Loading…
Loading…
3,959 results • Latest
Establishment, Construction, Supply and Procurement, Fabrication, Erection of Machineries, Trial Run, Commissioning of Material Recovery Facility (MRF) and Wate to Compost (W2C) Plant at Makum
Water Distribution with RCC Canal, Dong Bima at Talitbari Village under RIDF-XXXI
Infrastructure Development of Ayush Health and Wellness Centers (AHWC) under Ayushman Bharat for the FY 2023-2024, group.11 (4 nos. of scheme in Goalpara and Bongaigaon District.)
Pkg. No. CE/EAP/ARRBP/OCB/Bridge-1/Sonitpur/09 Construction of Bridge in Sonitpur district i) Br. No. 2/1 on Dakhin Balijuri Kheria Chuburi to Gederijan connecting road
Excavation of drainage channel Doikhona,Dency and Namdung to mitigate flood inundation of Gelakey area under Nazira Revenue Circle.
Construction of Bridge in Sonitpur district i) Br. No. 1/1 on Hatinga to Hatinga Quarry Road Package No. CE/EAP/ARRBP/OCB/Bridge-1/Sonitpur/25
Construction of Bridge in Sonitpur district i) Br. No. 2/1 on Tengabasti Sivapuri to Hajong Gaon Connected Road Package No. CE/EAP/ARRBP/OCB/Bridge-1/Sonitpur/22
MMUPPNA-RIDF-XXXI-25-26-33 Improvement and Widening of Road from NH29 Buragohai to Hori Taro gaon under 109 - Howraghat (ST) LAC under Mukhya Mantrir Unotto Pakipath Nirman Achani (MMUPPNA) under RIDF - XXXI of NABARD for the Year 2025-26, L 3.70 k
MMPPNA_RIDF_XXXI_25_26_507 Improvement Road of 8th Mile Namghar to Na-Basa gaon under Mukhya Mantrir Paki Path Nirman Achani (MMPPNA) under RIDF-XXXI of NABARD for the year 2025-26.
Restoration of damages to the right bank embankment of river Depota.
MMPPNA_RIDF_XXXI_25_26_299 Construction of Road from (1) Bapakhat KB Road to Gharmara Satra via Lechai Samani, DK Road, (2) Na Pamua to Jorhatia, (3) Japisajia to Sarulahan connecting road via Telia, Padumoni Khat Gaon, (4) Jengrai Singimari to Bamo
Construction of Water Park
Cleaning, Desilting and Maintenance of Drains (Package No. DSLT-Div-I/8) under Mitigation of Urban Flood in Guwahati City under Guwahati Municipal Corporation for the year 2026
BTR_RIDF_XXXI_25_26_01 Construction of road from Simla to Bhehguri under RIDF-XXXI of NABARD for the year 2025-26.
Construction of Bridge in Baksa district i) Br. No. 1/1 on Bunmajapum to Mazgaon Road Package No. CE/EAP/ARRBP/OCB/Bridge-1/Baksa/13
MMPPNA_RIDF_XXXI_25_26_159 Construction of (1) Swadhinata Henani Prajapati Rijjal road, (2) Road from Nath Namghar to Gerua Pather under Mukhya Mantrir Paki Path Nirman Achani (MMPPNA) under RIDF-XXXI of NABARD for the year 2025-26.
Construction of Bridge in Baksa district i) Br. No. 1/1 on NH-31 to Dipta Package No. CE/EAP/ARRBP/OCB/Bridge-1/Baksa/12
Settlement of Beel Fisheries
Construction of Various Community Hall under Guwahati Municipal Corporation
Procurement of flood fighting materials (PSC Porcupine) for Water Resources Department for the year 2025-26 (BTAD W.R Zone) Ph-III.
M and R to Construction of New embankment including raising and strengthening of existing dowelbund from Bhabalagaon to 5th Mile under Sadiya Co-District.
Immediate measures for repairing of most vulnerable sluice gate under Barak Valley for the year 2025-26.
Flood resilience through New embankment with RCC sheet at Noanodi B/B Embankment from Manitari to New B-dyke.
Construction of (i) Hatikhola Sonali Path (L 0.300 Km), (ii) Piyoli Nagar Namghar Path to Idgah Path (L 0.300 Km), (iii) Pragati Path (L 0.280 Km), (iv) Samanay Path (HM Nursing home) (L 0.20 Km), (v) 1 No Mirihula Path (L 0.30 Km), (vi) Mirihula Nam
Construction of (i) Hatikhola Sonali Path (L 0.300 Km), (ii) Piyoli Nagar Namghar Path to Idgah Path (L 0.300 Km), (iii) Pragati Path (L 0.280 Km), (iv) Samanay Path (HM Nursing home) (L 0.20 Km), (v) 1 No Mirihula Path (L 0.30 Km), (vi) Mirihula Nam
Flood Mitigation of Puthimari River by capacity augmentation of Wetland area at Garjan, Assam, Package 2.
Construction of Bridge in Dibrugarh District i) Br. No 3/1 on MN Road to Rangchali
Construction of ICBP Road from Palla Kali Mandir to Mili-Juli Chowk via Sanimandal Road Barogopal Than under SOPD (G) for the year 2025-26.
Restoration of B/Dyke from Kharmuza to Nichinpur at Tarangapur-Superivita area ( In Between Ch.30.00 Km to 31.00 Km ) from flood damages of river Brahmaputra.
Construction of RCC Bridge No. 1/1 on South Singimari-Habrubari Road CE/EAP/ARRBP/OCB/Bridge-1/Kokrajhar/37
Construction of Shankardev Path byelane at Ahomgaon including RCC drain under SOPDG for the year 2025-26.
Construction of Bridge in Lakhimmpur District i) Br. No. 1/1 on Khora Bund to Gobindagaon
Anti erosion (A/E) measures on the L/B of Dhansiri River at No.1 Daidenguri village area.
TECHNICAL SAFETY SURVEILLANCE OF SUSPENSION CROSSING FACILITIES
Restoration of B/Dyke from Kharmuza to Nichinpur at Madhu bazar area ( In Between Ch.6.70 Km to 8.50 Km ) from flood damages of river Brahmaputra.
Restoration of Golakganj- Bisondai Embankment from the flood damages of river Gangadhar on its L/B.
M and R to Sumdiri R/bank from Ch 0.00m to 6015.00m for 2025-26.
M and R to Pabha R/Bank embankment from Rajgarh to Dhunaguri P.W.D. for the year 2025-26.
Flood management by Capacity Augmentation of Fekalai Wetland area for flood regulation.
Restoration of damaged of embankment in between ch. 38420 m to 40400 m of B/Dyke from Rowmari to Baghbar during flood of 2022.
Anti erosion measures to protect Baka Shyam Ghat Radha Gobinda Mandir at Sapatgram and its adjoining areas from the erosion of river Loska on its RB.
Anti-erosion measures to protect Moulang Bengaligaon, Katha Adarsha and its adjoining areas from the erosion of river Buri-Dehing.
Anti-Erosion measures at different reaches of River Charikoria.
R/S to Bhogamukh to Moukhuwa on the L/B of river Korha from Ch. 12550.00m to 19150.00m.
Construction of embankment on R/B of river Mora-Pagladia from Makrapara to Barpit.
Restoration of B/Dyke from Kharmuza to Nichinpur at Kaljani area ( In Between Ch.10.20 Km to 12.00 Km ) from flood damages of river Brahmaputra.
PROVIDING FITTING FIXING AND PLACING OF 6 INCH DIA GI WATER LINE FROM NEW DEEP TUBE WELL INSIDE 100 TPD PLANT AREA TO IR PLANT AT APL NAMRUP
M and R to protect Dikhow bund R/B from Monipuribasti to A. T. Road at Cherekapar for 2024-25.
Refurbishment works in new office space (2000 sq.ft) of ASRLM at Panjabari, Guwahati-37
Construction of Construction of New Circuit House at Udalguri, Assam, on Engineering, Procurement and Construction (EPC) Mode-1