make pump at the Water Treatment Plant (WTP), NMSA and DB pumps at Wardha River Pumping Station (WRPS), New Majri Sub Area
Revamping of Valves, Electric Actuator and Control Panel for Filter Bed of BALUPUR Water treatment Plant at Ratua-I Block under Malda Division, PHE Dte, Malda. (2nd Call)
Emergent roof treatment work by application of 3 mm thick pre fabricated plastomeric water proofing membrane APP on roof of block E type C1 at RHE Kalyani Nadia.
Supplying & laying 3mm thick pre-fabricated plastomeric water proofing membrane conforming to EN 12311-1 & ASTMD 5147, manufactured with atactic poly propylene (APP) modified premium grade asphalt , specially reinforced with non-woven polyester core with polyester reinforcement @160 gms per sqm & both faces covered with thermo-fusible polyethylene film /MineraL on top face over a coat of primer @ 0.40 lit/sqm of manufacturer's specification on Smooth, clean dry surface prepared wherever required. Lap joint shall be provided of 75 mm in longitudinal & 100 mm in transverse direction and fused using LPG/ Propane torch employing extra care ensuring full bondage, complete removal of entrapped air and sealing edges into grooves in appropriate manner as per direction of Engineer -in-charge all complete including materials,labour and applicable taxes. (Payment shall be made on the basis of finished surface area.). Membrane Property: Softening Point > 150 deg C, Cold Flexibility -6 deg C, Tensile Strength, N/cm : 600 (longitudinal), 450 (transverse), Tearing Strength, N: 300 (longitudinal), 200 (transverse).
Custom Bid for Services - JOB CONTRACT OF QUALITY MANAGEMENT OF BOILER & STEAM CYCLE CHEMISTRY AND OPERATION OF WATER TREATMENT PLANTS OF CHEMISTRY DEPARTMENT CPP-II & CPP-III, NSPCL-DURGAPUR Similar Category Operation and Maintenance Power ... House/Power Plant
Custom Bid for Services - JOB CONTRACT OF QUALITY MANAGEMENT OF BOILER & STEAM CYCLE CHEMISTRY AND OPERATION OF WATER TREATMENT PLANTS OF CHEMISTRY DEPARTMENT CPP-II & CPP-III
Replacing damaged tiles,leak rectification,solid masonry works,Man hole repair,RCC cover slabs,water proofing treatment,Vitrified tiles,Acid washing ,GI tubular grill work, GI sheet etc
22.5:Providing and laying water proofing treatment in sunken portion of WCs, bathroom etc., by applying cement slurry mixed with water proofing cement compound consisting of applying : a) First layer of slurry of cement @ 0.488 kg/sqm mixed with water proofing cement compound @ 0.253 kg/sqm. This layer will be allowed to air cure for 4 hours. b) Second layer of slurry of cement @ 0.242 kg /sqm mixed with water proofing cement compound @ 0.126 kg/ sqm. This layer will be allowed to air cure for 4 hours followed with water curing for 48 hours. The rate includes preparation of surface, treatment and sealing of all joints, corners, junctions of pipes and masonry with polymer mixed slurry.