Loading…
Loading…
9,247 results • Latest
Thorough Repair and Renovation Work For Staff Quarter (West Site) of Kakdwip Highway Sub-Division under Diamond Harbour Highway Division in the District of South 24 Parganas during the Year 2025-26 .
PROCUREMENT OF TYRE,TUBES AND FLAPS FOR CIF, WB
Development of the Reception Counter with adequate seating arrangements and restoration of the damages of Sagar Inspection Bungalow (Sagar Balaka bungalow first floorand Anex Building) at Sagar Island under DHHD.
Horizontal extension for facilitate separate rooms of all Junior Engineers and other ancillary works of Falta E.P.Z Highway Sub-Division under Diamond Harbour Highway Division in the District of South 24 Parganas during the year 2025-26.
Land Scapping of Sagar Balaka IB compound (North Side of Main Building) including development of the existing ground and other allied work at Sagar Island under Diamond Harbour Highway Division during the year 2025-26
Construction of R.C.C Drain in different stretches from Ch. 0.800 Kmp to 0.953 Kmp on left side of Kakdwip Steamerghat Road under Diamond Harbour Highway Division during the year 2025-26.
M/R to S/E in between 4.500 KM to 4.650 KM at M/Kumirmari facing R/B of R/Bagna in Block - Gosaba, P.S.- Sundarban Coastal, Dist-(S) 24 Pgs under JID.(2nd call to the 1st Tender of e-NIT No. WBIW/EE-I/JOY/NIT-22(e)/2025-26,S.L.- 12)
Replacement of North Side Damaged Approach Slab and Repairing of Deck Slab of Kholakhali Bridge at 12.50 Kmp. of Joynagar Jalaberia Kultali Road under Lakshmikantapur Highway Sub Division of Diamond Harbour Highway Division.
Construction of Road Side Guard Wall at ATASURA along Dakshin Barasat Magrahat Usthi Road in between 3.00 Kmp. to 4.00 Kmp. under Diamond Harbour Highway Sub - Division of Diamond Harbour Highway Division in the District of South 24 Parganas.
Repairing and Maintaince of Dakshin Barasat Magrahat Usthi Road from 0.00 Kmp. to 12.00 Kmp. in stretches under Diamond Harbour Highway Sub - Division of Diamond Harbour Highway Division in the District of South 24 Parganas.
Construction of Box Culvert over Drain and Approach Road to Far Filed Monitoring System under Diamond Harbour Highway Sub Division of Diamond Harbour Highway Division in the District of South 24 Parganas.
Surgical Sutures (Q2)
Construction of Paver Block Road at Magrahat Bazar at 8.00 Kmp. to 9.00 Kmp. of Dakshin Barasat Magrahat Usthi Road under Diamond Harbour Highway Sub Division of Diamond Harbour Highway Division in the District of South 24 Parganas.
E/R of S/E damaged due to Amabasya Kotal from 18.01.26 to 25.01.26 in between 5.550 km to 5.640 km at M/Amtali facing R/B of R/Puinjali in Block-Gosaba, P.S.-Sundarban Coastal , Dist-(S) 24 Pgs under JID.
Construction of Paver Block Road at Bijoygunj Bazar along 0.00 Kmp. of Lakshmikantapur Mandirbazar Chakdah Road under Diamond Harbour Highway Sub Division of Diamond Harbour Highway Division in the District of South 24 Parganas.
Supply of empty Cement Polythene Bags and Nylon cages netting for emergency flood fighting measures at Basanti (I) Sub-Division at Block and PS Basanti, Dist-(S)24 Pgs under JID.(2nd call to the 1st Tender of WBIW/EE-I/JOY/NIT-22(e)/2025 -26,S.L.- 36
M/R to Mahisara and Laxmangheri lead channel and sluices at M/Moukhali -Kumrakhali Block-Canning-II,P.S.- Canning Dist-(S) 24 Pgs under JID.(2nd call to the 1st Tender of e-NIT No. WBIW/EE-I/JOY/NIT-22(e)/2025-26
M/R to Sundarban Embankment in between 2.860 KM to 3.072 KM at mouza Manmathanagar facing right bank of river Bidya in Block - Gosaba, P.S.- Gosaba Dist-South 24 Paraganas under Joynagar Irrigation Division.
Emergent restoration of Sundarban Embankment damaged during Full Moon Kotal on and from 30.07.2026 to 03.08.2026 for a length of 30.0 M from ch 24.150 KM to 24.180 KM at Mouza- Brajaballavpur facing river Walls Creek(L/B) under Patharpratima Irrigat
Ts Const of coverslab CC drain from the shop of Selim Laskar to Highdrain Khal at Shibnagar Majherpara for LWM Purpose. ID- 112334232
Construction of own LPG Godown
Ts Const of coverslab CC drain at Jumainaskar Bazar for LWM Purpose. ID- 112339557
M/R to Sundarban Embankment in between 3.100 KM to 3.286 KM at mouza Manmathanagar facing right bank of river Bidya in Block - Gosaba, P.S.- Gosaba Dist-South 24 Paraganas under Joynagar Irrigation Division.
M/R to Sundarban Embankment in between 4.250 KM to 4.370 KM at mouza Puinjali facing Right bank of river Raimangal in Block - Gosaba,P.S.- Sundarban Coastal Dist-South 24 Paraganas under Joynagar Irrigation Division.
M/R to Sundarban Embankment in between 4.100 KM to 4.220 KM at mouza Puinjai facing Right bank of river Raimangal in Block - Gosaba,P.S.- Sundarban Coastal Dist-South 24 Paraganas under Joynagar Irrigation Division.
M/R to Sundarban Embankment at Mouza Kumirmari in Between 5.800 KM to 5.840 KM at left Bank of River Sarsa at Block- Gosaba, P.S. Sundarban Coastal ,Dist-South 24 Paraganas under Joynagar Irrigation Division.
M/R to Sundarban Embankment in between 4.700 KM to 4.950 KM at mouza Puinjai facing Right bank of river Raimangal in Block - Gosaba,P.S.- Sundarban Coastal, Dist-South 24 Paraganas under Joynagar Irrigation Division.
Road restoration work for laying 11 KV underground cable installation by open cut method at Southern Bypass service road of Kamalgazi flyover from WBSEDCL transformer to DAKSHINEE complex at Holding No- 2563, Mouza Ramchandrapur, under Bonhoogly gram
Rejuvenation of water body for free and smooth flow of strom water from Nungi Rail Cabin to Bata Bridge (Railway Nayanjuli) under Ward 28
Construction of ramp for washing and maintenance purpose of dumping ground vehicle in dumping ground under Ward 35
Renovation of Nursing Girls Hostel building at Bata More under Ward 29
Supply and delivery of LT Dist Box 3PH Con WH ST STRAP and BUCKLE,Preferably INDO / MACEDON / RMW.
Electrical-Mechnical repair and maintenance of Municipal Office, HAU, Compactor, Sub-Centre, Nursing, Hostel (Bata More), SWM Plant, Hot Mix Plant Plant, Utpal Dutta Mancha etc. under Maheshtala Municipality
Supply and delivery of piercing connector ABC 50-70 SQMM as per NIT
Supply and delivery of LT Dist kiosk for 100KVA TRNF.(SMC)Preferably SINTEX/RAYCHEM/TYCO
RE-EXCAVATION OF DEFUNCT MONIKHALI KHAL PARNASHREE KHAL BY MEANS OF PONTOON MOUNTED EXCAVATOR FROM PARNASHREE AIRPORT AREA (0.00) M TO NEW MONIKHALI KHAL (590.00) M, PARNASHREE PUMPING STATION DOWN STREAM (0.00) M TO DEFUNCT MONIKHALI KHAL (370.00)
Emergent restoration of Sundarban Embankment damaged due to Full moon kotal on and from 30.07.2026 to 03.08.2026 from Ch. 3.50 km. to Ch.3.73 Km. for a length of 230.00 metre facing L/B of River Chenargang at Mouza Patibunia under Mousuni
Part-I Sl No.-2 : EP Contactor Test Bench PLC & HMI Based 7" DC Amp
Emergent restoration of Sundarban Embankment damaged due to full moon kotal on and from 29.07.2026 to 03.08.2026 from Ch. 28.36 km. to Ch.28.56 Km. for a length of 200.00 metre facing R/B of river Chenargang at Mouza Mousuni under Mousuni
Emergent restoration of Sundarban embankment damaged due to Full Moon kotal on and from 30.07.2026 to 01 .08.2026 for a length of 24.00 M in between Ch 13.360 km and Ch. 13.384 km facing river L/B of Edwards Creek at Mouza Amrabati of Block- Namkha
MRL02-DAKANGARA MARKET TO PASCHIM PARA UNDER SAGAR BLOCK ( Length 0.560. Km )
MRL 02-Amirpur To Gabtala under Mathurapur- I Block ( Length 3.169 Km )
UPGRADATION OF ROAD (BRICK PAVED-SINGLE SOLLING) FROM H/O BALAI DAS(CHOTO) TOWARDS RIVER BOUNDARY AT DASPARA, MOUZA-KRISHNANAGAR BOOTH NO-74
MRL04-MANASHATALA MORE TO PURBA PARA UNDER SAGAR BLOCK ( Length 2.208 Km )
MRL03-SUMATINAGAR SAMSAN TO SUMATINAGAR POST OFFICE UNDER SAGAR BLOCK ( Length 1.462 Km )
MRL05-BAGBAZAR STAND TO RUDRANAGAR UNDER SAGAR BLOCK ( Length 1.116 Km )
MRL 03-BHAJNA SEKHPARA TO DAKSHIN GANGADHARPUR KALI MANDIR UNDER PATHARPRATIMA BLOCK ( Length 1.049 Km )
PROCUREMENT OF CEREMONIAL DRESS for EKta Diwas Parade -2026 of CIF WB
MRL 05-Achintya Nagar To Herambagopal under Patharpratima Block ( Length 2.866 Km )
MRL01- JANAR GHERI TO MADDYA PARA UNDER SAGAR BLOCK ( Length 1.163 Km )