Loading…
Loading…
394 results • Latest
430 DIA ROLL FOR RM ENTRY AND DELIVERY TABLE
Oxygen, Compressed Gas and Liquid (V3) Conforming to IS 309 (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
Repairing and Maintenance of roof mounted CAB AC units during minor and major schedule of 3 phase locomotives at ELS/BNDM for a period of 02 years.
Hemgir to Biswanathpur_Road_ 600mm Dia Single row HPC with 60mtr guard wall and CC road -Earth work,GSB,WMM,PCC-M30-_At 0.000 km 0.000 to 0.240
Repair to Bridge over Satabari Nallah on Kurumkel-Deogan road_Road_Repair to Bridge such as minor repairs to railing, deck slabs etc and painting _At 2.000 Km
Kulbabasti to Bankibahal road_Road_Repair to roads such as pot hole repair, repair to ruttings, Clearance of vents of CD works, Flank dressings etc. to prevent further detorioration._0.000 to 3.360
Repair to Bridge over Local nallah at 8.00 KM on Tangarpali to Tinkuda road _Road_ maintenance and colouring of parapet, guard post and Repairing of Approach, Flexible appron._At 8.000 Km
T03 _ Khatkurbahal Dhipapada road_Road_ Guard wall of 2mtr. Height_1.200 to 1.400