Loading…
Loading…
742 results • Latest
SUPPLY, INSTALLATION AND CONFIGURATION OF PORT FOR COMMUNICATION TO BACK UP SLDC MODI PURAM IN GE T AND D MAKE SCADA SYSTEM AT 220 KV S/S BANSI
High Mast Lighting Octagonal Tower for Small area with LED Flood Lighting System (V2) (Q2) (3 (3 ))
LED Luminaire For Road And Street Lights Conforming To IS 10322 (Part 5/Section 3) (V3) (Under BIS Scheme - II) (Q2), Octagonal Pole (V2) (Q3) (3 (3 ))
Single/Double Wooden Bed with/without Storage (V2) (Q2) (3 (3 ))
Vidhayak Nidhi (Etwa), Vikas Khand-Khuniyanw, Gram-Chaubepur Me Majhouha Se Choubepur Prathmik Viddyalya Tak 300 Mtr CC Road Nirman Karya.
Providing, Fixing and Operation of Cooling fan on Auto Mode on 40MVA T/F-I (BBL Make) and T/F-II (AREVA Make) installed at 132/33 Sub-Station Bansi under ETD-II, Basti H.Q at Siddharthnagar
Replacement of 02 Nos. Control and Relay Panel for 220 KV Bansi-Basti Bay and 220 KV Gorakhpur (PG)-Bansi Line at 220 KV Sub-Station Bansi Under ETD-II, Basti
Ration Kit (Q4)
Waste Container (V3) (Q4)
Critical Gaips Yojana, N.H. Road Se Madhav Prasad Tripathi Medical Collage Ke Antargat Narsing Collage Tak 540 Mtr CC Road, Solar Street Light, Mini High Mast Light Ka Nirman Karya.
Critical Gaips Yojana, Rastriya Rajmarg Se Lohiya Kala Bhavan Tak 120 Mtr CC Road Ka Nirman Karya.
Banganga Braj ke D.S Farsh Ke Matasy Akhet
Anti-erosion work near village Ahadi between Km 16.290 to 16.340 of Lakhanapar-Baidoula embankment situated on the left bank of Budhi Rapti river in Siddharthnagar.
Anti-erosion work near village Ahadi between Km 16.240 to 16.290 of Lakhanapar-Baidoula embankment situated on the left bank of Budhi Rapti river in Siddharthnagar.
Anti-erosion work near village Ahadi between Km 16.190 to 16.240 of Lakhanapar-Baidoula embankment situated on the left bank of Budhi Rapti river in Siddharthnagar.
Supply and storage of stock material (porcupine) for pre-flood preparation at the departmental store located at Sirwat Kothi.
Supply and storage of stock material (empty cement bags) for pre-flood preparation at the departmental store located at Sirwat Kothi.
Supply and storage of stock material (geo bags) for pre-flood preparation at the departmental store located at Sirwat Kothi.
Supply and storage of stock material (nylon kits and geo bags) for pre-flood preparedness at the departmental store located at Sirwat Kothi.
Supply and storage of stock material (nylon kits and geo bags) for pre-flood preparedness at the departmental store located at Sirwat Kothi.
LOPPING/CHOPPING AND TREE CUTTING IN THE CORRIDORE OF DIVERSION OF 132KV BANSI-NAUGARH LINE
LOPPING/CHOPPING AND TREE CUTTING IN THE CORRIDORE OF DIVERSION OF 132KV BANSI-ITWA AND BASTI-DUMARIYAGANJ LINE
Repair of Plumbing Work at Navodaya Vidyalaya Bansi Distt Siddharthnagar (U.P.)
PROVIDING AND FIXING OF 150 W LED LIGHTS ALONGWITH OTHER ASSOCIATED WORKS AT 132KV S/S DUMARIYAGANJ AND 132KV S/S NAUGARH
Facility Management Services - LumpSum Based - Commercial; supply and installation CCTV camera on octagonal pole with all accessories; Consumables to be provided by service provider (inclusive in contract cost)
Portable Toilet (Q3)
Anti Erosion work Between Km. 2.100 to Km. 2.400 and Construction of Counter Berm Between Km. 0.200 to 0.400 and Km. 1.000 to Km. 1.500 of Bhawari Gayghat Azagara bund on left bank of River Rapti in Distt. Siddharthnagar.
Anti Erosion work Between Km. 6.600 to Km. 6.900 and Protection work of Village Amariya Tola Sangaldeep Between Km. 8.000 to Km. 8.600 of Bhawari Gayghat Azagara bund on left bank of River Rapti in Distt. Siddharthnagar.
Vidhayak Nidhi (Dumariyaganj), Vikas Khand-Mithwal, Gram-Lohrauli Khurd Me Sukhai Ke Ghar Se Rajaram Ke Ghar Tak 215 Mtr CC Road Nirman Karya.
Vidhayak Nidhi (Dumariyaganj), Vikas Khand-Mithwal, Shriramjot Dubauliya Se SRL Acadamy School Tak 180 Mtr CC Road Nirman Karya.
CLEARANCE OF GAURITAL DRAIN FROM KM. 0.000 TO KM. 2.300
LOADING, CARRIAGE AND UNLOADING OF 18.8KM PANTHER CONDUCTOR FROM 132KV S/S LAXMIPUR TO 132 KV S/S NAUGARH, 132KV S/S BANSI AND 132KV S/S ITWA
SUPPLY AND FIXING OF BUCHHOLZ RELAY SUITABLE FOR 40 MVA-I T/F BBL MAKE AT 132 KV S/S BANSI AND 20 MVA T/F-I GEC MAKE 132 KV S/S ITWA
Replacement of 33 KV VCB of 33 KV Bansi R/L and 33kv Maharwajot bay at 132 KV S/S Bansi
High Visability Reflective Vest (Q3)
Relief Kit
Sansad Nidhi (Lok Sabha), Vikas Khand-Khuniyanw, Gram-Aama Nankar Me PWD Road Se Prahlad Ke Ghar Hote Huye Raju Dube Ke Ghar Tak 200 Mtr Interlocking Sadak Nirman Karya.
Sansad Nidhi (Lok Sabha), Vikas Khand-Jogiya, Gram-Bairwa Me Vijay Bahadur Singh ke Ghar Se Sanskrit Mahaviddyalya Hote Huye Parmatma Ke Ghar Tak 150 Mtr Interlocking Nirman Karya.
Safai vyavastha hetu Safai samagri ki aapurti
Replacement of Damaged Gaskets and Overhauling OLTC/Diverter Switch of 40MVA T/F-II (NGEF make, Mfg. Year 1998) alongwith other associated Works at 132KV Sub Station Naugarh under ETD-II Basti H.Q at Siddharthnagar
supply work
supply work
supply work
civil work
CIVIL WORK AND POLE LIGHT
civil work and light
Event or Seminar or Workshop or Exhibition or Expo Management Service - National; MUKHYA MANTRI SAMUHIK VIVAH YOJNA KE ANTARGAT TENT EVAM BHOJAN KI VYAVSTHA; TENT EVAM BHOJAN KI VYAVSTHA; Buyer premise; Full day
Mukhyamantri Samuhik Vivah Yojana Upahar Kit
LED Based Information Display System (Q4)
Akikrit Vikas Yojana, Zanpad Siddharthnagar Ke Gram-Mankar Me Samudayik Kendra Ka Nirman Karya.