Loading…
Loading…
745 live2,185 closing this weekmost from E-IN-C BRANCH - MILITARY ENGINEER SERVICES and Rajasthan Council of School Education
745 results • Best match
Repair of S.T.P. Phagwara (28 MLD) for utilization of treated water through Underground Pipeline System
Construction of 400kld Stp,38nos leach pit each having 10kld ,Interception of drain
... With Grit Chamber Before STP on any proven technology including Preliminary Treatment of waste water / raw water, secondary treatment ...
Construction of interception drain 700,500,400kld stp leach pit 10 nos each have 10kld
... with Grit Chamber Before STP on any proven technology including Preliminary Treatment of waste water / raw water, secondary treatment ...
Providing urgent Patch repair work of CC road at CHP area, STPS Sarni
Operation and Maintenance (O and M) of 2.50 MLD STP-II at Brundaban colony for two years(2027-29).
... maintenance of existing 2.50 MLD Sewage Treatment Plant named as STP-II with supply of experienced ...
Installation, Testing and Commissioning of 500 KVA, 11kV/433V Transformer at Township Sub -Station No.-1 and associated job for strengthening of LT network at the STPS Township under EM-OPH Dept STPS.
Construction of Shed on pits near STP Garhdiwala (SBM)
Construction of Shed on pits near STP Garhdiwala (SBM)
Development of road from Karma height to Tapavan STP
Development of road from Karma height to Tapavan STP
Supply of PLC Components for 4 MLD STP Derabassi.
Supply of PLC Components for 4 MLD STP Derabassi.
Construction of interception drain,700,400kld Stp 16 nos leach pit each capacity 10kld
... with Grit Chamber Before STP on any proven technology including Preliminary Treatment of waste water / raw water, secondary treatment ...
Operator for Operation, Watch and ward, Report Generation at SCADA MCS room of all sewage pumping stations, main pumping stations, including OCEMS of all STPs Varanasi
Operator for Operation, Watch and ward, Report Generation at SCADA MCS room of all sewage pumping stations, main pumping stations, including OCEMS of all STPs Varanasi.
Interception and Diversion of Nallahs with STP works Project of Kymore town under SBM 2.0
... Diversion of Nallahs and setup STP works Project of Sohagpur... satisfactorily trials of STPs -1 Nos 0.85 MLD Constructed... from Pumping Station to STP. 5.Establishment of 4 Nos. ...
Laying of HDPE pipeline, Civil Work and Pumps Installation at project STP RCF Jalal Bhulana and Repair of Pipeline Motors and Control Panel of STP Kapurthala
Project : Underground Pipeline Project for Utilization of Treated Water for Irrigation at STP RCF (JALAL BHULANA), KAPURTHALA (2 MLD)
Deputation of Expert Service Engineer during Unit 6 Air Preheater Overhauling under BMD, STPS
Service contract for 50 Mbps ILL Connection for 03 Years under ITC Dept., STPS.
Repair and maintenance Work of Old 10 MLD STP Soorwal.
... Analyzer with panel for STP effluent measurement including: ...
Repair and maintenance Work of Old 10 MLD STP Soorwal.
C/O foot path near STP at Ward No. 04.
construction of interceptor drain 800kld stp 3kld co treatment 20nos leach pit having capacity 10kld
... technology including Preliminary Treatment of waste water / raw water, secondary treatment , tertiary treatment ( if... , electric connection in STP if required for complete ...
Repair and Refurbishment of Godrej Chairs Installed in Service Building of PH-4, STPS, Sarni
PROVN OF STP FOR JCOs/OR MD ACCN AT JINDRAH UNDER GE (A) DHAR ROAD
... all electrum mechanical STP, power and control cables... and instrumentation with STP panel etc. complete including... contractor to design the STP of required size/capacity ...
C/O Plum concrete retaining wall approach road to STP Theog
Consultancy services for evaluation, up gradation and modernization of STP Theog
... proposal for the existing STP at Theog and STP at Narkanda, constructed ...
Const. of open Gem near STP Plant in ward no.12
Const. of Open Gem near STP plant in ward no.12
Annual contract for operation and maintenance of STP at RGTPP, Ramgarh.
PROVN OF 02XSTP AT JNE COMPLEX AND 01 NO STP AT OTHER LOCATION UNDER GE (N) UDHAMPUR
... testing, commissioning of sewage treatment plant (450 KLD Capacity) consisting ...
Repairing and Rewinding of 315 KVA three phase Transformer at Nattar STP
Annual maintenance of 5 MLD STP Dharuhera for the year 2026-2027
P/L OCEMS and Maintenance of 2 Years for STP MC Dasuya.
P/L OCEMS and Maintenance of 2 Years for STP MC Dasuya.
C/o 5 Nos. 250 bedded Boys Hostels (G plus 8) & 3 Nos. 250 bedded Girls Hostels (G plus 8) at NIT, Trichy. SH: Providing consultancy service for obtaining Environmental Clearance (EC) for entire campus such as existing buildings & STP and proposed ... & STPs of ...
Overhauling of various Instrumentation and control system During AOH 11 of 2x250 MW IMD 4 STPS Sarni
Tender Inviting Authority: SE(P&W), MPPGCL, STPS
Providing cement concrete work and trench covers in plant area at STPS.(As and when required basis)
Construction of 200 MLD MPS, 100 MLD STP along with Bio-CNG Plant and OandM for 10 years after completion of 1 year Defect Liability Period at, Dhanwapur, Gurugram
... Station (MPS) and 100 MLD Sewage Treatment Plant (STP) based on Sequential Batch ...
Preparation of Detailed GIS Based Project Report(DPR) for intercepting the untapped drains to divert them to the existing STP or new proposed STP site for treatment at Bansberia, Hooghly District.
... divert them to the existing STP or new proposed STP site for treatment at Bansberia ...
Preparation of Detailed GIS Based Project Report(DPR) for intercepting the untapped drains to divert them to the existing STP or new proposed STP site for treatment at Chandannagar, Hooghly District
... divert them to the existing STP or new proposed STP site for treatment at Chandannagar, ...
Preparation of Detailed GIS Based Project Report (DPR) for intercepting the untapped drains to divert them to the existing STP or new proposed STP site for treatment at Konnagar Hooghly District
... divert them to the existing STP or new proposed STP site for treatment at Konnagar. ...
Construction of (G plus 8) storied building for two nos Girls hostel double occupancy (block-3,4) and three nos boys hostel (block-3,4) double occupancy and block no 2 single occupancy, dining and kitchen (G plus 2/3) sub station building (G) ... internal water supply, ... strom water drain, ... rain water harvesting, ... landscapping, sewerage treatment plant , ...
upgradation of SCADA system for synchronized operation of all electromechanical equipments along with requisite license software both engineering and operating license for 6 MLD STP Alluchibagh 2.21 MLD STP Rajbagh 02 Jobs
Preparation of Detailed GIS Based Project Report(DPR) for intercepting the untapped drains to divert them to the existing STP or new proposed STP site for treatment at Uttarpara Kotrang, Hooghly District
... divert them to the existing STP or new proposed STP site for treatment at Uttarpara-Kotrang ...
Preparation of Detailed GIS Based Project Report(DPR) for intercepting the untapped drains to divert them to the existing STP oror new proposed STP site for treatment at Baranagar, North 24 Parganas District.
... divert them to the existing STP or new proposed STP site for treatment at Baranagar ...
Preparation of Detailed GIS Based Project Report (DPR) for intercepting the untapped drains to divert them to the existing STP or new proposed STP site for treatment at Naihati, North 24 Parganas District.
... divert them to the existing STP or new proposed STP site for treatment at Naihati, ...
Preparation of Detailed GIS Based Project Report (DPR) for intercepting the untapped drains to divert them to the existing STP or new proposed STP site for treatment at Garulia, North 24 Parganas District.
... divert them to the existing STP or new proposed STP site for treatment at Garulia, ...
Preparation of Detailed GIS Based Project Report (DPR) for intercepting the untapped drains to divert them to the existing STP or new proposed STP site for treatment at Bhatpara, North 24 Parganas District.
... divert them to the existing STP or new proposed STP site for treatment at Bhatpara, ...
Preparation of Detailed GIS Based Project Report (DPR) for intercepting the untapped drains to divert them to the existing STP or new proposed STP site for treatment at Panihati , North 24 Parganas District.
... divert them to the existing STP or new proposed STP site for treatment at Panihati ...
Preparation of Detailed GIS Based Project Report(DPR) for intercepting the untapped drains to divert them to the existing STP or new proposed STP site for treatment at Kamarhati, North 24 Parganas District.
... divert them to the existing STP or new proposed STP site for treatment at Kamarhati, ...
Preparation of Detailed GIS Based Project Report (DPR) for intercepting the untapped drains to divert them to the existing STP or new proposed STP site for treatment at Titagarh , North 24 Parganas District.
... divert them to the existing STP or new proposed STP site for treatment at Titagarh ...
Master Sew Scheme Fbd -Design, Construction, Commissioning, Testing and Trial Run of 03 Nos. Faecal Sludge Treatment Plant (FSTPs) of 50 KLD Capacity Each at Mirzapur, Badshahpur and Pratapgarh,on the site existing STPs Faridabad, Haryana, including
... other purpose required at Sewage treatment plant i/c Providing and fixing ...
Supply and Installation of Spare parts for OCEMS of STP in Udhagamandalam Municipality
Supply & Installation of Spare parts for OCEMS of STP in Udhagamandalam Municipality
Providing and fixing 11KV HT line works for load extension at Tapovan STP.
Providing and fixing 11KV HT line works for load extension at Tapovan STP.