Loading…
Loading…
878 results • Recent activity
050 16MEG23
Shifting of tubular pole opposite station near transporting road due to deteriotion of pole by prolonged heating caused by accumulated coal in surrounding areas additionally shirting of poles due to close proximity to the overhead conductor for
Making arrangement for 415-Volt LT power distribution through busbar panel in various load centers like 5oo kva transformer installed in avantika Campus-Kundi the DG set installed at weighbridge number 13 the generator at weighbridge number 15 for p
Provision of 25 No.s Additional lightning arrestor by Fabrication of 18 mtr height pole and erection of lightning arrestor on it with Sky netting and suitable earthing for the WBs and 02 No.s Checkpost under Ashok OCP, PPR Area
Repairing maintenance of 4 nos. (1500 KVA, 750KVA, 250KVA and 100KVA Transformer and 01no. 37 KW Motor installed at different places under GM unit, Piparwar Area.
Replacement of the 02 Nos. Rail sensor of the IMRWB (100MT) RCM-1 installed at RCM Siding under Ashok OCP, Piparwar Area.(Compatible with existing Pragati Make In-Motion Rail WB, 100T capacity)