TTPS Operation Circle MPM II Unit V Attending to preventive and breakdown maintenance works like renewal of wornout grinding elements, ring roll setting, carrying out patch welding in coal pipes etc., from 01.04.2026 to 31.03.2027
TTPS ES Circle EM I Annual Maintenance and testing of WBCT BREAKER LAS CVT isolators CC wave traps main bus I II and III PT CTs transfer bus Station transformer I II and spare generator transformer under hung bus earth bus and its frame under hung bu
TTPS Mech II BM Unit IV V Cleaning of Boiler IV V Zero meter area for the period from 01 04 2026 and upto 31 03 2027
TTPS ES Circle EM II Weekly cleaning Terminal tightness checking of HT LT Motors HT LT switchgear panels HT LT Breakers Modules Contactor panels and external cleaning of electrical equipments cable trays control room cleaning works at AHP Stage 1
TTPS Mech II TM I Unit I II III Inspection and Cleaning of suction strainer caisson inspection Rectification of thrust bearing, Breakdown works of MC Pumps Drip Pumps and Air compressors for the period from 01 04 2026 to 31 03 2027
TTPS Operation Circle MPM II Unit IV Attending to preventive and breakdown maintenance works like renewal of wornout grinding elements, ring roll setting, carrying out patch welding in coal pipes etc., from 01.04.2026 to 31.03.2027