Loading…
Loading…
1,017 results • Latest
Temephos Emulsifiable Concentrate (EC) (V2) Conforming to IS 8498 (Q2) (3 (3 ))
Under Chief Minister Announcement No. 634-2024 Reconstruction of the road stretch from Km 5.000 to Km 12.255 is proposed by Thin White Topping TWT on National Highway No. 109 in District Udham Singh Nagar, within Kichha Assembly Constituency, from Pt
Supply of electrical items
Providing and Installation of CCTV Camera at all Substation and Zone Office Sidcul
Supply Of Soya Ex.
supply of Maize (Grain)
supply of Moc (Musterd Oil Cake)
Supply Of DOMC (Di-Oiled Musterd Cake)
supply Of Potassium Iodide
supply of Zinc Sulphate
AA1010308599 STRUCTURAL STEEL FLAT GALVANISING 610 GM/SQM (MIN) SIZE: 8TKX65X4500 Spec No: IS 2062, AA1010308106 STRUCTURAL STEEL FLAT GALVANIZED: 610 GM/SQM (MIN) SIZE: 10.00TKX65X4500 Spec No IS 2062, AA1010308572 STRUCTURAL STEEL FLAT GALVANISING 610 GM/SQM (MIN. ) SIZE: 10TKX75X4500 Spec No: IS 2062
ALUMINIUM FLAT SIZE- 50TKX150 ANTI-CORODAL 110 (Gr. - AA6082), LENGTH 1000 MM to 5000 MM
Proposed room and hall at first floor of T and V block , IGH Pantnagar.
Construction of warden/ assistant warden residence for Kasturba Bhawan girls hostel at Pantnagar.
Construction of pathways to facilated the students at the sides of hostel road through interlocking tile (infront of 11 hostels), Pantnagar.
Widing of road from CRC gate to General Bipin Rawat Hostel.
Proposed store for Agriculture tools at Norman E Borlog CRC.
Proposed 3 BHK House at Pantnagar.
Proposed hall at First floor above Dinning hall of Farmers Hostel at Pantnagar.
Construction of pedestrian track from Agriculture college to Technology College.
Construction of Cycle track to connecting road Girls Hostel to College, Pantnagar
Construction of Cycle track to connecting road Boys Hostel to College
Repair and renovation work of CPO office at Administrative block Pantnagar
Split Air Conditioner, Wall Mount Type (V3) ISI Marked to IS 1391 (Part 2) (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
Hay Grass (Looseand Bundle) (Q3)
Supply of conveyor Belt
Supply of Gun Metal Bearing
Supply Of Black Polyethene and stitching Thread
RU7459901865 NEUTRAL GROUNDING RESISTOR LARA II PROJECT
Science lab ( Chemistry)
Basic Electrical Lab Including Small Transformer Manufacturing
AutoDesk PowerMill software
Malathion Dusting Powder(V2) Conforming To IS 2568 (Q2) (3 (3 ))
Annual Maintenance Contract for grass and bush removal outside basic strip and RESA in operational and non- operational area at Pantnagar Airport for year 2026-27. SH Balance work of year 2025 and 2026 and other miscellaneous works
Supply of Industrial Gas
Various Station cleaning Painting Job
Repair and Overhauling of 12.5/16 MVA T/F 2 at 33/11 KV S/S Phase 1 Sidcul Under EDSD Sitarganj II (O and M Head)
Provn of saddles and riding accessories all types
Monthly Basis Cab and Taxi Hiring Service - Without Fuel - SUV; Mahindra Bolero; 2026; 5000 KM; A/C; 24 hrs
As per BOQ
Windows License for MS Office usage+ antivirus+ others software
Work Benches with Bench Vices & Assembly Kits
Basic electrical lab including workshop technology equipments
AutoDesk Feature CAM software
Basic electrical lab including strength of material
SPARE PARTS OF CHAFF CUTTER MACHINE HIMCO
Utility shifting work from Majgavi Gram Sabha to Meherban Nagar under four lane widening and strengthening work of Majhola Birhani Bhara Pachpeda other district road in Sunpahar Rural Water Scheme
Custom Bid for Services - as per bid doc Similar Category Short Term Cab & Taxi Hiring Services
FABRICATION AND ERECTION