Loading…
Loading…
1,254 results • Latest
Segriggation work of wet and dry waste generated in the boundary area of Nagar Palika Parishad Sarni on trenching ground and work of making organic compost from wet waste and operation of MRF center and sale of soild waste material .(2nd Call)
INJ. TETANUS TOXID 0.5ML, TAB. FURAZOLADINE 100MG, TAB. HYDROXY URIA 250MG, TAB. AMLODIPIN 10MG, TAB. METFORMIN 1000MG, TAB. SULFAMETHAXAZOLE 200MG+ TRIMETHOPRIM 40MG, TAB. ATENOLOL 100MG, INJ RANITIDINE 2ML, TAB. RANITIDINE 150MG
PINNACLE STUDIO 20 ULTIMATE WINDOW COMPATIBILITY
Providing of JCB Machine For Rent (Per Hour) For the Year of 2026-27 with GST
Supply of Water supply maintenance Item for Financial Year 2026-27
Inviting the rates about taking out defective motor Pump from Bore well and re-install again in bore well F.Y.2026-27
Supply of Open Well Motor and Submersible Motor Pump at The Office of Municipal Council Shahpur in F.Y.2026-27
Motor Pump Rewinding and Repairing Work For Financial Year 2026-27
Enquiry for Supply of BI Metallic CT Clamp , TTB and PI KIT OandM Betul Circle
Work of Complete overhauling of Ring Granulators and Refurbishment of Bucket with Supply of New Bucket Pin and Bucket Teeth for Stacker Reclaimer of CHPIV, STPS, Sarni
Manual dismantling, along with manual transportation upto track end and shorten-ing of 1000mm belt structure dismentling with drive head complete with electricals and dismantling of pipe line in CM Panel W7Xcut and CM panel W7 of Bagdona seam at Tawa
Loading, transportation, unloading and installation of 01 no. of 55KW and 01 no. 22 kw 800mm belt conveyor complete with electrical accessories at 37LN/0D-1DS and 4D/37LN along with 420m belt structure and 840m PVC belting in LWS of Tawa-II Mine
Supply, erection of materials for i) Underground railway crossing by Push through method for 2 sets of 1N1 33KV XLPE cable 3 core, 300 sq mm ii) 2 sets of 33 KV D.P. Structure on 13 Mtr Long H-Beam for double circuit single stringing, Near Sarni Powe
Supply installation of musical fountain
Construction of a passenger waiting shed at the sub-jail under the MLA Local Area Development Fund
Construction of a drainage channel in Tapti Ward, from Pradeep Raghuvanshi house to Mukesh Paunikar house.
Increase in number of Empanelled Contractors for Restoration of Distribution Infrastructure During Emergencies in the Circle wise tender.
Providing services of 06 Nos. Data Entry Operator and 06 Nos. peons for O/o Addl. CE(Construction) and O/o SE(Civil-Construction) at STPS, Sarni
Procurement of Electric Ceiling Fan 1200 mm sweep (100 percent Copper Motor) Complete with down Rod, Canopy, Blades STPS MPPGCL Sarni
Construction of boundary wall at Tikari campus Betul 205 mtr
Overhauling work of various 6.6KV HT motors, 415V L.T. motors during AOH,COH,shutdown of Unit No.10 or 11, or as per available opportunity for motors and common auxiliaries of PH 4, STPS, Sarni.
Complete rewiring including supply of required material of existing office, sheds of PH 2 inside PH premises for utilizing office setup for 1x660 MW supercritical extension unit No. 12 at STPS, Sarni.
Various Work of ESP, 400 KV Switchyard and Bus Duct during AOH Short Shutdown of Unit No 10, STPS, Sarni.
Assistance in attending day to day lighting defects in MPPGCL quarters and public utility buildings in STPS Sarni.
Testing of various Numerical and Electromagnetic relays installed in Unit 10 or 11 PH 4 and 400Kv Sarni Ashta 1 or 2 feeders STPS Sarni during AOH or Short Shutdown.
Complete rewiring of The New Welfare Club building including supply of required material, STPS, MPPGCL Sarni.
The work of Annual Maintenance Contract for Honeywell PLC ML200R system and Networking of BOP of 2x250MW STPS Sarni.
Construction of boundary wall at New Multai Division office building 150Mtr
Group No. 1-R.C.C.Drain in Ward No 03, 14, 15 Nagar Parishad Shahpur
Group No. 2 R.C.C. Drain in Ward No. 03, 05. 08 and 10 Nagar Parishad Shahpur
Group No. 3 Tubewell Excavation Work in Ward No. 06 and 2 Nos. R.C.C.Drain in Ward No. 06 Nagar Parishad Shahpur
Const.of Entrance Gate Near Pradeep Rathore House in ward no 12 Shahpur
Procurement of LT Current Transformers for415V Switchyard of PH-4, STPS, 250 MW Unit No. 10 and 11
All in One PC (V2) (Q2), Multifunction Printer (Print, Scan, Copy) (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
Work of testing of Boiler tube failure and deposit analysis of 2x250 Unit no 10 and 11 STPS, Sarni for 2 years
REJUVENATION OF RIVERUNDER AMRUT 2.0 SCHEME AT SHAHPUR
Shri Mansukhdas Baba mela me tent baithak sound decoration smrati chinh bhojan snacks tea coffee etc The office of Municipal Council Shahpur Distt. Betul MP (Please Rate Coated all Item with GST)
Supply of Electric item at electrical store Npp Amla Financial year 2026-27.
Construction of 2 lane with paved shoulder from Hiwarkhedi-Roshni NH-347B from km 0.000-km 90.010 and 2-4 Lane from km 114.000 near Ashapur Village to km 149.000 near Rudhy village of Betul-Khandwa corridor 125.010 km in MP on HAM under NHO
Purchase/installation of complete furniture and conference sound system and accessories for conference hall by the body (as per attached list)
03RD TENDER SANITATION AND MISCELLANEOUS ITEMS
Construction of 34 Nos. Isolation Stopping in MD-1 Dist. LWS at Chhatarpur Mine No. 1, Pathakhera Area, WCL
Construction of 200MT Godown with Input Shop and office block for PACS Dhanora Distt.-Betul Under RKVY Scheme(2nd call)
Construction of Shivpur Talkesri to Baharpur road. PAC RS. 500.42 LACS Fourth call on on Road and Bridge S.O.R. wef 11-04-25 Work Period 240 days i/c rainy season
Procurement of Spares for various ROTORK make electrical actuators for STPS ,Sarni
Procurement of Various spares for Elecon Make Gear Boxes for 36 inch Gravimetric Raw Coal Feeder of Unit No. 10 and 11 STPS, Sarni
Procurement of Complete Dome Valve Assembly and Blow Valves for Mill Reject Handling System of Unit No. 10 and 11 STPS, Sarni
HYDROSTATIC PRESSURE TESTING OF CYLINDER