Repairing / Changing of feed chute, Sieve bend holding Structure and Sieve bend discharge chute of washed coal screen unit 607-1 to 607-4 of 18M floor of Washery Building of Moonidih Coal Washery.
Repairing / Replacement of water spray system and their pipelines at different coal transfer points of raw coal section of belt conveyor unit 401,402,403-A and 403-B at Moonidih Coal Washery.
Structural Repairing / Re-strengthening and mechanical overhauling of discharge chute, Gear box , base frame and drive assembly with coupling replacement for conveyor unit 501-B at Moonidih Coal Washery.
Repairing / Re-strengthening of 2 Nos. Sala pumps with structural base Restoration to mitigate waterlogging and ensure reliable dewatering operation near Silo no.3 at Moonidih Coal Washery
Structural repairing / restrengthening and functional restoration of discharge chute and supporting frame work of unit 704 belt conveyor at Moonidih Coal Washery.
Repairing/ Restrengthening of idler frame structures and Return Roller assemblies for belt conveyor 801-A, 801-B, 502 and 504 at Moonidih Coal Washery.
Structural repairing / re-strengthening of conveyor support frame work of unit C-1, C-2 and 704 at Moonidih Coal Washery.
Mechanical Repairing/ Re-strengthening of snub and tail drums of conveyor unit 501-B and snub and take-up drums of Conveyor unit 701 at Moonidih Coal Washery.
Mechanical repairing / restrengthening of tripper, snub and take up drums of conveyor unit 702 at Moonidih Coal Washery.
Mechanical Repairing / Re-strengthening of Snub and Tail drums of Conveyor unit 801-A and Take-up drum of Conveyor unit C-2 at Moonidih Coal Washery.
Repairing/ Changing of damaged slurry flow pipeline connecting pond no. 6 to pond no. 7 at Moonidih Coal Washery.
Repairing / Relaying of damaged slurry flow pipeline between pond no. 3 and 4 at Moonidih Coal Washery.
Repairing / Denting and Painting of Locomotive No.209 and new Locomotive Sl. No. 60537 Cabin and body at Moonidih Coal Washery.
Repair and Replacement of Carrying idler frames and idler sets, including return rollers for unit 701 and 702 at loading section of Moonidih Coal Washery
Repairing/ Replacement of water spray system and their pipelines at different coal transfer points of belt conveyor units C-1 and C-2 and also under loading section including units 704, 901 and 903 at Moonidih Coal Washery.
Repair and Replacement of Carrying idler frames and idler sets, including return rollers for unit 704, 901 and 903 at loading section of Moonidih Coal Washery
Online UPS (?10 KVA) With Battery Conforming To IS 16242 (Part 1) (Q2) (3 (3 ))
Resin Capsule (Q3)
Distribution Transformer, 3 Phase, 11 kV, >200 KVA upto and Including 2500 KVA ISI Marked To IS 1180 (Part 1) (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
Monthly Basis Cab & Taxi Hiring Services - SUV; 1500 km x 720 hours; Local 24*7, Monthly Basis Cab & Taxi Hiring Services - SUV; 2400 km x 720 hours; Local 24*7, Monthly Basis Cab & Taxi Hiring Services - MUV; 3000 km x 720 hours; Local 24*7, Monthly Basis Cab & Taxi Hiring Services - MUV; 1500 km x 720 hours; Local 24*7
RING PISTON, LUBRICATOR, FITTING GREASE, CAP RH, COVER REAR LH, SHAFT, SCREW, COVER, COUPLING, HOSE, HOSE ASSY, O-RING, VALVE ASSY, EXTENSION HOSE ASSY, BRAKE LINER, FAN BELT, U JOINT ASSLY, HOSE ASSLY, RACE SPLIT OUTER, SLING WEB, 4M, 10TON, P OLYSTR, EYE, 72500 KIT, TAPE ADHSV, 25MM, BLK
Re-fabrication and Installation of Cable tray of unit 701, 901 and 903 conveyor galleries (150 Mtr. Length) of Moonidih Coal Washery.
Dismantling and Changing of cyclone body and its CI fed pipe of unit 605-1 to 605-4 (Four Nos.) along with Strengthening of its base structure and refitting of all its accessories at 21M floor at washery Building of Moonidih Coal Washery.
Providing and laying P.C.C between shed no. 01 and shed no. 02 and extension of drain under MRW.
Repairing / Strengthening of fences, Re-laying of 2 inch dia G.I. pipe and maintenance of Gardens of SNEHA SMRITI UPWAN near PO office and site office at Moonidih Coal Washery.
Repairing / Strengthening of damaged structural members (including platform, fences, hand rail) of junction house adjacent to washery building comprising of unit 701 and 801-A conveyor and Repairing of access platform on both side of U-702 above silo
Repairing of brake and clutch assembly of BEML make Dozer model BD-155 at H.V.Section of Moonidih Coal Washery.
Repairing/ Overhauling of Engine of TATA Hyva Tipper no. JH10AE-0601 of Moonidih Coal Washery.
Repairing of discharge chute of conveyor belt unit 601 of Washery Building at Moonidih Coal Washery.
Repairing / Strengthening of platform, fences and handrail and its support above overhead railway line crossing at loading point for safety point of view of Moonidih Coal Washery.
Re-fabrication and Installation of cable tray of Unit 801-A Conveyor gallery of Moonidih Coal Washery.
Repairing / Strengthening of delivery pipelines, base frames of sump pumps and motors along with replacement of 2 nos. sump pumps and their motor under the tunnel of unit 501-B at Moonidih Coal Washery.
PROCUREMENT OF 3 PRINTER FOR PHH
MIXER GRINDER 1000 WATTS WITH 3 STEEL JAR CAPACITY.
Fabrication and Installation of cable tray unit C-2 conveyor belt (50 Meter) and cable tray B/W Thickener 1 and 2 (50 Meter) of Moonidih Coal Washery.
Repairing/ Denting and painting of Locomotive No.266 Cabin, Engine assembly cover of Moonidih Coal Washery.
Repair and Maintenance of Drain and Septic Tank at Gealgora Under E.J. Area
Repairing of biecco lowrie 11KV OCB, 400 amp for controlling 400KVA 11KV/440V lighting transformer feeding power to Mukhiya Dhowra of Ena Substation
Re-fabrication and Installation of Cable tray of Unit 501-B conveyor gallery (130 Meter Length) at Moonidih Coal Washery.
Replacement of 2 Nos. of snub drum assembly after dismantling of existing worn-out drum for unit 201 belt conveyor and refitting of all its accessories at Moonidih Coal Washery.
Repairing/ Strengthening of Bypass chute for unit 901 after dismantling of existing worn-out chute with its Side skirts, shaft, rack and pinion of Gate at Moonidih Coal Washery.
Heightening of floor at Benidih substation near Benidih feeder breaker under AMP Colliery under Barora Area
Re-fabrication and Installation of Cable tray of unit 702 conveyor gallery (120 Meter Length) at Moonidih Coal Washery.
Re-fabrication and Installation of Cable tray at 21 Mtr. Floor of Washery Building (180 Mtr. Length) at Moonidih Coal Washery.
Repairing/ Strengthening of approaching Stair case and its support for stairs going up to unit 502, C-1 and C-2 conveyor belt at Moonidih Coal Washery.
Gasket And Packings-Gland Packings Asbestos - IS 4687 (Q3)
Repairing of drinking water pipe line in different colonies under Barora Area
Fabrication and Installation of new slider frame after dismantling and removal of existing worn-out slider of slidding pulley of unit C-1 and C-2 belt conveyor at Moonidih Coal Washery.
Repairing/ Strengthening of Take-up structure, side stairs and bracing of unit 704 belt conveyor of Moonidih Coal Washery.