Loading…
Loading…
1,221 results • Recent activity
REPAIR TO VOLTAGE STABILIZER UPS APFC LT PANEL BUS BARS AND OTHER CONNECTED WORKS AT AIR FORCE STATION PATHANKOT
REPAIR MAINT OF LT CABLE AND MISC CONNECTED ITEMS AT NO 2 NO 3 AND TECHNICAL AREA AT AIR FORCE STATION PATHANKOT
REPAIR CLEANING OF SEWAGE LINE SEPTIC TANKS SOAKAGE WELL AND MANHOLES IN TECH AREA AT AFS PATHANKOT
REPAIR AND MAINT TO MISC E M WORKS INCLUDING REPAIR REPLACEMENT OF UNSERVICEABLE SECURITY LIGHT FITTINGS MAINT OF DG SETS DIESEL ENGINE REPAIR MAINT OF ALL TYPE EARTHING AT AIR FORCE STATION DALHOUSIE
Composite Long Rod Insulators (POWERGRID) (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Bidder Turnover, Certificate (Requested in ATC), OEM Authorization Certificate, Additional Doc 1 (Requested in ATC), Additional Doc 2 (Requested in ATC), Additional Doc 3 (Requested in ATC), Additional Doc 4 (Requested in ATC), Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No Minimum number of bids required to disable automatic bid extension 3 Bid Number : GEM/2025/B/6957111 Dated : 05-12-2025 Bid Document 1/12, -- Number of days for which Bid would be auto -- extended 7 Number of Auto Extension count 3 Bid to RA enabled No Type of Bid Two Packet Bid Primary product category Composite Long Rod Insulators (POWERGRID) Time allowed for Technical Clarifications during technical evaluation 3 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Advisory Bank State Bank of India EMD Amount 346000 ePBG Detail Advisory Bank State Bank of India (%) ePBG Percentage(%) 5.00 ( ) Duration of ePBG required (Months). 20 (a). EMD EXEMPTION: The bidder seeking EMD exemption, must submit the valid supporting document for the relevant category as per GeM GTC with the bid. Under MSE category, only manufacturers for goods and Service Providers for Services are eligible for exemption from EMD. Traders are excluded from the purview of this Policy. (b)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. 2/12 Beneficiary : POWERGRID Power Grid Corporation of India Limited Central Procurement Cell, Plot No. – 2A/INS 02, Avadh Vihar Yojna, Amar Shaheed Path, Near Medanta Hospital Lucknow- 226002 (UP) (Power Grid Corporation Of India Limited)
REPAIR AND CLEANING OF SEWAGE LINES, MANHOLES, DRAINS, SEPTIC TANKS, SOAKAGE WELL, WELL REPAIRS, HARDSTANDING, FENCING AND CONNECTED ITEMS AT ZONE B AT BD BARI MIL STN UNDER GE KALUCHAK