Loading…
Loading…
3,864 results • Best match
Operation and Maintenance of 100 KLD MBR Technology Sewage Treatment Plant at CPWD Complex, HSR Layout, Bangalore.
Operation and Maintenance of Effluent/Sewage Treatment Plant - Complete System; 01 Nos 30KLD & 01Nos 60KLD; Functional but outside AMC and Warranty
Operation and Maintenance of Effluent/Sewage Treatment Plant - Complete System; 01 Nos 30KLD & 01Nos 60KLD; Functional but outside AMC and Warranty
Custom Bid for Services - ROBUST ROOF DRAIN INSTALLATION AT MUNDRA TERMINAL Similar Category Operation and Maintenance of Effluent/Sewage Treatment Plant
Custom Bid for Services - ROBUST ROOF DRAIN INSTALLATION AT MUNDRA TERMINAL Similar Category Operation and Maintenance of Effluent/Sewage Treatment Plant
Operation and Maintenance of Effluent/Sewage Treatment Plant - Complete System; OEM Authorised Service Provider (ASP); Functional but outside AMC and Warranty
Operation and Maintenance of Effluent/Sewage Treatment Plant - Complete System; OEM Authorised Service Provider (ASP); Functional but outside AMC and Warranty
Used Water Management Project in Municipal Council Baramulla under UWM SBM 2.0 by way of Design and Construction of 6.0 MLD Sewage Treatment Plant Construction of Interception and Diversion Structures at Outfalls Conveying Mains IPSs incl. Operation
V. Infrastructure Facilities for 6.0 MLD STP: Complete site development, including onsite infrastructure facilities (within the premises) yard lighting , CC Road 3.5m wide, construction of the peripheral Compound Wall with Chain Link Fencing and MS Gate, and offsite (linking) infrastructure facilities external electrification, necessary power connections, transformer, and metering Providing external water supply connection at STP, Approach road 5.5m wide with 1m shoulders on either side along with Rising Main for peak flow rate as per CPHEEO specifications/ Guidelines, with screen channel, including effluent disposal arrangement/clear water pump station & electrical substation incl transformer. The selection of sewage treatment plant criterion will be guided by the least life cycle cost and latest effluent discharge standard. The plant shall include the complete civil, mechanical, electrical and instrumentation components including on-line Continuous Effluent monitoring system (OCEMS) for Treated effluent at the site and shall ensure that the discharge standards as per design parameters are met as per proposed technology (all Civil, E&M Components) including DG Set, electromagnetic flow meters (at Inlet &outlet), Servo Voltage stabilizer (AVR) of required capacities and scope of work and design shall be based on sound engineering and prevalent norms. All necessary infrastructure connected with STP shall have to be got designed and vetted from reputed Government Institute viz IIT Jammu /NIT Srinagar/Govt Engg College Jammu. The scope shall also include all taxes, lift and leads complete. STP will have SCADA system so that whole plant can be operated from control room & linked to all IPS at one point and all relevant information is available in control room at any given point. etc complete item of work as per standard specification &tender. Special Condition of Contract (SCC) Design & Drawing Submitted by the Contractor& Approved by Competent Authority As directed by the Engineer in Charge.
Design, Drawing, Const. Testing and Comm. of S/S, 100 KLD Sewage Treatment Plant (STP) and 25 KLD Effluent Treatment Plant (ETP) for Subdivisional Hospital in Hinjilicut including Operation and Maint. for a period of Five Years
Construction of STP & ETP Designing, drawing, supplying, constructing, testing & commissioning of Effluent Treatment Plant (ETP) & Sewage Treatment Plant (STP) of required capacity and appropriate technology (MBBR / SBR / MBR) including all civil, electro-mechanical works, tertiary treatment system, automation etc all complete to achieve desired effluent quality as per NGT norms. (Excluding cost of SCADA system, PLC, plant room, chemical storage room, yard lighting, compound wall, external electrification, treated water storage sump and re-use/disposal arrangements) ETP- 25 KLD STP- 100 KLD