Loading…
Loading…
2,846 results • Recent activity
TTPS Operation Circle Chemical Division Testing and analysis works of DM Plant I and II on round the clock basis for the period from 01.04.2026 to 31.03.2027
TTPS Operation Circle MPM I Unit I Upkeepment cleaning of mills mill floor and leak arresting in mills and coal pipes from mills to boiler for the period from 01.04.2026 to 31.03.2027
TTPS ES Circle MRT II Blowing cycle operation Trouble shooting of water wall soot blowers LR soot blowers Cleaning Maintenance of Control panels Junction Boxes field equipment of FSSS Boiler Auxiliaries Systems in Units IV V Sub Division III
TTPS Mech II BM Unit I II III Attending Breakdown works in Unit I II III ESP for the period from 01 04 2026 and upto 31 03 2027
TTPS Operation Circle MPM I Unit II Upkeepment of R.C. feeders and attending to shear pin renewal works for a period from 01.04.2026 to 31.03.2027
TTPS ES Circle EM III -Cleaning of cable trays cables of 415 V AC 220 V DC 24 V DC Switchgear rooms Unit IV V cable gallery floors in Unit IV Common Unit V and water washing of cable gallery floors in Unit IV Common and Unit V area for the pe