Loading…
Loading…
3,485 results • Best match
REPAIR /MAINTENANCE/REPLACEMENT OF BUTTERFLY VALVES, SLUICE VALVE, NON-RETURN VALVE, AND SUPPLY OF WATER TREATMENT CHEMICALS WITH ALLIED WORKS AT AYODHYA CANTT UNDER AGE(I) AYODHYA
Supply only liquid chlorine sodium hypochlorites (Grade-I) sutable for treatment of drinking water, with 10% chlorine contents by volume conforming to IS-11673 in sealed non-chemical re-actined/oxidation LDPE containers complete all as specified and directed. Note : The rates included for Distribution of liquide Chlorine at various pump houses by contractor as directed by Engr-in-Charge.
water proofing treatment , Sealing of expansion joints structural elements, vitrified floor tiles ,Grouting , Pressure grouting, Wall painting , aluminium work ACP board,p panelling, Steel work etc
22.6:Providing and laying water proofing treatment on roofs of slabs by applying cement slurry mixed with water proofing cement compound consisting of applying : a) after surface preparation, first layer of slurry of cement @ 0.488 kg/ sqm mixed with water proofing cement compound @ 0.253 kg/ sqm. laying second layer of fibre glass cloth when the first layer is still green. Overlaps of joints of fibre cloth should not be less than 10 cm. c) third layer of 1.5 mm thickness consisting of slurry of cement @ 1.289 kg/ sqm mixed with water proofing cement compound @ 0.670 kg/sqm and coarse sand @ 1.289 kg/sqm. This will be allowed to air cure for 4 hours followed by water curing for 48 hours. The entire treatment will be taken upto 30 cm on parapet wall and tucked into groove in parapet all around. d) fourth and final layer of brick tilling with cement mortar (which will be paid for separately. For the purpose of measurement the entire treated surface will be measured)
Work of Comprehensive Operation & Maintenance (O & M) of CWSS Stage-IV, Phase-II, 550 MLD Water Treatment Plant (WTP) at T.K. Halli for 5 years(Call-3)
Work of Comprehensive Operation & Maintenance (O & M) of CWSS Stage-IV, Phase-II, 550 MLD Water Treatment Plant (WTP) at T.K. Halli for 5 years
CERTAIN REPAIRS TO TOILETS FLOORS JOINERY PLUMBING SANITARY FITTINGS ROOF TREATMENT AND CLEANING OF WATER TANKS AT VNC UNDER AGE BR-II OF GE (CENTRAL) BANGALORE
M&L for Applying oil bound bitumen primer @ 1.50 Kg/Sqm and providing 3 mm thick APP modified water proofing membrane weighing 3.6 kg/sqm reinforced with non woven polyester matt weighing not less than 150 gm /sqm having softening point not less than 140 centigrade, having tensile strength of 650N/sqm and 350 N/sqm in longitudinal and transverse directions respectively of the reinforced tearing strength of 180N by torch application with minimum 10cm side overlap and 15cm end lap, applying a coat of blown grade hot bitumen 85/25 over the membrane @ 1.2 Kg /Sqm top of membrane surface shall then be finished with solar reflective bituminious aluminium paint @ 0.10 Kg/Sqm complete all as directed including taking down existing treatment all as specified.
AR WORK FOR CLEANING OF OVERHEAD TANK/SUMPWELL/WATER TANK BY ECO FRIENDLY AND BIO DEGRADED CHEMICAL TREATMENT AT MLA REST HOUSE UNDER SUB DN 5
AR WORK FOR CLEANING OF OVERHEAD TANK/SUMPWELL/WATER TANK BY ECO FRIENDLY AND BIO DEGRADED CHEMICAL TREATMENT AT MLA REST HOUSE UNDER SUB DN 5
Providing manpower on outsourcing basis for operation and maintenance of Renuka Sagar Reservoir, Water Treatment Plant, distribution system, and allied works within town limits under the jurisdiction of the Water Supply Department for the year 2026-27
Assistant Water Supply Operator TMC RMD