Loading…
Loading…
1,783 results • Latest
SUPPLY and INSTALLATION TESTING AND COMMISSION OF WATER LOAD BANK FOR LOAD TESTING OF 500kva 750 VOLT 3 PHASE DG SET OF POWER CAR AS PER ATTACHED ANNEXURE.
SPL REPAIR TO SEPTIC TANK AND SOAKAGE WELL AND OTHER CONNECTED WORKS FOR BLOCK NO 01 TO 03 AND 38 TO T-08 AND 45 AT GFA FAFA UNDER GE (WEST) LUCKNOW
COMPREHENSIVE MAINT TO GOVT MD ACCN OF SAL BAHADUR, PHURBA ENCLAVE AND ADJOINING AREAS UNDER AGE B/R-I UNDER GE (WEST) LUCKNOW
COMPREHENSIVE MAINT TO GOVT MD ACCN OF NIRBHAY VIHAR AND ADJOINING AREAS UNDER AGE B/R-I UNDER GE (WEST) LUCKNOW
Provision of CCTV surveillance system at 05 Parcel offices (GD, BST, GKP, STP, LMP) with 05 year AMC & Provision of Stainless Steel dustbin with grouting & Furniture in Baby Feeding corner at stations.
NER-LJN Division:- Improvement of Electrical Sub Station buildings at BNY , BMJ , UB , CIH & SOT stations, upgradation of pannel room & rest room etc. at SUBR, ITE, GAW, TLR, PPW, BNY, PRZ, SOT, CIH & SDDN, Provision of Store room for commercial department (size 3x4 m) at TLR & BLP stations, Construction of TI office at BNY, provision of standard Tactile guide/pathway at PPW, JKNI & SUBR platform and construction of gang rest room at 12 locations under jurisdiction of Sr.DEN-HQ/LJN.
REPAIR/COMPREHENSIVE MAINT OF CWE OFFICE 1806 POINEER UNIT 137 TA 20 ADU 41 FARS AND SSD COMPLEX AND ADJOINING AREAS UNDER GE (WEST) LUCKNOW
WELCOME MAINT AND PERIODICAL SERVICES IN ZONE C AREA OF UNDER AGE B/R-I UNDER GE (WEST) LUCKNOW
(1) TBSR (H-Beam) under SSE/P.Way/BLP section-960 Nos. (2) TBSR (H-Beam) under SSE/P.Way/BNY section-880 Nos.
PROVISIONING OF ONE OVERHEAD FILLING POINT WITH 05 HP MOTOR PUMP AND AUTO CHANGE OVER SWITCH FOR AIR CONDITIONERS AT RT CABIN AT AF STN BKT