Loading…
Loading…
3,959 results • Latest
Construction of boundary wall on the extended allocated land of NIPER Guwahati Campus (2 nos. of sections) for the year 2025-26
R.C.C Br No 1/1 Pakriguri to Balamguri over river Modati CE/EAP/ARRBP/OCB/Bridge-1/Kokrajhar/20
FOR PROVIDING CONSULTANCY SERVICE IN THE FORM OF ARCHITECTURAL AND DETAILED ENGINEERING WORKS INCLUDING SOIL TESTING REPORT FOR SETTING UP OF FLATTED FACTORY COMPLEX AT GOALPARA, DISTRICT GOALPARA, ASSAM
Restoration of R/B embankment of Noanadi river from Garubandha to Borkumarpara and L/B from Bezpara to Kamarpara village. (Works of Filling and Laying of Geo Tube, Geobag Type A, Launching of PSC Porcupine etc)
Construction of RCC Drain from Garal Rotary point to River Brahmaputra including Sluice Gate and Pumping facilities.
Construction of RCC Drain from Padma Lake to its outfall at Kalbhog River at Larika.
Cleaning and De-siltation of the drainage channel outside the AIIMS Guwahati Campus from WRD Pumping Station to Bhetamukh Pumping Station for the year 2025-26.
Dhomdhoma Tamulpur road at Jartaluk village to G.K. Ali via Majusiral (Recast).
Construction of embankment on the R/B of river Pagladia from Borikadonga to Madaltana and on the R/B of river Lebra from Tupolia to Kadamtala including protection measures at different reaches (recast).
Restoration of breach and damages along with R/S, A/E, Pro-siltation measures and other ancillary works on L/B of Borak from Sonaimukh to Tarapur at different reaches (Recast) (Sub Estimate- Berenga Nathpara).
Recovery and Re-Construction of Kashimpur Batabari Road under NDRF (PDNA-2022) for the year 2025-26.
Strengthening of existing protection work in between Stone Spur IV to Stone Spur V of DTP Dyke at Dibrugarh for river Brahmaputra.
R/S of B/Dyke ch 61240m to Ch 69087m including A/E measures to protect 10 No and 11 No sheet of Satrakonara area from the erosion of river Brahmaputra on its R/B.
Anti-Erosion measures to protect Nagakhelia to Matikota area of Aithan Bund from the erosion of river Brahmaputra.
Anti Erosion measures to protect Kalakati Singimari area on R/B of river Brahmaputra.
Protection of Gobindapur-Tinkonia area from the erosion of river Brahmaputra on its R/B.Package No.01
Protection of Gobindapur-Tinkonia area from the erosion of river Brahmaputra on its R/B. Package No. 02
Anti erosion measures to protect Chanaka area on the left bank from erosion of river Brahmaputra.
RFID Library Automation with Digital Library System
Construction of Additional Classroom at Jambuguri ME School, Kachugaon, Dist- Kokrajhar under Dharti Aaba Janjatiya Gram Urkarsh Abhiyan during the year 2025-26.
Selection of an Agency for Establishment and Commissioning of Material Recovery Facility (MRF) and Waste to Compost Plant (W2C) at Bijni MB, BTAD, Assam
Construction of Additional Classroom at Anchali Higher Secondary School Jalah Dist Baksa
Construction of Additional Classroom at Fiangpui Higher Secondary School, Harangajao Dist-Dima Hasao
Restoration of dyke at different reaches on R/B of river Katakhal from Rupacherra Village to Rupacherra Grant area.
Restoration of dyke at different reaches on R/B of river Dholeswar at Uttar Kanchanpur area.
Strengthening of Gainadi R/B embankment both U/S and D/S of Rly. Package 1
Construction of embankment on the right bank of river Kopilli from Jugimukh to Chaparmukh and Padumoni 1 No. colony to Changchaki on the left bank (Ph-III) Package 2
Immediate measures for bank stabilisation at Hatimura area under Kaliabor Revenue Circle from the avulsion of river Brahmaputra for the year 2025-26.
M AND R to Protection of East Tetelisora area under Kampur Revenue Circle from the avulsion of river Haria on its right bank.
Recovery and Reconstruction of (1) Kaliya Gohai Than Road, along with other 8 nos. of works under NDRF(PDNA-2022) for the year 2025 -26.
Construction of Moran Bhaban at Guwahati (Phase-III) Dakhingaon, Dispur
Consultancy Services for feasibility study, Design and DPR preparation of 123 bridges in four Groups requiring maintenance, Bridges to be widened, temporary Bridges to be replaced with RCC Bridges under ARRBP
Repair and renovation work under ASSIST project for GNM Training School and GNM Hostel, Golaghat, Assam
Construction of 11 KV spur line with AAAC Covered Conductor and Installation of 500 KVA Pad Mounted Substation at Dibrugarh University under Dibrugarh ESD I of Dibrugarh EC APDCL
Erosion Protection Work (RTP) near Gouri Nath Mandir at Sonaipar River under RIDFXXXI
Anti-Erosion Measures and River Bank Protection work in Gelabill River under SDMF
MMPPNA_RIDF_XXXI_25_26_213 Construction of Road from (i) Silchar Hailakandi Road (SH-39) at 23rd km to 660 No L.P School via Probir Das house at Chotojalenga (L-1.20 Km) (ii) Harinagar PWD road to Sashan Ghat Via Netaji L.P. School L-1.15 Km under Mu
River Bank Erosion Management in Gelabil River at Bilotia Kaibartta village under SDMF
Constn/Imp. of (i)Seujipath (ii)Konwarpath (i)Adivashipath (iv)Adivashi by lane 1 (v) Adivashibylane 2 (vi)Adivashibylane 3 (vii)Adivashibylane4 under MukhyaMantrirPakiPathNirmanAchani (MMPPNA) under SOPD-G for 2025-26
Bali Jokaibowa Riverine Land Protection cum Land Development Project under SDMF.
Erosion Protection at Nizlaguri Village under RIDF-XXXI
Gully Control cum Water Harvesting Project at Jabrangpara under RIDF-XXXI
Integrated Measures for Flood and Landslide Mitigation through Bioengineering Practices at Motigaon village under SDMF
Mitigation of Flash Flood and Land Reclamation in No.2 Khusungjuli village through Biological and Engineering Measures under SDMF
Restoration of flood damage of Jangal Chariali to Puthimari bazar road under Reconstruction Recovery Window (Assam Floods and Landslides 2022, PDNA) for the year 2025-26. Package No. SSDTRD_PDNA_4.
Mitigation of Flash Flood and Landslides by Application of Mechanical and Biological Measures at Bhelamari village under SDMF
Procurement of flood fighting materials (PSC Porcupine) for Water Resources Department for the year 2025-26 (Lower Assam Zone) (Ph III)
Construction of Ledo ITI College Road of Margherita LAC under PMKKKY Scheme of District Mineral Foundation Trust, Tinsukia for the year 2025-26
Development of Drainage system from Kacha Nala near Ledo College to its outfall at Burhidehing River, Margherita (Construction of Slab Culvert 10.00 m Span) under PMKKKY Scheme for the year 2024-25 of Tinsukia District (Margherita LAC)
Recovery and Reconstruction of T05 to Hokai HC Road under NDRF(PDNA-2022) for the year 2025-26.