Loading…
Loading…
1,159 results • Latest
ZPBEED/WD2/DPDC/157/2025-26
ZPBEED/WD2/DPDC/134/2025-26
THREE WAY COCK BALL
Muffle Furnace
chain and sprocket kit
High End Laptop - Notebook (Q2), Computer Printer (V2) (Q2), Line Interactive UPS with AVR (V2) (Q2), High End Desktop Computer (Q2), Scanner (V3) (Q2), Multifunction Printer (Print, Scan, Copy) (Q2), Multimedia Projector (MMP) (Q2), Smartphone (V2) (Q2), Tablet Computer (V2) (Q2), Office Suite Software (V3) (Q2) (3 (3 ))
ZPBEED/WD2/DPDC/155/2025-26
ZPBEED/WD2/DPDC/163/2025-26
Decoration to Smashanbhumi At Dawlawadgaon Tal Ashti Dist Beed
ZPBEED/WD2/2515-2557/162/25-26
ZPBEED/WD2/DPDC/124/2025-26
Non - Contact Voltage Tester (Q3), Non-Contact High Voltage Detector (Q3), Digital Earth Resistance Meter (Q3), Digital Multimeter (Q3), Industrial Safety Belts and Harnesses as per IS 3521 (Q3), true rms clamp meter (Q3) MSE Exemption for Years Of Experience Yes | Complete Startup Exemption for Years Of Experience Yes | Complete Document required from seller Experience Criteria, Certificate (Requested in ATC), OEM Authorization Certificate, Additional Doc 1 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 3 Bid Number : GEM/2025/B/6865576 Dated : 07-11-2025 Bid Document 1/16, -- Number of days for which Bid would be auto -- extended 7 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Two Packet Bid Primary product category Digital Earth Resistance Meter Time allowed for Technical Clarifications during technical evaluation 7 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Estimated Bid Value 747851.95 Evaluation Method Item wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Advisory Bank State Bank of India Schedule 1 EMD Amount (In INR) 6170 Schedule 2 EMD Amount (In INR) 1945 Schedule 3 EMD Amount (In INR) 3288 Schedule 4 EMD Amount (In INR) 1036 Schedule 5 EMD Amount (In INR) 758 Schedule 6 EMD Amount (In INR) 1760 ePBG Detail Advisory Bank State Bank of India (%) ePBG Percentage(%) 5.00 ( ) Duration of ePBG required (Months). 2 2/16 (a). EMD EXEMPTION: The bidder seeking EMD exemption, must submit the valid supporting document for the relevant category as per GeM GTC with the bid. Under MSE category, only manufacturers for goods and Service Providers for Services are eligible for exemption from EMD. Traders are excluded from the purview of this Policy. (b). The EMD Amount will be applicable for each schedule/group selected during Bid creation. (c)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. Beneficiary : AREA GENERAL MANAGER SOHAGPUR AREA, South Eastern Coalfields Limited, STATE BANK OF INDIA, DHANPURI BRANCH, BRANCH CODE 4617, BANK IFSC SBIN0004617, BANK ACCOUNT NUMBER 10964816155 SBI DHANPURI - 3 DISTRICT SHAHDOL (Secl, Sohagpur Area) (Secl, Sohagpur Area)
ZPBEED/WD2/2515-2557/158/25-26
ZPBEED/WD2/DPDC/26/2025-26
CONST OF CEMENT CONCRET ROAD TO INTERNAL VILLAGE AT DHAMANGAON TAL ASHTI DIST BEED
ZPBeed/WD2/2225-101/180/25-26
ZPBEED/WD2/DPDC/185/2025-26
HIGH PRESSURE HOSE ASSEMBLY
GASKET FOR WATER PUMP
ZPBEED/WD2/DPDC/181/2025-26
A SET OF SPARES
ZPBEED/WD2/2225-101/167/25-26
ZPBEED/WD2/2515-2566/160/25-26
Constg. Of Cement Concret Road From Sunilnath House At Kada Tal Ashti Dist Beed
Split Air Conditioner Including Green AC, Wall Mount Type (V2) (Q2), Split Air Conditioner (Floor Type), as per IS: 1391 (part 2) (Q2) MSE Relaxation for Years Of Experience Yes | Complete Startup Relaxation for Years Of Experience Yes | Complete Document required from seller Certificate (Requested in ATC), OEM Authorization Certificate, Additional Doc 1 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 3, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6908705 Dated : 25-12-2025 Bid Document 1/29 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Two Packet Bid Primary product category Split Air Conditioner Including Green AC, Wall Mount Type (V2) Time allowed for Technical Clarifications during technical evaluation 7 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Estimated Bid Value 2506852 Evaluation Method Item wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Advisory Bank ICICI Schedule 1 EMD Amount (In INR) 36150 Schedule 2 EMD Amount (In INR) 7674 Schedule 3 EMD Amount (In INR) 6312 ePBG Detail Advisory Bank State Bank of India (%) ePBG Percentage(%) 5.00 ( ) Duration of ePBG required (Months). 4 (a). EMD EXEMPTION: The bidder seeking EMD exemption, must submit the valid supporting document for the relevant category as per GeM GTC with the bid. Under MSE category, only manufacturers for goods and Service Providers for Services are eligible for exemption from EMD. Traders are excluded from the purview of this Policy. 2/29 (b). The EMD Amount will be applicable for each schedule/group selected during Bid creation. (c)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. Beneficiary : Mahanadi Coalfields Limited, Lingaraj Area OFFICE OF THE GENERAL MANAGER, MAHANADI COALFIELDS LIMITED, LINGARAJ AREA, PO-DEULBARA COLLIERY, TACLHER, DIST-ANGUL, ODISHA-759102 (Staff Officer Mm, Lingaraj Area) UIN Number NCTGC2415P
DEVELOPMENT OF MARUTI MANDIR NEAR PLAYGROUND, AT WARD-12, UNDER NAGAR PANCHAYAT ASHTI, TQ.ASHTI, DIST BEED.
CONSTRUCTION OF KRIDA HALL AT WARD NO-17, UNDER TO NAGAR PANCHAYAT ASHTI, TQ.ASHTI, DIST.BEED.
DEVELOPMENT OF SAMSHANBHUMI PREMISES AND ANNABHAU SATTHE GARDEN, WARD NO-16, BELONGS TO NAGAR PANCHAYAT ASHTI, DIST.BEED.
IMPROVEMENT TO BAJARTAL (BALANCE WORK), AT WARD-15, UNDER NAGAR PANCHAYAT ASHTI, TQ.ASHTI. DIST.BEED.
CONSTRUCTION OF C.D. WORK ON GAWARE WASTI ROAD , WARD NO -13, UNDER NAGAR PANCHAYATASHTI. TQ.ASHTI. DIST.BEED
Aftercooler assembly
ZPBEED/WD2/DPDC/47/2025-26
ZPBEED/WD2/DPDC/49/2025-26
ZPBEED/WD2/DPDC/52/2025-26
ZPBEED/WD2/DPDC/65/2025-26
ZPBEED/WD2/DPDC/115/2025-26
ZPBEED/WD2/DPDC/112/2025-26
ZPBEED/WD2/DPDC/150/2025-26
ZPBEED/WD2/DPDC/67/2025-26
ZPBeed/WD2/DPDC/053/2025-26
Multifunction Machine MFM (V2) (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Experience Criteria, Additional Doc 1 (Requested in ATC), Additional Doc 2 (Requested in ATC), Additional Doc 3 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No Minimum number of bids required to disable automatic bid extension 3, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6926835 Dated : 24-11-2025 Bid Document 1/11 Number of Auto Extension count 3 Bid to RA enabled No Type of Bid Two Packet Bid Primary product category Multifunction Machine MFM (V2) Time allowed for Technical Clarifications during technical evaluation 4 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Item wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Advisory Bank State Bank of India (%) ePBG Percentage(%) 5.00 ( ) Duration of ePBG required (Months). 41 (a)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. Beneficiary : DGM-MT IOCL- Panipat Refinery, INDIAN OIL CORPORATION LIMITED, IOCL- Panipat Refinery, Ministry of Petroleum and Natural Gas (Dgm Materials)
Brake Caliper unit leverage ratio 2.48 for Power car without brake cylinder
BEATIFICATION OF SMASHANBHUMI PARISAR AT VILLAGE KOTARBAN TQ WADWANI DIST BEED
Providing Beutification to Samshanbhumi At Andhalewadi Tq Kaij Dist Beed
All in One PC (V2) (Q2), Entry and Mid Level Laptop - Notebook (Q2), Entry and Mid Level Desktop Computer (Q2), Line Interactive UPS with AVR (V2) (Q2), Multifunction Printer (Print, Scan, Copy) (Q2) (3 (3 ))
CONSTRUCTION OF ANGANWADI BUILDING AT IMAMPUR Tq Beed Dist Beed
GASKET WATER PUMP