Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
459 results • Latest
D type Fire station Staff Quarters at Kalimela_Building
Improvement to MI Tank at MV-79/80 in Kalimela Block of Malkangiri District under Critical Grant for the year 2026-27.
CONSTRUCTION OF ROAD FROM MALKANGIRI AIRPORT TO BALIMELA CHHAK IN THE DISTRICT OF MALKANGIRI
Lacheru to Dhemasapadar via Similiguda, Dabuguda, Chepaipada Road under MMSY-CUVDA in the District of Malkangiri for the year 2024-25
Sweeping of Streets daily or more cleaning of drains door to door garbage collection and lifting of garbage bush cutting supply of tractor with trolly and water tanker including driver and any other items as and when at Ward No 01 to 19
Construction of Staff Quarter at Bhaluguda Ashram School in Malkangiri Block
Construction of Staff Quarter at Tangguda Ashram School in Mathili Block
Construction of Staff Quarter at Saunliguda Ashram School in Mathili Block
Construction of Staff Quarter at Biralaxmanpur Ashram School in Malkangiri Block
Construction of RD Road to Kadamguda in the District of Malkangiri under Mukhya Mantri Sadak Yojana (MMSY) for the year 2026-27.
Metal Gravelling over P.C.C with drain of CKD-II, Unit-7, Unit-8, OPTCL and 16th Bay area at 220 K.V Switchyard of BHEP, Balimela.
Mens Casual Shirt (Q3), Pants (Q3), Kurtis and Kurta Sets - Handicraft (Q3), shoes school pvc boys girls (Q3) (3 (3 ))
Repair. Overhauling, replacement by supply, fabrication, transportation, erection with painting and testing of 10 (Ten) Nos, spillway radial gates of size 12.190 mtr x 12.190 mtr with hoisting arrangements Balimela Dam (Joint ) Project
Off - Grid Solar Photovoltaic (PV) Power Plant (V2) (Q3) (3 (3 ))
Detail estimate for Sweeping of streets twice daily or more cleaning of drains door to door garbage collection and lifting of garbage bush cutting supply of Tractor with trolley and water tanker Including Driver and any other item as and when require
Supply, Installation, Testing and Commissioning of AIO LED Solar Street Lights at Airstrip, Malkangiri during 2025-26.
Entry and Mid Level Desktop Computer (Q2), Line Interactive UPS with AVR (V2) (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
Mens Casual Shirt (Q3), Pants (Q3), Kurtis and Kurta Sets - Handicraft (Q3), shoes school pvc boys girls (Q3) (3 (3 ))
Boundary Wall phase-I at Chitrakonda Farm in Malkangiri District
Repair of PDS at RD.1.148Km of Kunanpalli Distributary.
Repair of CD at RD.46.549Km, De-silting and strengthening of Canal embankment at vulnerable reaches from RD.44.800Km to RD.45.910Km of GMC.
Canal lining,Re-sectioning and Restoration of structures in between RD2.760km to RD 3.960km of Lugal Minor and in between RD 0.000km to RD 1.294 km of Lugal S/M-II for the year 2026-27.
Canal lining,De-silting and Restoration of structures in between RD 0.000 km to RD 2.010 km of Uskaguda Minor and in between RD 0.000km to RD0.675km of Uskaguda S/M-II for the year 2026-27.
Trough lining and renovation of structures from RD.0.000Km to RD.1.760Km of Katameta S/M-V and trough lining from RD.9.746Km to RD.10.800Km of Jabanpalli Minor.
Canal lining,De-silting ,Re-sectioning and Restoration of structures in between RD 0.000 km to 3.990 km of Malavaram Minor for the year 2026-27.
Canal lining,Desilting and Re-sectioning in between RD.3.460Km to RD.6.000Km of Goraspalli Minor for the year 2026-27.
Online UPS (?10 KVA) Without Battery Conforming To IS 16242 (Part 1) (Q2), Online UPS (?10 KVA) With Battery Conforming To IS 16242 (Part 1) (Q2) (3 (3 ))
Repair to HL Bridge over poteru on Putampalli to MPV-69 Road for the year 2025-26
Repair and Renovation of Residential Building Projects at SS 4th Bn. Malkangiri for the year 2025-26
Repair to HL Bridge over Local Nallah at 2nd Km on Bhejangiwada to Gumuka Road_Road_Refixing of guard post and painting, stone pitching and toe wall_At 2.000 km
Repair to HL Bridge over Local Nallah on Rakhelguda to MV-26 Road_Road_WMM and BT work in the Bridge approach,Refixing of guardpost and Painting,Toe Wall_At 1.000 km
Repair to HL Bridge over Const. of over River Tamasa at 1st Km on Kamaliguda to Pitagetta Road_Road_WMM and BT work in the Bridge approach,Refixing of guardpost and Painting,Toe Wall_At 1.000 km
Repair to H.L. bridge over local nallah at 3rd km on Kotaguda to Alsaguda in the District of Malkangiri._Road_WMM and BT work in the Bridge approach,Refixing of guardpost and Painting,Toe Wall_At 3.000 km
Repair to Bridge over Const. of over River Potteru at 0.980km on Putampalli to MV-79 Road _Road_Stone pitching, Painting of guard post,toe wall_At 0.980 km
NM Road to Koyakonda Road_Road_Side berm, Signage, RCC Culvert-1x2x2-_At 0.700 km
Mottu - Binayakpur_Road_Pot holes -WMM Gr-III, PMC and SC-Shouder Repairing and Road Furniture_0.000 to 4.100
Const. of 4 Nos. of Additional Classroom at SSD Girls High School, Satiguda in Malkangiri Block
Const. of 4 Nos. of Additional Classroom at Tumusapally Ashram School in Korukonda Block
Construction of Adivasi Sanskruti Bhawan at Malkangirii in Malkangiri Block
Construction of Adivasi Sanskruti Bhawan at Korukonda in Korukonda Block
MV _ 33 to Gangalawada Road_Road_Pot hole repair, Berm work and Road furnitute,bush cutting _0.000 to 1.500
P W D Road to Kotaguda_Road_SDBC, Side berm, and Road Furniture_0.000 to 1.200
BM Road to MV.122_Road_SDBC, Side berm, and Road Furniture_0.000 to 0.500
P W D Road to Kotaguda_Road_SDBC, Side berm, and Road Furniture_0.000 to 1.200
Canal Bank to MV.49_Road_SDBC, shoulder, and Road Furniture_0.000 to 1.000
PWD Road - MV 114 A_Road_2nos Boxcell culvert-1X6X3-_At 1.100 km and 1.300 km
Mandiguda - Bandaguda_Road_2nos Boxcell culvert-1X4X2-with Approach road and Protection wall_At 0.365 km and 2.000 km
Construction of 24 Nos F-Type Staff Quarter S plus 3 at Nabarangpur. Building.
Korukonda to Tamasapalli Road -Part - l-_Road_SDBC, shoulder, and Road Furniture_0.000 to 2.000
Korukonda to Tamasapalli Road -Part - ll-_Road_SDBC, Side berm, and Road Furniture_0.000 to 2.000