Loading…
Loading…
3,452 results • Recent activity
LED Luminaire For Floodlight Conforming To IS10322 (Part5/Section5) (V3) (Under BISScheme-II) (Q2)
Construction of Strom water drain at both sides in Sanathi street (Unicode.189012R208) South Car Street(Unicode.189019R296),at ward no.12 19 and in Tharamangalam Municipality.
Clearing the mill rejects from mill area reject coal from EL 3 5 mtr floor and coal from EL 17 mtr feeder floor to EL 0 mtr and transporting to reject yard near silo coal yard by using contractors vehicle for the quantity of 5500 Tons
Providing Protection wall at Western side of the 9.00M PSC Yard at MEDC Mettur - As per BQR Conditions
MTPSI Mill Plant IV Complete overhauling of gearbox mechanical face seal assembly worm shaft assembly replacing the worn out bulged insulation cover plate assembly scrapper assembly and worn out flexi coupling etc in Mills 4A to 4F during AOH
MTPS I Mill Plant Unit IV Clearing the Mill rejects from Unit-III IV Mill Feeder area weighing in departmental weighbridge and Transporting to rejects yard G switch yard area coal yard by using contractors vehicle and unloading the same and return