Loading…
Loading…
3,536 results • Recent activity
MTPS 1 BM Unit IV Annual maintenance 2025 26 Hot primary air ducts and hot Secondary air ducts of A and B sides Cleaning the accumulated ash arresting the air leakage by rectification of the damper and allied works
MTPS I BM Unit I to IV Boiler Pressure Parts Safety Valve floating during AOH 2025
Procurement of M.S Plain plate 6 mm thickness 60 Tons
MTPS I BM UNIT I Boiler pressure parts AOH 2025 Rectification of buck stay beam and supports renewal of wornout buck stay pin Fabrication of buck stay cover plate etc in Ist and II nd pass area and allied works
MTPS I TM UNIT IV Complete Overhauling of HP Bypass LP Bypass Spray Valves Oil Supply Unit during AOH 2025 2026
MTPS I BM Boiler Lift III Preventive Breakdown maintenance of Freight cum Passenger Lift Boiler Lift III of MTPS I for the period of one year from the date of commencement of work