Loading…
Loading…
2,841 results • Recent activity
TTPS ES Circle EM I Charges for cleaning and tightness of LDBs pillar box and LP box in Unit I II III TG area 0 Mtr to 13 5 mtr UCB 6 6kv control room DG set room Service building, cable gallery Transformer yard for the period from 01 04 20
TTPS Mech II BM Unit I II III Cleaning of zero meter floor in between BAH Mill and disposal of fly ash debris etc from to debris yard for a period from 01 04 2026 and upto 31 03 2027
TTPS Operation Circle MPM II Unit V Collecting of coal mill rejects from the mill chute, dumping in the specified area, cleaning the same, loading, transporting and dumping as a heap in a specified area at TTPS from 01.04.2026 to 31.03.2027
TTPS Mech II BM Unit IV V Attending breakdown works in ESP and clearing of Ash powder fire hazardous materials around ID fans and attending breakdown works in FG duct of Unit IV V for the period from 01 04 2026 and upto 31 03.2027
TTPS Operation Circle MPM II Unit IV Collecting of coal mill rejects from the mill chute, dumping in the specified area, cleaning the same, loading, transporting and dumping as a heap in a specified area at TTPS from 01.04.2026 to 31.03.2027
TTPS Mech II TM I Stage I II Maintaining the T G equipments kept at repair bay free from debris dust and clearing coal ash dust from the repair bay floor for the period from 01 04 2026 to 31 03 2027