Loading…
Loading…
1,468 live1,041 closing this weekmost from Directorate of Local Bodies UP and Northern Railway
1,468 results • Latest
In Ward 18, Rajapur, work of drain and interlocking tiles from Nandu house to Neeraj house, from Kiran house to Ravindra Pal house, Devendra street, Vipin Dairy street, from Shilu house to Viru house.Suryakant Tripathi Nirala Marg near Lane No. 3 Cen
Drain work from Kapil house to Pushpendra house in Ward 16, Aastha Enclave.
Construction work of damaged wall on Semal Road side in Ward 100 Shipra Suncity Phase 2.
Work of laying interlocking tiles on the right side track of Karmchari Path and on the side track of R.N. Rai Marg near Gate No. 4 in Ward 100 Shipra Suncity.
Work of laying interlocking tiles on the side tracks on both sides of Suryakant Tripathi Nirala Marg near Lane No. 3 Central Park in Ward 100 Shipra Suncity.
In Ward 98 Policy Section 3, work of road improvement and laying of tiles on side tracks by Dans from Plot No. 185 to 201 and Plot No. 154 to 143, up to the road behind Central Park.
Road improvement work by CC from Rangoli Banquet to Brajvihar Flyover Bridge in Ward-97 Chandranagar.
In Ward 98 Policy Section 3, work of road improvement and laying of tiles on side tracks of plot no. 129 to 119 and plot no. 90 to 100 and auxiliary road by Dans.
In Ward 98 Policy Section 3, work of road improvement and laying of tiles on the side track by Dans in plot no. 672 to 661 and plot no. 445 to 461 and 184 to 176, the road on the left side of Central Park and from 301 to 312.
Interlocking tiles and drain repair work on both sides of the side pavement of the road from RP Jewels to house no. C/205-B (yellow gate) on Dr. Bali Marg in City Zone Ward-08, Nehru Nagar II.
Interlocking tiles and drain repair work on both sides of the side track of the road from C/116 to C/84 in City Zone Ward-08, Nehru Nagar II C Block.
Construction work of CC road from house no. A-27 to Deep Memorial School and interlocking tiles on damaged site plank in Ward-97 Ramprastha A Block.
Road improvement by CC from house no. B-06 to B-02 in Ward-97 Chandranagar.
Interlocking tiles and drain repair work on both sides of the side track of the road from Urvashi Saree Centre to Siddharth Homes via C/70 in City Zone Ward-08, Nehru Nagar II C Block.
Road improvement work by CC from Krishna Medicos to The Grand India in Ward-97 Chandranagar.
Road improvement work by CC from The Grand India to Rangoli Banquet in Ward-97 Chandranagar.
Road repair work by CC on the damaged road from A-78 to A-76 in Ward 94 Suryanagar Rampuri.
Road improvement work by CC from house no. B-2 to Krishna Medicos in Ward-97 Chandranagar.
City Zone Ward-08, Maliwada Chowk Qureshi Market Kalpana Garments to Gandharva Music College (Basat Road) road improvement work by Danes.
In Ward-97 Ramprastha A Block, from house no. A-59 to A-100 and on the road parallel to C-20, improvement work by laying interlocking tiles on the CC road and damaged site plank.
In Ward-94, in Rampuri, from Crystal Glass to White Hot Pizza and from A-01 to A-09, the damaged road has been repaired by Dans and the side panels have been repaired by interlocking tiles.
In Ward-74 Sa-17 B, construction work of damaged wall up to house no. 101-122 in front of house no. 17B 201-222 and 17B in front of house no. 501-522.
In Ward 77 Sector 3 Vaishali, repair work of road from H.No. 416 to 444 and H.No. 445 to 495 and H.No. 497 to 545 and H.No. 546 to 598 by old interlocking tiles.
Road improvement work by CC from house no. C-20 to C-63 in Ward-97 Ramprastha.
In Ward-94, in Rampuri, from house no. A-16 to A-21B and in Alaknanda D Block, improvement work by interlocking tiles and road improvement work by dance.
In Ward 74 Sa-13, the damaged road from Pandit Plaza to Maharaja School was repaired by Dans and interlocking tiles were laid on the side.
Improvement work by Dans and laying of perforated tiles on the side track from M.No. 410 to M.No. 426 in Ward 81 Shakti Khand 04 Gali No. 6.
In Ward 77 Sector 3 Vaishali, repair work of road by old interlocking tiles on M.No. 599 to 648 and Pramod Jewellery road and water pump road.
Work of laying tiles on the side tracks and from G5 to G10 and MNo. 1 to 18 in Ward 79 Abhay Khand 3 Divine Park C Block and from A101 to E102 and B102 to G101 in Sahayak Gali and Milan Vihar.
Work of road improvement and laying of tiles on side tracks by Dans from plot no. 304 to 288 in Ward 79 Gyan Khand 1 Green Street Society
Work of interlocking tiles from C-78 to C-85 and C-187 to C-195 and C-145 to C-134 E in Ward-94 Suryanagar C Block.
In Ward 81 Shakti Khand 03, improvement work by CC from M.No. 50 to M.No. 69 and work of laying perforated tiles on the side track.
In Ward 77 Vaishali Sector 4, work of laying tiles on the side track from M.No. 101 to S.4 Vaishali Market Gate M.No. 353 by dance.
Work of road improvement and laying of tiles on side tracks by Dans from plot no. 135 to 151 in Ward 79 Gyan Khand 1 Street Society.
Construction of interlocking tiles and drain on both sides of the side track of the road from RDC flyover (Khurana Mortus) to PWD Quarters in City Zone Ward-08, Maliwada.
Improvement work by Danes from C-223 to C-123 D and house no. 123D to 123G in C Block, Surya Nagar, Ward-94.
In Ward 81 Shakti Khand 03, improvement work by CC from Man No. 232 to 216, Man No. 84 to 79, Man No. 102 to 96, 133 to 146 and 163 to 188.
Road improvement and laying of tiles on side tracks by Dans from 1A to 7A and 7A to 12A in Ward 79 Abhay Khand 3 Takshashila and from Plot No. 21 to Plot No. 40 in Abhay Khand 1.
Construction of RCC drain behind Jain temple and on the road leading to Chaya Public School in Ward-77 Vaishali Sa-03.
Repair work of damaged road from house no. A-64 to A-41 in Ward-94 Rampuri by Danes.
Work of improving the side track on the road in front of Alaknanda in Ward 77 Vaishali Sector 4.
Construction of RCC drain and improvement of side track from Yashoda Marg God Heights to in front of Krishna Bhawan in Ward 77 Vaishali Sector 4.
In Ward 81 Shakti Khand 03, improvement work by CC from Healing Tree Hospital to M.No. 232 and work of laying perforated tiles on the side track.
Repair work of damaged road from house no. C-16 to C-13 and A-221 to A-81 in A Block in Ward-94 Suryanagar by Danes.
Repair work of damaged road from house no. 13/157 to 490, house no. 13/673 to 672 and house no. 687 to 686 in ward 74 Sa-13 by Dans.
Work of construction of drain and interlocking tiles from Dilip to Amit house in Ward-06, Nandgram Deendayalpuri.
Repair work of damaged road from house no. 13/881 to 858 and house no. 891 to 882 in ward 74 Sa-13 by Dans.
Repair work of damaged roads from house no. 13/817 to 832 and house no. 13/595 to 13/518 in ward 74 Sa-13 by Dans.
Repair work of damaged road from house no. 13/901 to 892 to house no. 633 to 653 in ward 74 Sa.-13 by Dans.
Work of drain and interlocking tiles from Tejpal to Anju and from Vinod Pal to Pushpa Tyagi in Ward-06, Uttaranchal Nagar and from Devendra to Mumtaz house in Deendayalpuri.