Loading…
Loading…
6,655 results • Latest
Maintenance Repairs and execution of other emergent works of PHE Sub-Division Anantnag (Stage-3rd) Section Anantnag Town 2026-27.
Maintenance, Repairs and execution of other emergent works of PHE Sub-Division Anantnag (Stage-2nd) Section Achabal 2026-27.
Maintenance, Repairs and execution of other emergent works of PHE Sub-Division Anantnag (Stage-1st) Section Shangus 2026-27.
Reconstruction of Damaged foot Bridge for Gujjar Basti near Rafting point at Pahalgam
Construction of road from Bahie to Gebum
Online UPS (?10 KVA) With Battery Conforming To IS 16242 (Part 1) (Q2)
Construction of 0.30 Lac Gallon S.R at Panjthani with commissioning/connecting Upgradation of Existing Network with repairs to intake chamber and additional line from source to SR at Panjthani and installation of fire hydrants during annual Shri Am
Providing water supply to newly constructed yatra Niwas at Jablipora Bijbehara by way of exploration of sinking well, electro mechanical equipment
Improvements to damaged pipe network due to newly constructed YATRA NIWAS at Nunwan Base
Laying/Fitting of HDPE pipes to Wavebal, M.G Top, Poshpathri, Kelnard, Panjtarni, Sangam Top, sangam lower , Holy Cave, Kali Matta Track
Extension of RWM ,Installation of Fire Hydrants ,Commissiong /connecting of SR , upgradation of Existing pipe network by way of HDPE /GI Pipes at Sheshnag
Improvements to S.R. filtration plant at Ganeshbal protection of headworks during annual Shri Amarnath Ji
Installation of Fire hydrant and Chain link fencing around store shed at Chandanwari
Standard Nursery maintenance operations for Broad Leaved Plants in Awantipora and Kanjinag Nurseries under Scheme CAMPA NPV for the year 2026-27 Awantipora Forest Division
Maintenance of Poly Bags in Kanjinag Nursery CAMPA NPV Awantipora Forest Division
Maintenance of Poly Bags in Awantipora and Pampore Nurseries CAMPA NPV 2026-27 Forest Division Awantipora
Laying fitting of Supply Mains from RSFP to Nunwan Base Camp during annual Shri Amarnath Ji Yatra
Creation of essential facilities of shri Amar Nath ji yatra along Pahalgam axis enroute to holy cave.
Construction of Additional Staff Accommodation at Panjitarni under SANJY 2026-27 (UT CAPEX)
Construction of protection work with chain link fencing for RSFP FILTRACTION PLANT AT BAISARAN Pahalgam during annual Shri Amarnath Ji Yatra for the year 2026-27
Installation of new ROs with Mobilization and maintenance of old ROs and gensets and installation of same to different stations by way of engagement of labs and ponies yatra works
Tablet Computer (V2) (Q2)
MODERNIZATION OF BRIEFING ROOM/OPS ROOM
All in One PC (V2) (Q2), A4 and Legal Size Multifunction Printer (MFP) (Q2)
Goods Transport Service – Per KM Based Service - Dangerous/Hazardous; 9/15/18/24 Ton and 30 Ton CHTT Flat Bed; 9/15/18/24 Ton and 30 Ton CHTT Flat Bed
Split Air Conditioner, Floor Mount Type (V3) ISI Marked to IS 1391 (Part 2) (Q2) (3 (3 ))
Construction of Gravel Packed Production Tube Wells (02 Nos) at Air Force Station Awantipora, District Pulwama.
Construction of 1x18 Mtr Span Steel Girder Bridge over nallah Aripath at Kandir Kadal Chittirgul coming under allignment of Brakpora Kanganhal Chittirgul road
Electrification of different security camps/Bunkers Falling in the Jurisdiction of Sub Division Anantnag and sub-Division Dooru as per list of works (Enclosed) pertaining to ED Anantnag for SANJY 2026 (Revex-26).
Electrification of different securtiy camps/Bunkers from Wanpoh to receiving Station Hutmurrah as per list of works (Enclosed) pertaining to ED Anantnag for SANJY 2026.under capex budget.
STONE CRUSHER 20 TPH ABHISHEK
ACE EXC CUM LOADER AX 130
Improvement /Stabilisation of 33 kV line from Hutmurah to Recieving station Pahalgam including Branch cutting , restringing of loose conductor , tightening of jumpers, straightening of tilted poles etc for ensuring reliable power supply during SANJY-
Providing water tankers for Shri Amarnath Ji Yatra for security installations at different places enroute yatra and adjoining areas like K-Koot,joinery Mill,Gallender Pehre Mode,Lethpora Barsoo,Pampore Temple etc including POLfor the year 2026.
Providing drinking water supply facilities to Pilgrims /security personel and Providing and placing on terrace (at all floor levels) polyethylene water storage tank
Hiring of Earth Moving Equipments, Material Handling Equipments and Cranes (per Hour basis) - As Per Buyer's Requirement; Earth Moving Equipment; Tracked Hydraulic Excavators
Split Air Conditioner, Wall Mount Type (V3) ISI Marked to IS 1391 (Part 2) (Q2), Automatic Line Voltage Correctors (Step Type) For Domestic Use (Stabilizer) Conforming To IS 8448 (Q2) (3 (3 ))
Improvements to Waghama Gama Koul and Marhama Gama Koul ( Makad koul ) By way of Checking Overflows and increasing the carrying capacity
Providing of reliable power supply from Receiving Station Mirbazar and Qazigund during SANJAY 2026-27 to base camp FCI Mirbazar and Walnut factory Qazigund
Construction of Power transformer foundation at AIS Pahalgam for 4 MVA Power transformer.
Upgradation of Hari-Dadoo Road from main road Haripari Gam to Gujar Basti via Hapt Dankard including Amlar Hari Road.
Manpower Outsourcing Services - Minimum wage - Skilled; High School; Others
Goods Transport Service – Per MT per KM Based Service - Fish Feed, Household/Office; Tata Mobile; Heavy Duty
Vehicle Hiring Service - Per Vehicle-Day basis - SUV/MUV; 2022; Local; Plain; 40Kms x 5Hrs; Round Trip, Vehicle Hiring Service - Per Vehicle-Day basis - Premium SUV/MUV; 2022; Local; Plain; 80Kms x 10Hrs; Round Trip, Vehicle Hiring Service - Per Vehicle-Day basis - Premium SUV/MUV; 2022; Local; Plain; 120Kms x 12Hrs; Round Trip
Manpower Outsourcing Services - Minimum wage - Unskilled; Not Required; Others, Manpower Outsourcing Services - Minimum wage - Semi-skilled; High School; Others
Manpower Outsourcing Services - Minimum wage - Unskilled; Not Required; Others
PREPARATION OF DPR INCLUDING ASSISTING THE CLIENT IN OBTAINING CLEARANCES BESIDES PREPARATION OF TENDER DOCUMENT AND ALL ACTIVITIES TILL SIGNING A CONTRACT AGREEMENT WITH THE CONTRACT FOR IMPLEMENTATION OF 48 MW CHANDANWARI HEP.