Loading…
Loading…
2,491 results • Latest
DEVIKULAM BP 259/2025-26 VAGUVARA FACTORY DIVISION ALP SCHOOL TOILET CONSTRUCTION
DEPOSIT 2024 Replacing damaged portions of 100 mm GI 65 mm GI and 50 mm GI pipes of TWSS to Illichary in Muttom GP Ward 11 Muttom GP Project No 185 25
DEPOSIT-2024 Replacement of corroded 25 mm GI pipe line with 40 mm GI pipe line from Kollamkunnu GLT to Olikkal area of RWSS to Muttom in Muttom GP Ward 5 6Muttom GP Project No. 183 25
E tender for supplying chemicals and fertilisers in various plantations of gavi and pamba subunit of kfdc gavi division
Pro no 132 2024 25 Annual Plan2024 2025 Devikulam B P Construction of Drinking Water project Sahayapooramm
DEVIKULAM BP 268/2025-26 CONSTRUCTION OF TOILET IN MUNNAR LF HIGH SCHOOL
DEVIKULAM BLOCK PANCHAYATH 83/2025-26 VILAKKUBHAGAM DRINKING WATER PROJECT
Annual Plan-2025-26 Devikulam BP- Neymacaud west muster to 20 acre road
DEVIKULAM BLOCK PANCHAYATH 278/2025-26 DEVIKULAM BLOCK PANCHAYATH CONFERENCE HALL MAINTENANCE
Purchase of Washer Disinfector
Side protection
DEPOSITWork.CARWSS to Alakkode and Adjoining Villages. Pipeline Extension of 40 mm GI pipes and Providing Water Connection to households in a water scarcity area at Idivettippara colony in Alakode Panchayath.General Civil Work
Annual Plan-Devikulam GP 2025-26 Ward 13 Chokkanad muthu house to kaliyappan temple footpath concrete-Project No-316/26-General Civil Work
Annual Plan-MGP Project no-568/24- 25,Thannickapathal IHDP kulamamkuzhy veede bhagam nadapatha re construction handrail ward 16-MGP-General Civil Work
Annual Plan-Project no -67/24-25 Thannickapathal IHDP Colony road Mundakathuvayal Rajan bhagam footpath maintenance-Thannickapathal IHDP Colony road Mundakathuvayal Rajan bhagam footpath maintenance ward 16-General Civil Work
WELL RENOVATION
GENERAL-IW-Investigation for Upgradation of Alakode Karimannur Kachirappara Road in Idukki District-Investigation Work
Implementation of MWSS at Kumily Onnam Mile(Near Kairaly Library and Recreation Club), Kumily Grama Panchayath in Idukki district
DEPOSIT 2024 Pipe line extension to Pachilaamkunnu using 40 mm GI pipe in Muttom GP Ward 4 Muttom GP Project No 184 25
Provisions for culvert- earthwork, 136 for culvert bed, M20 for abutment, steel and M20 for slab are included in the estimate
The estimate is prepared for the investigation works of Muvattupuzha Theni Road (SH 43) coming under roads Sub division Thodupuzha Sections - Thodupuzha and Karimannoor .The Proposed investigation works Starts at location Perumankadom
GENERAL-Traffic safety works-Traffic and road safety works on Gandhi Square Junction Thodupuzha -General Civil Work Re tender
Annual Plan-Construction of Mini MCF (proj.no- 99/25)-In Udumbanchola G.P-General Civil Work
Carrying out the work of sweeping, cleaning toilets and wash basins in the Circuit House and IB at Moolamattom for the period from 01-04-2026 to 30-09-2026
Annual Plan-SPRA-83/26-Pooppara Take A Break Name Board
Annual Plan-2023-2024 - SANTHANPARA G P-Pro. No - 98/24 - POONCHILAAYI ROAD MAINTENANCE
Annual Plan-SPRA-129/26-AE - ICDS - Office Renovation
Annual Plan-SPRA-91/26-Construction Of Santhanpara Stadium
Annual Plan-SPRA-250/26-Rajappara Waiting Shed and Shop Room Maintenance
Hiring a 5 Ton lorry (registered within 15 years) with driver for the use of Transmission Circle Store, Thodupuzha for a period of one year
Annual Plan IDUKKI PACKAGE MODEL ANGANVADI AT SHEDUKUDI IN EDAMALAKKUDY GP SHEDUKUDI General Civil Work RE TENDER
Annual Plan MODEL ANGANVADI IDLIPARAKUDI IN EDAMALAKKUDY GP 1 25 General Civil Work RE TENDER
GENERAL-Running Contract for Quarters buildings under Buildings section Adimali. 2025-26-Running Contract for Quarters buildings under Buildings section Adimali. 2025-26-General Civil Work
Construction of Retaining wall and providing 20mm bit CC to Panikkankudi Kombodinjal Ponmudi Road
CGPC work,tile work Concrete work
RETENDER - GENERAL-Kanjikkuzhy Gramapanchayath - Project-SO O29/24 - Electrifi cation of Pazhayarikandam Community Hall-General Electrical Work
RETENDER- GENERAL-Kanjikkuzhy Gramapanchayath SO315/24- Electrification in Mazhuvady Community Hall-General Electrical Work
Retender G E N E R A L - I d u k k i K a n j i k k u z h y Gramapanchayath-Light Installation in Chelachuvadu -Panchayath Ground-General Electrical Work
LAC ADS Anakulam Edaseripadi Sadipadi Mondalomkunnu road Concreting
LAC ADS Pallipadi Pullikudipadi road concreting
LAC ADS Sharonpuram Attikunnu road Concreting
Vellathooval GP works Chek Dam Sivanpadi road maintenance
Vellathooval GP works Kathipara Janakeeya Arogyakendram Maintenance
Annual Plan-S 198/2023-24 OF ADIMALY BLOCK PANCHAYATH-RENOVATION OF PULLUKANDAM - MARADIPPADI ROAD OF KONNATHADY GP IN DIV 11
Vellathooval GP works Anganvadipadi Anikudipadi roa
Vellathooval GP WorksParamupadiMangapara road
Vellathooval GP Works Vellathooval Krishibhavan Truck lane road
Vellathooval GP Works Muthuvankudi Babupadi Uthamanpadi road
Vellathooval GP works Thokkupara Anganvadi Compound wall
Vellathooval GP Works Mangalathupadi Chittadichalil road