Loading…
Loading…
785 results • Latest
Annual maintenance of sanitation of regional work shop building Korea at Chirimiri Area( For Two Year).
Repairing of coal transportation road by filling of potholes with WBM from main road to kurasia UG mine of Chirimiri Area.
04 Nos Beautifications work at Ward 06 and 07 (Group 04) (1st Call)
05 Nos Footpath and Fencing work at Ward 03,04,06 and 10 (Group 06) (1st Call)
03 Nos Extension of Pipeline at Ward 04,09 and 14 (Group 05) (1st Call)
14 Nos Drain work at Ward 01,03,04,05,07,11,12 and 14 (Group 03) (1st Call)
Road Construction Work at Ward 04,05,06,11,13,14 and 15 (Group 01) (1st Call)
GLV ELEC HND RBR 3 Point 3KV IN NUMBER, WHISTLE MOUTH MANUAL, SAND TYPE DUST STONE, JACKET SAFETY TYPE LIFE COMMERCIAL SIZE LARGE, JACKET SAFETY TYPE WATER FFT W ATTACHEMENT, MATERIAL TYPE LIME STONE DUST FFT DEVOID OF FREE SILICA
Digital water level recorder, 4 inch DWFM with telemetry METER; FLW, WTR, 4IN, 283CUM/HR, DGTL, W/TLMTRY, 6 inch DWFM with telemetry DIGITAL ELECTROMAGNETIC FLOW METER WITHINBUILT TELEMETRY SYSTEM
HT Hexagonal Head Nut and Bolt Size M 30 X 150, HT Hexagonal Head Nut and Bolt Size M 25 X 150, HT Hexagonal Head Nut and Bolt Size M 25 X 125, HT Hexagonal Head Nut and Bolt Size M 18 X 75
Malma cleaning and removal of loose coa/debris from underground galleries along 2D incline mouth from TB-1,TB-2,TB-3,11LS 1st, 11LS 2nd , 11LS 3rd , 52D, 26LS, 57D and 32LS belt conveyor
Construction of 52 Nos. RCC Isolation Stoppings in proposed Panel No. 4J-8 ( Sub Panel No. 4J-8A and Sub Panel No. 4J-8B) of 4A seam and sealing between sub panels 4J-8A and 4J-8B of 4A seam at Jhria UG Mine
Preparation of sand cartridge at surface for use in stemming material for blasting purpose at Jhiria UG Mine.
Integrated life time Lubricated Cartridge Suitable for 1200 MM Top Roller Assembly Bearing 6205, Integrated life time Lubricated Cartridge Suitable for 1200 MM Bottom Roller Assembly Bearing6207, Integrated life time Lubricated Cartridge Suitable for 1000 MM Top Roller Assembly Bearing 6205, Integrated life time Lubricated Cartridge Suitable for 1000 MM Bottom Roller Assembly Bearing 6206
Construction of 50 nos. PCC Ventilation stopping for ventilating 26LS and 32LS proposed panel of seam C at Bijuri Colliery of Hasdeo Area.
Site preparation work for Installation and commissioning of 1.4 Km long Set-II and 1.55 Km long Set-I chairlift man riding system at V-Top seam of Baherabandh UG Mine, Hasdeo Area, SECL.
Construction of Footpath & Chainlinked Fencing Work, At W. No. 31, From Sulabh to Gorakhnath Mandir, Godripara
Construction of Community Hall, At W.No. 32, Near Laxmi Panda House, Godripara, Chirmiri
Construction of C.C. Road, At W.No. 16, From Laksmi Narayan House to Teju House, 06 No. Dafai, Haldibadi
Construction of C.C. Road, At W.No. 09, From Community Hall to Loharpara, Gelhapani
Construction of Community Hall, At W.No. 16, Near ICICI Bank, Haldibadi
Transportation and installation of 1000mm Belt conveyor and erection of stone dust barrier in 75LW CM Dev. District in V-Top Seam at Baherabandh UG Mine of Hadeo Area
Maintenance of travelling roadway from incline mouth to LHCM panel in seam A at Kurja UG Mine of Hasdeo Area.
Monthly Basis Cab and Taxi Hiring Service - Without Fuel - SUV; Mahindra Scorpio, Mahindra Bolero, Hyundai Creta; The age of vehicle shall not be more than 2 years from the scheduled date of opening of Tender and shall be counted from the date of 1st..
Handling, Transport and Other Mining Services - Percentage quote based - Salvaging of material from 18 LW Panel to transporting of 23 LW Panel then installation of double drive, belt structure, lying of cable and shifting of belt conveyors in seam II..
Repairing/Rewinding of 16 Nos. Induction Motors of different capacity of different units of Chirimiri Area
Facility Management Services - LumpSum Based - Providing assistance in day to day electrical operation and maintenance work in substations overhead lines official and residential establishments for a period of 12 months 313 days in all three shifts u..
Arc Flash Suit (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
Construction of 11 Nos. Sectionalisation Stoppings in Seam-II of Katkona 1 and 2 Incline.
Construction of 04 Nos. RCC Isolation Stopping for sealing of return galleries near to East Fan of East Block of Churcha Mine (RO).
Erection of temporary stoppings by old reject conveyor belt in 11Dip, -5Dip and -3Rise Dev. District in 8A2 Seam of 5/6 Incline , Preparation of loading points in -1Dip, --5Dip and -3Rise Dev.District in 8A2 Seam of 5/6 Incline at Rajnagar
Cleaning of 27L/2Dip and -11Dip Sump in seam C at Kurja UG Mine
Cleaning of Spillage coal/slurry coal below CHP Bunkers/feeders at Rajnagar RO CHP of Hasdeo Area.
Cleaning of coal/malma/debris below and sides of belt conveyors of Rajnagar RO Colliery of Hasdeo Area
Regular cleaning of weighbridge/near and around weighbridge area for smooth weighbridge from weighbridge during transport of coal from Jhiria UG Mine.