Loading…
Loading…
2,851 results • Recent activity
TTPS Mech II BM Unit IV V Attending breakdown works in FD PA Fans of Unit IV V for the period from 01 04 2026 and upto 31 03 2027
TTPS Operation Circle MPM II Unit IV and V mills Checking the alignment of mill motor with gear box and setting the axial and radial clearance for a period from 01.04.2026 to 31.03.2027
TTPS ES Circle EM I Filling up of Hydrogen gas in cylinders and handling of filled and empty hydrogen gas cylinders between Hydrogen plant I and II and Units I to V for the period from 01 04 2026 to 31 03 2027
TTPS Mech II TM I Unit I II III Breakdown works in Main Turbine system such as Ejectors, control valves critical pipe lines etc for the period from 01 04 2026 to 31 03 2027
TTPS Operation Circle MPM II Unit IV and V Overhauling of Roller Journal assembly and renewal of wornout grinding rolls of HP 803 mills for a period from 01.04.2026 to 31.03.2027
TTPS Mech II BM Unit IV V Boiler Preventive and breakdown maintenance works in Burner and H O Guns for the period from 01 04 2026 and upto 31 03 2027