Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
681 results • Latest
Roof treatment of Quarter guard under the charge of 124 Bn BSF at Nalkata campus under SHQ BSF Panisagar
CO Retaining wall back side of CHDH at BOP Sonaichera of 97 BN BSF under SHQ BSF Panisagar
Repair and maintenance of CGI sheet roofs in Tubular structures under occupation of SHQ BSF Panisagar.
Improvement of Tubular structures under occuption of 199 Bn BSF under SHQ BSF Panisagar
Water proofing of Magazine building at 199 Bn BSF campus panisagar under SHQ BSF Panisagar
SH Lifting and lowering of submersible pump motor Rewinding and repairing of different types of pump motor etc and all allied works within the jurisdiction of Jampui Hill RD Block under DWS SubDivision Kanchanpur
SH Providing fixing in/c repair of electrical panel board comprising with starter main switch motor protection device etc in different water supply scheme within the jurisdiction of Jampui Hill RD Block under DWS SubDivision Kanchanpur
SH Periodical clearing Of intake well mtc Of VT pump motors and other allied works etc at Kanchanpur surface water Treatment plant 0.65 MGD under DWS SubDivision Kanchanpur during the year 202627 2nd Call
Maintenance Of Drinking water supply scheme in North District under NRDWP/RWS/FFC fund during the year 2026-27/ SH Re- winding ,repairing Of different types Of pump motor including Lifting Lowering of submersible pump motor and all allied works
Replacement of Old 11 KV Indoor VCB Panels with new 11KV Indoor VCB Panels at Dasda 33/11KV Sub-Station under Electrical Sub-Division, Dasda under the jurisdiction of ED-Kanchanpur TSECL
Development of road by providing n fixing road signs road studs road marking crash barrier delenators etc at differtent roads under Jampui Hill Sub-Division PWD(RnB) during the year 2026-27.
Upgradation of KCP-Jalabassa road to Gupalpur via Basanti Brick Ch 0.00 Km to Ch 0.810 Km (Length-0.810 Km) under Jampui Hill Sub-Division PWD(RnB) during the F.Y 2025-2026/SH -Jungle clearing Earth work mtc of earthen shoulder Pucca Drain
Development of road from Patlangrai para to Sananda para under Jampui Hill Sub-Division PWD(RnB) during the year 2026-27 from CH 3.50 Km to CH 5.00 Km (Length-1.50 Km).
Development of road from Patlangrai para to Sananda para under Jampui Hill Sub-Division PWD(RnB) during the year 2026-27 from CH 1.70 Km to CH 3.20 Km (Length-1.50 Km).
Development of road from Patlangrai para to Sananda para under Jampui Hill Sub-Division PWD(RnB) during the year 2026-27 from CH 0.00 Km to CH 1.50 Km (Length-1.50 Km).
Strengthening n improvement of road from Kanchanpur-Machmara to NH44A via Rabirai Para from CH 00.00 km to CH 1.30 Km under Jampui Hill Sub-Division PWD(RnB) during the year 2026-27.
Development of road from Kanchanpur -laljuri road to Sukia Karbari para to Battalla from CH 00.00 km to CH 05.00 Km under Jampui Hill Sub-Division PWD(RnB) during the year 2026-27.
Development / improvement of road from Joyshree-Nabajoy Para road to Lankadhar Para from CH 00.00 km to CH 00.750 Km under Jampui Hill Sub-Division PWD(RnB) during the year 2026-27.
Development of road from NH-44A to Lalnunthanga plot via Vanghmun Electrical Sub-division under Jampui Hill Sub-Division PWD(RnB) during the year 2026-27 (L-0.70 km)
Earth Filling near Manaranjan Nath house to cherra near Amlan Purkayastha land Ward No 4 under Panisagar Nagar Panchayat
Earth Filling of road from Lokhon Nath house to Satyendra Nath house ward no 4 under Panisagar Nagar Panchayat
Development of Road from TD Road to Radhakishorepur via Balicherra from CH.0.00 KM to CH.1.00 KM Total Length 1.00 KM under Damcherra Sub Division, PWD RandB during the year 2026 2027 SH WBM III, Grouting, Carpeting, Seal coating, Pucca Drain, Surfac
Building portion G plus 4 including internal water supply sanitary installation sewage drainage works, Boundary wall and Road Works
Construction of R C C Drain and RCC Retaining Wall Back Side of Dharmanagar Kali Bari Ward No 15 Within D M C area during the year 2025 2026
Construction of New Boundary in front of Children Park and Fishery Training Centre and R C C Drain in front of Children Park within D M C area During the year 2024 2025.
Estimate for Bamboo Palasiding at different locations of Panisagar Nagar Panchayat
Estimate for Bamboo Palasiding at different locations of Panisagar Nagar Panchayat
Construction of Car Wash arrangement in the office premises and boundary wall of office office garden (ward No 10) under Panisagar Nagar Panchayat
Construction of CC Interlocking Paver block road at Raja Rammohan Road ward no 16 within D M C area During the year 2025 2026.
IMPROVEMENT OF TEMPORARY STRUCTURE PRESENTLY UTILIZED AS SOS MESS COOK HOUSE OF SHQ BSF PANISAGAR UNDE SH Q BSF PANISAGAR
IMPROVEMENT OF CONFERENCE HALL AT CAMPUS PANISAGAR UNDER SHQ BSF PANISAGAR
WATER PROOFING WORK ON TYPE-III QUARTER BLOCK(C) PRESENTLY USED AS SOS MESS ACCOMMADATION AT CAMPUS PANISAGAR UNDER SHQ BSF PANISAGAR
Construction of a garage behind the Panisagar Nagar Panchayat office, including the approach road under Panisagar Nagar Panchayat.
Construction of R C C Drain and CC Pavement Road at ward no 06 within DMC area During the year 2025 2026 2nd Call.
Construction of following RCC drain (i) From Nursery Para road to Lina Nath house (W-8) (ii) From Sreema hotel to Juri river (W-2) under Panisagar Nagar Panchayat
Road development of the road from Ramcharan High school to Dangacherra TSR camp road via South Daincherra from CH. 0.00 km to CH.1.50 km Length 1.50 km under Dasda R.D. Block during the year 2026 2027
Development Of the road from Joyshree to Nabajoy Para (Length 8.675 Km), under Jampui Hill Sub-Division, PWD(RnB) during the F.Y. 2026-27 SH WBM,Tack coat, re-carpeting, seal coating, Pucca n Kacha drain etc
Rain water harvesting system arrangement in c necessary water supply at Damcherra RD Block Head Quarter under Damcherra RD Block during the year 2025 26 SH Construction of water tank pipe lines Inspection chamber etc
AMC OF EI WORKS IN GOVT. RESIDENTIAL AND NON-RESIDENTIAL BUILDINGS OF PWD UNDER NORTH TRIPURA DISTRICT, TRIPURA (SECOND CALL)
PROVIDING EI IN NEWLY CONSTRUCTED DOUBLE STORIED DEO OFFICE BUILDING NEAR BBI SCHOOL, DHARMANAGAR, NORTH TRIPURA (2ND CALL)
REPAIR AND MTC OF HIGH MAST AT CHURAIBARI MV CHECK POST COMPLEX, DHARMANAGAR, NORTH TRIPURA
Mtc of different Innovative Water supply schemes under the Jurisdiction of DWS Sub division Damcherra and mitigation fund from RWS JJM RIDF 15th FC BAC NDRF SDRF during the year 2026 27 SH Lifting and cleaning of Filter media Changes
Development of road of the Eden tourist lodge appropach road, under Jampui Hill Sub Division, PWD R and B during the F.Y. 2026 27 SH WBM,Tack coat, re carpeting, seal coating, Pucca and Kacha drain etc.
Providing Earth Filling Bamboo Pallasiding at Ward No 03 18 16 20 within DMC area During the year 2024 2025 2nd Call.
Development of Satnala Bazar internal road Group I under Dasda Sub Division (RnB) during the financial year 2026 27 SH GSB , Paver Block etc.
INTERNAL ELECTRIFICATION OF 100 SEATED GIRLS HOSTEL AT KHEDACHERRA HIGH SCHOOL UNDER R.D. DAMCHERRA SUB DIVISION DURING THE YEAR 2026-27.
Construction of CC Interlocking Paver block road near the house of Pran Krishna Paul at Sarat Sarani ward no 08 within D M C area During the year 2025 2026.
Construction of RCC Double Cell Box Culvert 6m x 5m at Nursery Para near the house of Shri Bikash Paul Ward No 8 under Panisagar Nagar Panchayat
Construction of RCC Double Cell Box Culvert 6m x 5m above cherra near the house of Subarna Nath or Amlan Purkayastha Ward No 4 under Panisagar Nagar Panchayat
Rejuvenation of water bodies at Panisagar regulated market near Suranjan Das house Ward No 12 under Panisagar Nagar Panchayat Retaining Wall and Excavation