Loading…
Loading…
3,376 results • Best match
Comprehensive Operation, Preventive Maintenance & Repairs of all Civil Structures, Various type of Pipeline, Various type of Valves, Storage Structures,5 MLD Water Treatment Plant (With chemical charges)Machineries ,All Pumping Machineries for ... potable Water to ... supplied water at ... raw water charges ...
Structures,5 MLD Water Treatment Plant (With chemical
At Sealdah - Construction of Water Treatment cum Recycling Plants of capacity 260 KLD at outlet no. 1 near platform no. 1A/1, 650 KLD outlet no. 2 & 3 near Beliaghata ROB ( Bridge no. S/2 ), 390 KLD at outlet no. 4 near RMS Parcel & cash Office and ... raw water and ... treated water , ...
"""Supply, Fitting and Fixing of Submersible Set type Clear Water Feed Pump with Motor as: Pump Capacity: 1.2 Lps Total Head: 12.0M Auto Coupling - DN 80 (SS304) for Pump Motor Capacity: 1.5 HP Max rising main velocity: 2.5 m/sec."""
Interception Diversion of Nallahs with STP works ProjectofSingoli town under SBM 2.0
1. Design and build sewage treatment plant of installed capacity 0.82 MLD and all appurtenant structures and allied works; 2. Survey, review the designs, redesign where necessary, and diversion works of Nallahs with interception sewer of about 0.800 Km length including survey, design, construction of 1. No. of Main Pumping stations and all appurtenant structures and allied works; and 3. Providing and Laying of Pumping Main From MPS to STP of 200 mm Dia DI K7, 10 m Length 4. Providing and laying of HT feeder connection 500 m 11 KV 5. Plantation of Trees around the STP area.
As mentioned in NIT
Maintenance of 150 KLD Sewage Treatment Plant at Thapasya building including the cost for routine servicing/maintenance and breakdown repairs as and when required ensuring that plant do not remain out of functioning for more than 10 hours due to unforeseen breakdown,cost of required spares,consumable chemicals and lubricants (except water and power) and charges to include liasoning with KSPCB for renewals, periodical sampling of treated effluent samples as per KSPCB norms etc. complete and as per directions of Engineer-in-charge.
PPP Project to develop 250 to 500 KLD capacity STPs (05 Nos) at different locations in NDMC area and run for 12 years.
Supply of treated water with minimum specified parameters mentioned in Appendix-5A from Sewage Treatment Plant with the capacity output installed / constructed by using the municipal sewage provided free of cost for twelve years of concession period from the various locations of 1. Inside Bapu Dham Housing Complex: 250 KLD, 2. At Horticulture Nursery NDMC opposite INA Metro Station: 500 KLD, 3. At island existing at the intersection of Rajendra Prasad Road & Ashoka Road: 500 KLD., 4. At Bharti Nagar Sewerage Pumping Station: 500 KLD, 5. At Nehru Park: 500 KLD. (Schedule of quantity is for 12 years)
Repairing, Maintenance and Servicing of existing of 3 MLD STP on as is where is basis to make it fully functional and running and Opreation in MDU Rohtak
Operation, routine maintenance and periodic servicing of the above mentioned 3 MLD (sequential batch reactor technology) sewage treatment plant for one year ( after completion of stabilization period) at Maharshi Dayanand University. The O&M period can be extended further for one year or more based on satisfactory handling/ operation of STP complete in all respect to the entire satisfaction of Engineer-in-charge..