Loading…
Loading…
1,939 results • Latest
Consultancy Services for Carrying out Detailed Project Report (DPR) study for Development of Ropeway Projects in the State of Nagaland and Tripura.
IE for Const of 6L GF AC Indore E By km113.00 on NH 347BG vill Simrol Datoda vill and at km139.630 Nanded vil pkg2 of Indore L26.630 Km n RnU of NH52 Ex.18.000 Khandwa Vill to km27.00 Ahilyapur vil 4Lto6L pkg2 of Indore L9.00 Km in MP NHO TL35.630km
IE services for Const of 6L GF AC Indore Eastern Bypass starting from design km 64.000 near Pirkaradiya vill and ending at design km 113.000 on NH 347BG near vill Simrol Datoda pkg1 of Indore n Dewas district in MP on HAM Mode L 49.00 Km
Construction of new Storage Tanks (10 Nos.) with associated facilities at Rajahmundry Asset (CST-RJY)
Repair and raising of stone wall at some places, toilet and roof of Stand at stadium in IOL Estate, Dehradun
Execution of pending defect rectification works for Development of Emergency Landing Facility for stretch Km1274.000 - Km1277.600 on Chilakaluripet-Nellore Sec. of NH-16 in AP on EPC Mode, under Risk and Cost of EPC Contractor, on an item-rate basis.
Consultancy Services for Preparation of Detailed Project Report DPR for four laning of the Jevargi Bellary Section of NH 150A in the State of Karnataka
DESIGN, ENGINEERING, PROCUREMENT, SUPPLY, CONSTRUCTION, ERECTION, TESTING, COMMISSIONING, OTGT AND COMPREHENSIVE OPERATION, MAINTENANCE FOR FIVE YEARS OF 600 MW SOLAR PV PROJECT WITH 275 MW 550 MWH OF BESS IN JHANSI.
Work for Repair and Replacement of Main Entrance Gate at 220 KV Sub Station BBMB Jagadhri
Supply, Installation, Testing, Commissioning, Operation and Maintenance of Centralized Control and Monitoring System (CCMS) for Street Lighting on National Highways under RO - Patna on Five Year Six Month Contract Basis.
Ground Remediation, Post Geotechnical Investigations and associated works under IDCT 2A and 2B, SREH, Hot Water Tunnel, Turbine Island structures, common areas and miscellaneous structures of GHAVP-1-2 at village-Gorakhpur, Distt-Fatehabad, Haryana.
Const of 4/6L GF Ludhiana Rupnagar NH 205K from Jn with NE to Manewal (Ludhiana) to Jn with NH205 near Bheora (Rupnagar) with Ludhiana bypass under NH(O) in Punjab on HAM PKG 2 DC 37.700 to 66.440 and Ludhiana Bypass DC. 0.000 to 18.500 TL 47.240 km
Balance work for Const of Western Side Spur of Rampur Rudrapur sec connecting NH24 to NH 87 bypassing Rampur Town at Risk and Cost of Contractor on EPC Mode in Uttar Pradesh.
One Time Improvement of Mozari Town from Km. 119.000 to Km. 123.000 on Existing NH-53 under EPC Mode.
Regional Office Varanasi has been assigned the work of Consultancy Services for preparation of DPR for Long term Rectification of MoRTH identified Blackspots under RO UP East Varanasi NHAI
Operation and Maintenance of 6-lane Badarpur Elevated Highway (including service roads ramps approaches PUPs and Parks) on Delhi-Agra Section on NH-2 from Km. 16.100 to Km. 20.500 in Delhi and Haryana on Item Rate (Percentage) basis.
Consultancy Services for Preparation of Detailed Project Report (DPR) for development of remaining stretches of Urban Extension Road-I (UER-I), including connectivity to 75m Road / Upper Dwarka Expressway at Gurugram.
Request For Proposal (RFP) - Integration and Checkout of SSLV Sub Assemblies
Consultancy Services for preparation of DPR-Feasibility Report Development of Port Connectivity from Dighi port-Poladpur-Surur (Junction with NH-48) greenfield alignment (Approx. Length-140 km.)
Re-carpeting main gate to rest house in residential and nonresidential complex at 220 KV Sub Station BBMB Narela
Construction of Formation, Blanketing,Minor Bridges,Major Bridges and other ancillary works from Ch Km 52.300(Bijalpura, Nepal) to 68.610 (Bardibas, Nepal) in construction of new BG Rail Line from Jaynagar (India) to Bardibas (Nepal) Railway project
IE SERVICES FOR CONSTRUCTION OF 4 LANE THIRUVANANTHAPURAM OUTER RING ROAD (ORR) FROM NAVAIKULAM (CH. 0.000) TO VIZHINJAM (CH. 62.700) SECTION OF NH 866 DESIGN LENGTH 62.7 KM ON BOT (TOLL) MODE IN THE STATE OF KERALA.
Engineering, Design, Supply, Inspection, Testing, Packing, Forwarding, Transportation to Site, Guarantee, Storage, Fabrication, Civil works, Erection, Examination, Testing, Commissioning, Operation and Maintenance as per the tender specification.
TCIL ITCS TMS 0715
Development or construction of entry exit arrangement AT 4 Lane Greenfield Expressway SPUR from Delhi Vadodara Greenfield Expressway near Bandikui to Jaipur section of NE 4C in the state of Rajasthan on EPC Mode.
Biomedical Equipment Maintenance Management Programme across Himachal Pradesh
Consultancy Services for preparation of DPR / Feasibility Report for Jaigad Port Chiplun Satara (Junction with NH-48) Greenfield Alignment in the State of Maharashtra (98 km)
SITC of Imaging and Analysis For Cytogenetics Fully Motorized System Digital Slide Scanner (Metaphase Finder system)
SITC of Next Generation Sequencing
SITC of Thermal Cycler (Gradient PCR)
SITC of Fully Automated TMA
Upgradation/Revamping of Fire Fighting facilities at various installations of Rajahmundry Asset
Construction of a 2 cell grade Separated Structure with 20m span each at Amila Village on NH 29 as a long term road Safety measure on EPC Mode for the package of 4laning of Varanasi Gorakhpur Section of NH-29
Construction of Light Vehicular Underpass LVUP at Pidhwal Mod as a long term road Safety measure on EPC Mode for the package of 4 laning of Varanasi-Gorakhpur Section of NH-29 Package III in the State of Uttar Pradesh
Repair to Retaining wall and drain behind C-11 and C-15 block in New Type III at IOL Estate, Dehradun
Replacement of windows and doors, waterproofing on roof and repair of floor, sunshed etc in DSC line at IOL Estate, Dehradun
Supply, Installation, Testing and Commissioning of CCTV Systems for various ONGC Work Centres along with 4 year CAMC
Works for Carrying out Preconstruction activities and Updating of DPR information for Chennai Bengaluru Section of the Chennai-Bengaluru HSR corridor (CBHSR).
INVITATION FOR BIDS (IFB) FOR BALANCE OF PLANT (BOP) EPC PACKAGE FOR DURGAPUR THERMAL POWER STATION (1X800MW) LOCATED AT BARDHAMAN DISTRICT OF WEST BENGAL
TENDER FOR MANAGED SERVICES FOR THE CENTRAL NETWORK OPERATIONS CENTRE (CNOC) AMENDED BHARATNET PROGRAMME
4L of Jagtial Karimnagar Section of NH 563 from Jagtial Bypass Start at Design Ch.0.000 Existing chainage 90.500 on NH63 to Design Ch.58.866 km near SH-1 Ch. 170.400 km at Karimnagar Bypass End DL 58.866 km in the state of Telangana on DBFOT mode
Supervision Consultancy services for Rehabilitation and upgradation of existing road to 2-lane with paved shoulders configuration in Purulia to Chandil section of NH-18 including Purulia Bypass in the States of West Bengal and Jharkhand
TENDER FOR PHASED IMPLEMENTATION STRATEGY FOR UNIFIED CONVERGENT BSS and OSS PLATFORM (UNISTACK) COVERING FTTH, LL, ENTERPRISE AND MOBILITY SERVICES)
Expression of Interest (EOI)/ BID for Operation and Maintenance of facilities/amenities at toll plazas under Highway Nest (Mini) including the toilets constructed under Swachh Bharat Mission in the State of Kerala under the Jurisdiction of RO TVM
Rectification of Curves in the Existing Emergency Landing Facility including Construction of Perimeter Roads on both sides of the ELF and ATC Plinth (50m 50m) on Chilakaluripeta Nellore sec from Km 1274.000 to Km 1277.600 of NH 16 in AP on EPC
Construction of Viaducts at 12 locations Cut and cover Tunnel at 02 locations and Pedestrian Underpass (PUP) at 01 location from Km 517.250 to Km 547.080 section of New NH-66 (Old NH-47) in the state of Kerala on EPC mode