Loading…
Loading…
1,213 results • Recent activity
Estimate for repair of Parapet wall, Wing Wall of Main JLN Canal Between 49.000 to 53.000 Km
Estimate for Internal Clearance of Nikhri Disty. from Km. 0.000 to 11.251 (Tail) for Rabi 2025
Estimate for Construction of Toilet(for Mech Staff) at Pump house PD-1 at KM. 2.830 of Pranpura Disty.
Estimate for Construction of Toilet(for Mech Staff) at Pump house JC-6 at KM. 49.000 of Main JLN Canal.
The lifted water from Masani Barrage will be conveyed and disposed through a 1800 mm gravity RCC NP 3 pipeline from the tail of Sahibi River to Indori River crossing at luhari disty.
Pali Drilling of 01 No Tubewell and installation of 01 No Pumping Machinery in village Pali by DR Rig Method Only Distt Faridabad