Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
892 results • Latest
Comprehensive AMC, Preventive and Breakdown maintenance of 5 Ton to 30 Ton EOT Cranes provided for lifting of Motors Pumps,Fans of Unit-1to8-RTPS
Refurbishment of released APH 2B Rotor Drive Unit (RDU) Gearbox
Hiring 02nos of Ambulances round the clock basis for plant & hospital use with GPS for KPCL -RTPS project location for a period of two years (Extendable by one more year on satisfactory service)
Removing of jungle and silt from ch.7.00 km to 8.00 km and ch13.5 km to 15.0 km of Dy-17 of SBC.
CLEANING AND DESILTING OF DRAINAGE IN ALL VILLAGES UNDER PARAWAD GRAM PANCHAYAT, 15th FINANCE COMMISSION GRANTS FOR THE YEAR 2024-25.
Providing Manpower Outsource Service To Department Of Youth Empowerment And Sports Raichur
Stationary Valve Regulated Lead Acid Batteries (V3) Conforming To IS15549 (Q3)
Painting and repairs to SRMCC Building at YTPS
RPCL-2X800MW YTPS- Extension of LAN-OFC connectivity from FOIS Room to Electronic In-Motion Weighbridge (EIMWB) for integration with FOIS at YTPS Railway Siding
Improvement works to Non-Residential Buildings at RTPS Colony
Construction of wall between mill Bay and bottom ash Hopper for retection of mill reject spalling of Unit-1 to 8 at RTPS
Providing electrification works at newly proposed false ceiling work at chemical lab building at YTPS.
Rising of existing MS gratings including painting at TG Floor of Unit -1 to 8 at RTPS.
Grading of soil below BTPS 400 kV transmission lines between tower 1 & 2 at 400kV switchyard RTPS
Removal of silt and Jungle Clerance of Lateral-06, Lateral-07 and Lateral-09 Sonthi Branch Canal of SLIS
Providing and painting to CWPH-1 to 4, Clarifier 1 to 3 and minor repair works at RTPS.
AME of AEE KLIS Sub Division No.2 Kushtagi office Building Maintainance for the year 2025-26
LED Luminaire For Road And Street Lights Conforming To IS
LED Luminaire For Road And Street Lights Conforming To IS
printin
Overhauling and servicing of High pressure valves, Safety valves, Boiler Drum, Tanks, Wall de-slaggers and Cold setting of Hangers of 3X210 MW units- 2 to 4 Boilers (OH-2)
Removal of Silt and Jungle of Sonthi Main Canal of Sonthi lift Irrigation Scheme from Ch.5.00 to 10.00 Km
Supply and commissioning of GE fanuc PLC accessories, up gradation of PLC software and reconditioning of complete PLC system for Stacker/Reclaimer-3 at CHP-1 RTPS
a)Retrofit/Up gradation of existing Schneider make PLC and SCADA/HMI systems installed at RTPS-Unit 8 DPMRHS.b)The bidder/agency shall be required to supply the materials as per the technical specifications and quantity mentioned under the head of technical specifications.c)The bidder/agency shall be required to install and commission the supplied materials in the existing PLC control cubicle itself by retaining existing IPR(Interposing relays),MCBs and TBs.d)The bidder/agency shall be required study the existing software/Logics incorporated in the PLC/SCADA system, further to carryout re-engineering works, software/Logics development based on customer/site requirement and also for the assessment of additional accessories required to complete the Retrofit/Upgradation works in complete manner.e)It is the single point responsibility of the bidder/agency to carry out the works in the stipulated time period.f)Providing required power supply will be under the scope of KPCL itself.g)T&P and any other consumable materials required for the work will be under the scope of agency/contractor only.h)Before quoting the bid, it is compulsion to visit the site for the assessment and studying the site/customer requirement.i)Storage of materials while executing works is single point responsibility of contractor/agency scope itself.j)The agency shall be required to handover as built drawings and software backup CDs (OS,Application and system software) along with O&M manuals 04 Sets.k)Materials supply shall be completed in all respect within the stipulated period as per the contract. Materials shall be delivered to RTPS site through EE(Stores)O&M. Unloading of materials at RTPS site location and shifting of the same to work location is under the contractor/agency scope only.l)Handling, shifting, unpacking and Erection and commissioning of the entire system shall be under the scope of bidder itself.m)All required consumables, hardware and licenced software, accessories and any other materials which are not included in the scope and required for successful installation and commissioning of the Retrofit/Up gradation of existing DPMRHS PLC system of RTPS Unit-8 to latest version will be under the contractor/agency itself.n)All the materials required for the installation and commissioning of Up gradation of existing DPMRHS PLC system of RTPS Unit-8 to latest version shall be made as detailed under the technical specifications and shall be installed and commissioned as per the scope of work.o)Warranty-All the materials and other equipment covered under supply portion shall cover a warranty for a period of 12 months from the date of commissioning or 18 months from the date of supply.Warranty-All the materials and other equipment covered under supply portion shall cover a warranty for a period of 12 months from the date of commissioning or 18 months from the date of supply. Any faulty items/spares observed during this period shall be replaced at free of cost.
Construction of Box Culvert to Sunkeshwarala to Gugal Via Hirebudur,Matpalli MDR at CH.3.10km In Devadurga Taluk Raichur District.Under 5054-80-190-0-01-132 KRDCL Limited Capital Expenditure for the year 2026-27
PROCUREMENT OF CATIONIC POLYELECTROLYTE LIQUID POLY-DADMAC FOR RTPS
Hydraulic Hose
PVC Insulated (Heavy Duty) Electric Cables Marked To IS1554 (Part1) (V2) (Q2)
Alumino - Ferric (V2) Conforming to IS 299 (Q3) (3 (3 ))
Rectification of HP front and rear shaft and bearing vibrations in Brg-1,2,3,4,5 and 6 by HPT overhauling and all bearings inspection works as per SOW at U-2, Ms KPCL-Raichur TPS (210MW)
Construction of neutralization pit near chemical storage shed at YTPS
Construction of Guidewall on both side of canal at Ch 10.10Km of Dy 22A of SBC.
Improvement works to parking shelters around service building area at RTPS.
Seed Processing Plant along with Accessories 4 TON CAPACITY
agricultural implements and equipments
Weighing Balance 32kgs for Gold Bars
Construction of outdoor stadium at Sirwar town Sirwar taluka of Raichur District Work code RCH2318143468 under KKRDB MACRO in Manvi constituency
Erection of HT Junction box and Single Core Copper Power cable termination works for RWPH motors at Jackwell
Procurement of Biocides for RTPS
Providing Permanent power supply source to In-motion Weigh bridge inside YTPS as per the scope of work and as directed by site engineer.
Construction of CC road & Drain in ST Colony at Julamgera Village in Raichur Taluka of Raichur District. (Under 5054-03-337-0-75-422/423 (TSP) Grant for the year 2025-2026)
Improvement to the Road from Chik kotanekal to Nalagamdinni cross (SH-128 from KM 70.71 to 71.56) in Manvi Constituency(RCH2518222426) in Manvi taluka of Raichur district under KKRDB MICRO TSP of the year 2025-26.
Construction of Scientific landfill site in swm site of survey no 93 in Myadaral village
Repair/Rectification of HT/LT overhead line and Rewinding/Repair of Ceiling, Wall mounting and Pedestal fans for a period of 12 months
RTPS-Annual Maintenance Contract for Motorola make VHF Wireless sets of Coal Handling Plant at RTPS
Providing And Laying Of Wearing Coat To Pattanna panchayat Office Roof In TP Hutti Limits
Procurement of Turbine Main Oil Pump Spares for Unit 2
Construction of compound wall to SWM landfill site at sy No 93 Myadaral village
Providing height guages for controlling overload ash vehicles in ash pond at RTPS.