Loading…
Loading…
6,984 results • Latest
Urgent Maintenance and Repair of Both Side Canal linning from ch. 41.00 to ch. 44.00 and Debris clearance from ch. 76.00 to ch. 90.00 including strengthening of canal bank from ch. 39.00 to ch. 44.00 of Dy- 8 of S.M.C. during Khariff Rabi Watering
IPM to canal bank in between Ch 10.00 to Ch 52.00 of Minor-A In between Ch 20.00 and Ch.60.00 of Minor B In between Ch 35.00 and Ch.75.00 of Minor C of Dy- 3 and In between Ch 1.00 and Ch. 23.00 of Water Course 2 of R.B.M.C for Kharif and Rabi
Estimate of floor cum wall mounting type LT Cubical M S Panel board of proposed Residential Regional Training Centers for training of trainers in connection with solid waste management Plastic Waste management at Bankura Municipality
Construction of Single Storied Anganwadi Centre at Harialgara Bagdipara Mouza- Harialgara, JL No-50, Plot No-1551, under Junbedia GP under Bankura-II Development Block under SDF fund.
Improvement of Bituminous Road from Bhadul Charbakpally Durga Mandir to Bhadul Nadighat of Bhadul, Shyamdaspur Mouza, JL No- 206, 207 undert Sabandha Gram Panchayat of Bankura-II Panchayat Samity, District-Bankura, Out of DMF (2025-26)
Internal Electrical Estimate of Proposed Basement Ground 1st Floor Second Floor for Setting up of residential Regional Training Centers within Bankura Municipality
Installation of 14nos Solar Street Light near UttarPara Submersible and (6)Six other places under PS-155 of Bikrampur GP. ( APAS/01/250/155/0001) under under Sarenga Block out of APAS fund of 2025-26
Installation of Solar light in various places in various mouzas under Booth No- 151, Khayerpahari ICDS Centre. ( APAS/01/250/151/0001) of Bikrampur GP under Sarenga Block out of APAS fund of 2025-26
Repairing of Road with morrum from Babulal Hansda Land to Lakshmikanta Hansda Land, PS - 154, BikrampurGP (Activity code -APAS/01/250/154/0003) under Sarenga Block out of APAS of 2025-2026
Repairing of Repairing of Road with morrum from Ruben Hansda to Dey Pukur, PS - 154, BikrampurGP (Activity code APAS/01/250/154/0005) under Sarenga block out of APAS of 2025-2026
SPARES FOR BOTTOM ASH HOPPER SLUICE GATE IN ASH HANDLING PLANT OF U# 1, 2, 3&4- COMPLETE SET OF PNEUMA
EXECUTION OF THE SCHEME SOCIAL FOREST (SONAJHURI-I) WITH FENCING Total Area 0.348 Ha (SAMAR KANTI MAJI) AT MOUZA-BENAGARI, JL NO- 32, PLOT NO- 2230,2231 ,GP-LATIABONI, GANGAJAGHATI,BANKURA
EXECUTION OF THE SCHEME SOCIAL FOREST (SONAJHURI-I) WITH FENCING Total Area 0.498 Ha (SHIBRAM MONDAL) AT MOUZA-BANKDAHA, JL NO- 27, PLOT NO- 3219,GP-NITYANANDAPUR, GANGAJAGHATI,BANKURA
EXECUTION OF THE SCHEME SOCIAL FOREST (SONAJHURI-I) WITH FENCING Total Area 0.72 Ha (DAMODAR LAYEK) AT MOUZA-BANKDAHA, JL NO- 27, PLOT NO- 1109/3367,1109/3368,GP-NITYANANDAPUR, GANGAJAGHATI,BANKURASARANGAPUR, JL NO- 26, PLOT NO- 10563, KH NO.- 6
Repairing of Khayerpahari Primary School Building at JL - 220 under PS - 150 of Bikrampur GP(Activitiy code-APAS/01/250/150/0002) under Sarenga Block out of 15th APAS of 2025-2026
Construction of Irrigation Field Channel-II, at Bagneja, Mouza- Bagneja, J.L. No.-287, on Plot No-117,118,338. G.P- Narrah, Block- Bankura-II ,Bnakura .under Narrah-Bikna Micro Watershed Committee PMKSY-2.0-BNK-02/2021-2022)
Construction of Check Dam-II at Bagneja, Mouza-Bagneja, J.L. No.-287, on Plot No-51,52. G.P-Narrah,,Block- Bankura-II ,Bnakura .under Narrah-Bikna Micro Watershed Committee PMKSY-2.0-BNK-02/2021-2022) NRM-2025-26
Construction of Check Dam-I at Brindabanpur, Mouza- Brindabanpur, J.L. No.-289, on Plot No-436. G.P-Narrah,,Block- Bankura-II ,Bnakura .under Narrah-Bikna Micro Watershed Committee PMKSY-2.0-BNK-02/2021-2022) NRM-2025-26
Construction of Check Dam-I at Uparbanda, Mouza- Uparbanda, J.L. No.-291, on Plot No-764. G.P-Narrah,,Block- Bankura-II ,Bnakura .under Narrah-Bikna Micro Watershed Committee PMKSY-2.0-BNK-02/2021-2022) NRM-2025-26
Construction of Check Dam-I at Mukundapur, Mouza- Mukundapur, J.L. No.-306, on Plot No-217,454,705,745. G.P- Kostia,,Block- Bankura-II ,Bnakura .under Kostia Micro Watershed Committee PMKSY-2.0-BNK-02/2021-2022) NRM-2025-26
Construction Massonary of Dug Well-I at Chiraboasta, Mouza- Chirabosta, J.L. no.-304, on Plot No-1228, G.P- Kostia,Block- Bankura-II ,Bnakura .under Kostia Micro Watershed Committee PMKSY-2.0-BNK-02/2021-2022) NRM-2024-25
Execution of The Scheme Social Forest (SONAJHURI-I) with Fencing at Sibarampur, JL No-283, Plot No-142, G.P- Narrah,Bankura-II, Bankura
Execution of Scheme Land Development Scheme at Telegara, Mouza-Telegara,JL No-286, Plot No.-344,346,G.P- Kostia,Block- Bankura-II, Bankura
Execution of Scheme Land Development Scheme at Mukundapur, Mouza- Mukundapur,JL No-306, Plot No.-1603,1605,1242,G.P- Kostia, Block- Bankura-II, Bankura
Construction of Irrigation Field Channel-I, at Kostia, Mouza- Kostia, J.L. No.-308, on Plot No-1153,1133,1113. G.P- Kostia, Block- Bankura-II ,Bnakura .under Kostia Micro Watershed Committee PMKSY-2.0-BNK-02/2021-2022)
Excavation of WHS-I, at Mouza-Sirsara, J.L. no.-284, on Plot No-128, G.P- Kostia, Block- Bankura-II ,Bnakura .under Kostia Micro Watershed Committee PMKSY-(WDC 2.0-BNK/02/2021-2022) NRM 2025-26
Excavation of WHS-II, at Mouza-Sirsara, J.L. no.-284, on Plot No-16,17,18,142. G.P- Kostia, Block- Bankura-II ,Bnakura .under Kostia Micro Watershed Committee PMKSY-(WDC 2.0-BNK/02/2021-2022) NRM 2025-26
Excavation of WHS-I, at Mouza-Chhirabosta, J.L. no.-304, on Plot No-04. G.P- Kostia, Block- Bankura-II ,Bnakura .under Kostia Micro Watershed Committee PMKSY-(WDC 2.0-BNK/02/2021-2022) NRM 2025-26
Excavation of WHS-II, at Mouza-Chhirabosta, J.L. no.-304, on Plot No-112. G.P- Kostia, Block- Bankura-II ,Bnakura .under Kostia Micro Watershed Committee PMKSY-(WDC 2.0-BNK/02/2021-2022) NRM 2025-26
Excavation of WHS-III, at Mouza-Chhirabosta, J.L. no.-304, on Plot No-368. G.P- Kostia, Block- Bankura-II ,Bnakura .under Kostia Micro Watershed Committee PMKSY-(WDC 2.0-BNK/02/2021-2022) NRM 2025-26
Excavation of WHS-I, at Mouza-Mukundapur, J.L. no.-306, on Plot No-1096,1099,1120. G.P- Kostia, Block- Bankura-II ,Bnakura .under Kostia Micro Watershed Committee PMKSY-(WDC 2.0-BNK/02/2021-2022) NRM 2025-26
Excavation of WHS-I, at Mouza-Uparbanda, J.L. no.-261, on Plot No-481. G.P-Narrah, Block- Bankura-II ,Bnakura .under Narrah-Bikna Micro Watershed Committee PMKSY-(WDC 2.0-BNK/02/2021-2022) NRM 2025-26
Excavation of WHS-I, at Mouza-Uparbanda, J.L. no.-261, on Plot No-547. G.P-Narrah, Block- Bankura-II ,Bnakura .under Narrah-Bikna Micro Watershed Committee PMKSY-(WDC 2.0-BNK/02/2021-2022) NRM 2025-26
Providing and installation of Neutralization System, Flowmeter, Motorized Sulice valve with related allied works at Lachiapur (Zone D) under Khatra Hirbandh Ranibandh Water Supply Scheme under BMD PHE Dte. Dist Bankura.
Repair and Renovation with Electrical Installation and other allied works at First floor of OPD Building under BSMC and H, Bankura.
Repair Work If ICDS Centre at Chatri
Providing and installation of Neutralization System, Flowmeter, Motorized Sulice valve with related allied works at Kadra (Zone G) under Khatra Hirbandh Ranibandh Water Supply Scheme under BMD PHE Dte. Dist Bankura.
Construction of Shade of Community Centre at ChatriNamapara
Installation of Solar Street Light 1 No. at ManharaAdibasi Para
Installation of Solar Street Light 3 Nos. from Majhipara to Namopara
Installation of Solar Street Light 3 Nos. from Majpara To Uparpara
Providing and installation of Neutralization System, Flowmeter, Motorized Sulice valve with related allied works at Biradihi (Zone C ) under Khatra Hirbandh Ranibandh Water Supply Scheme under BMD PHE Dte. Dist Bankura.
Construction of 2 Nos. of Toilet at Chatri Nimna Buniyadi Vidyalaya
Repair work of Manhara 236 No. ICDS Centre Kitchen Shade and A Small Gate Installation
Providing and installation of Neutralization System, Flowmeter, Motorized Sulice valve with related allied works at Kadra (Zone G) under Khatra Hirbandh Ranibandh Water Supply Scheme under BMD PHE Dte. Dist Bankura
Installation of Solar Street Light 4 Nos. at Lachhipur village
Installation of Solar Street Light at Manhara Village 4 Nos.
Providing and installation of Neutralization System at Harialgara (Zone-O) OHR under Bankura-I.II and Barjora Water Supply Scheme under BMD PHE Dte. Dist Bankura.
Street Light from BeraKalapathar to Kalyansayer 16 Nos.