Loading…
Loading…
785 results • Latest
Repairing of 01 No. Kirloskar Make RKB-150/34K 03 Stage Pump at Old Mines, NCPH Sub Area
Preparation of pumping sheds during monsoon at Chirimiri OCM.
Providing and placing cement bags filled with earth as and when required at Chirimiri OCM during mansoon period.
Drilling 03 no.s of boreholes in Katkona Sub Area for supplying water for colony, Mainmagzine, CM machine
Supply, installation, testing and commissioning of Video Conferencing systems(VC End equipment+ 98, Supply, installation, testing and commissioning of Video Conferencing systems(VC End equipment+ 86
Construction of Indoor Stadium at Ward 01 in Umarpoti Road
Facility Management Services - LumpSum Based - Residential; O&M of water supply work for colonies; Consumables to be provided by buyer
Shunt Trip Coil Assembly 110V DC NVCB V 0001, Direct acting type earth leakage relay heavy duty for D O VCB NVCB V 0008, Vacuum interrupter NVCB V 0013, Rectifier capacitor unit 1 ph 16 Amps 110V AC to 110V DC NVCB I 0022, Contact Element NO NVCB P 0026, Contact Element NC NVCB P 0027, Rectifier capacitor unit 15 Amp NVCB P 0034, Earth Leakage Relay NVCB P 0035, 3 Point 3 KV 3 Amps PT Fuse NVCB P 0044, Rectangular Type CBCT NVCB P 0047, 6 Point 6 KV Grade support insulator NVCB P 0051, HRC Fuse link 10 Amps NVCB P 0057, HRC Fuse link 2 Amps NVCB P 0058
Construction of Dome Shed Near Near Hanuman Mandir, Ward 27, Maitri Nagar Risali (C.G.)
Construction of Gaurav Path From Janpad School Badi Bazar to Gurudwara Chowk Godripara, W.No. 20
Making shed for transformer at 400 B type Qtrs. Of Kurasia Colliery at Chirimiri Area
Portable Toilet (Q3)
Electrical Rubber Safety Hand Gloves Class 4, Electrical Shock Resistant Safety Shoes, Electrical Rubber Safety Hand Gloves Class 1
Handpump Sub-Assemblies (Deepwell Hand Pumps Components) Conforming IS 15500 (Part 3) (Q3), Steel components (Deepwell Hand Pumps Components) as per IS 15500 (Part 4) (Q3), Cast Iron Components (Deepwell Hand Pumps Components) Conforming to IS 15500 (Part 5) (Q3), Brass/Bronze Components (Deepwell Hand Pumps Components) as per IS 15500 (Q3), Rubber Components (Deepwell Hand Pumps Components) as per IS 15500, IS 12732 (Q3) MSE Relaxation for Years Of Experience and Turnover Yes | Complete Startup Relaxation for Years Of Experience and Turnover Yes | Complete
INTEGRATED SECURITY SURVEILLANCE SYSTEM SERVICE - Remote Video Monitoring, Monitor Operations, Public Safety; Recording Devices; Maximum security footage; Buyer’s premises; NA; NA; NA; NA; No
Facility Management Services - LumpSum Based - Residential; Providing Contractual assistance for day to day work at Town Administration Section of E&M Department at GM Complex, AHQ Chirimiri Area; Consumables to be provided by buyer
Repairing of WBCS and Boom barrier equipments damaged due to lightning at Kurasia UG Mine.
Providing and Fixing of Reversing Isolator in the starter of both main mechanical ventilator to comply the CMR 2017, Regulation 154 (5) Main mechanical ventilator , its drive and fittings at Kurasia UG Mine, Kurasia Group
वार्ड क्र. 13 में सामुदायिक भवन निर्माण कार्य।
Handling, Transport and Other Mining Services - Percentage quote based - Preparation of sand cartridge at surface of size length 35 cm dia 35mm equivalent size instructed by colliery manager to use as stemming material for blasting work in Katkona 1 ..
Handling, Transport and Other Mining Services - Percentage quote based - A Dismantling, Transportation and installation of 1000 mm wide belt conveyor in 85 Level East proposed depillaring panel and West Block B Dismantling, Transportation and ins..
Portable Toilet (Q3)
ward no 03 dr. Bhimrao ambedkar mangal bhawan CONSTRUCTION
Construction of 18 Nos. Ventilation Stopping at 21LE proposed LHCM Panel of Seam - II in Pandavpara Mine.
Handling, Transport and Other Mining Services - Percentage quote based - Marching shifting of 6 nos of SDL 3 no UDM and 3 nos Auxiliary fan from 18 LW panel 24LW 3 dip panel and 19 LE panel to 25 LE in Seam II of Katkona 1 and 2 incline
Repairing/ Rewinding of various capacity motors of Baikunthpur Area.
NIT 1125 Construction of CC Road Under MMGGPY PKG NO C.C. road with Drain Akshaylalkeghar se shiv Mandir ki ore, District-Manendragarh Chirmiri Bharatpur
NIT 1125 Construction of CC Road Under MMGGPY PKG NO C.C. Road with Drain NH 43 To Eklavya School ToLoharpara, District-Manendragarh Chirmiri Bharatpur
NIT 1125 Construction of CC Road Under MMGGPY PKG NO MMGGPY-KRY-KHAD-1(05 work, District-Manendragarh Chirmiri Bharatpur
NIT 1125 Construction of CC Road Under MMGGPY PKG NO MMGGPY-KRY-BKP-06(02 work), District-Koriya
Beautification of Muktidham at ward 04
DRILLING 150 M.M.DIA, 120 METER DEPTH TUBE WELL & HANDPUMP INSTALLATION WITH PLATE FORM.
Constraction of Muktidham At Ward No. 03
Construction of Compost Shed, At Amanalla, Godripara
Providing & Laying of Pipeline For Water Supply, At W.No. 18, Teenda Dafai, Haldibadi
PLATE SHEARING BLADE 6MM - 8MM CHURCHA MINE (RO), PLATE SHEARING BLADE 6MM - 8MM PANDAVPARA MINE
CONSTRUCTION OF C.C. ROAD FROM MAIN ROAD TO BHUSA GALI TRANSFARMA AT W.N. 08 (2nd Call)
CONSTRUCTION OF C.C. ROAD FROM PURANA AJAY MADICAL TO MAIN ROAD AT W.N. 09 (2nd Call)
CONSTRUCTION OF C.C. ROAD FROM PATEL COLONY AT W.N. 04 (2nd Call)
CONSTRUCTION OF C.C. ROAD FROM AWADHRAM HOME TO BAJARANG SAHU HOME AT W.N. 05 (2nd Call)
CONSTRUCTION OF C.C. ROAD FROM SHAHID KHAN HOME TO BAJARANG SARTHI HOME AT W.N. 04 (2nd Call)
CONSTRUCTION OF DRAIN FROM BALIRAM HOME TO PARMESHWARI MANCH AT W.N. 02 (2nd Call)
CONSTRUCTION OF C.C. ROAD FROM MAIN ROAD TO AWADH DEWANGAN HOME AT W.N. 14 (2nd Call)
Malma cleaning and removal of scattered/fallen coal below conveyor and transfer point on TC-1, TC-1A and up to 17L of 4A seam at Haldibari UG Mine
Filling of surface cracks over depillared panels at Vijay West UG mine, RASA.
Repair of boundary wall and fencing with concertina coil around proposed coal stockyard at R-6 mine of NCPH Sub Area at Chirimiri Area
Pipe line extension work A. Extension work from Komal thakur house to Sethiya house at ward No. 05 (180m) B. Extension work from Niranjan sahu house to N.K. sharma house at ward No. 08 (100m)
Beautification & Renovation of Muktidham At Ward No.15
Boom 6 M Long
Handling, Transport and Other Mining Services - Percentage quote based - Transportation laying and fitting 6 X 6 mtr PVC Pipe from 84L Dam to 96L 6X for installation of 500 GPM 6 stage pumps at 96L 6X and Transporting of Motor pump set 500 GPM to 96 ..