Strengthening and overlay at various stretches of 4 lane Bamanbore to Garamore Section (km 182.600 to km 254.537) of NH-27 in the state of Gujarat under TOT Project at the Risk and Cost of existing Concessionaire
Strengthening and overlay at various stretches of 4 lane Garamore to Samakhiyali Section (km 254.537 to km 306.000) of NH-27 in the state of Gujarat under TOT Project at the Risk and Cost of existing Concessionaire
Replacement Revamping of PWC systems with 6 yrs O and M Contract
Construction of 03 nos. of 3 lane ROBs and 07 no of VUPs on 6L Delhi Agra Section old NH-2 (New NH 44 and 19) from Km. 20.500 to Km. 200.000 in the State of Haryana and Uttar Pradesh on EPC Mode.
Reconstruction rehabilitation of existing bridges in Ranchi Rargaon Mahulia sect from km140.000 to 224.800 NH33 new NH43 and km224.800 to 277.568 NH33 new NH18 and existing bridges in Mahulia Baharagora state Jharkhand
4L of Kolhapur Sangli sec of NH166 from Sangli Phata km 0.00 to Chokak km 7.738 n Chokak km 145.300 to Ankali km171.171 Length33.609 km in Maharashtra to be executed on Hybrid Annuity Mode under NH O
Construction of Toilet Blocks at select Fee Plazas under RO anchi in the state of Jharkhand on item rate percentage basis
Construction of Vehicular Underpass VUP at Km 38 280 Kolegaon Pati on Ghogargaon to Ahmednagar Solapur District Border Pkg II Section of NH 561A in the state of Maharashtra on EPC Mode
BW for Cons.of 4lane Greenfield DAKE from Jun. with Jalandhar Kapurthala road (NH703A) near Khojewal village to Junction with Amritsar Mehta Sri Hargobindpur Tanda road (NH503A) (Km 319.400 to 362.420) on EPC mode under NH(O) in Punjab (PKG-11)
BW Cons. 4lane GF DAKE from Jalandhar Moga road (NH703) to Jalandhar-Kapurthala road (NH703A) (Km 303.900 to 319.400) and Jalandhar Moga road (NH703) to Kapurthala Sultanpur Lodhi road (NH703A) (km 0 to 24.000) in Punjab (P10)
Balance works for Cons. of 4-lane Greenfield Delhi Amritsar Katra Exp. from Jun. with Ludhiana Malerkotla Road (SH11) near Bhogiwal village to Junction with Ludhiana Moga Road (NH5) (Km 225.770 to km 260.860)on EPC mode under NH(O) in Punjab (PKG-08)
Strengthening overlaying of Four laning of Barhi Hazaribagh section of NH 20 from km 0.000 to km 41.279 (length 41.28 km in the state of Jharkhand on item rate percentage basis
Const. of grade separators at Rabarika Chowkdi Kutiyana Bypass near vill. Mal Choliyana n VUP near Kutiyana vill along with standalone service road 2.20 km on Porbanadar Jetpur sec of NH27 in Gujarat
Cons of 6L GF AC Indore Eastern Bypass from km 113.000 on NH 347BG near Simrol/Datoda end at km 139.630 Nanded PKG2 of Indore dist n Rehab n upgrade of exist NH52 from km 18.000 Khandwa to km 27.000 Ahilyapur from 4to6L PKG2 of Indore in MP on HAM
Construction of 6L GF AC Indore Eastern Bypass starting from DC KM 64.000 near Pirkaradiya village and ending at DC KM 113.000 on NH 347BG near village Simrol/Datoda PKG 1 of Indore and Dewas district in Madhya Pradesh on HAM Mode. L 49.00 Km
Authority Engineer Services for Construction of De Scoped Length of Four Lane Bypass (NH 206) for Shivamogga City Project Length 4.74 Km from Km.209.76 to Km.214.5 (Design Chainage) under NH(O) on EPC Mode
Construction of De Scoped Length of Four Lane Bypass (NH 206) for Shivamogga City Project Length 4.74 Km from Km.209.76 to Km.214.5 (Design Chainage) under NH(O) on EPC Mode in the State of Karnataka
GTE FOR DESIGN, SUPPLY, ERECTION, INSTALLATION, TESTING AND COMMISSIONING OF ONE NUMBER STATE-OF-THE-ART PAPER MACHINE (6000 TPA)
Independent Engineer Services for Development, Operation and Maintenance of the Ropeway Project from Kamakhya Railway Station to Kamakhya Temple on DBFOT Mode in the State of Assam.
Independent Engineer Services for Development of the Ropeway system from Govindghat to Hemkund Sahib Ji in the State of Uttarakhand on DBFOT Mode.
Construction of DoubleDecker structures of approx. 6.652 Km from Ch.11.734 Km to Ch.16.746 Km in C1 and from Ch.4.620 Km to Ch.6.260 Km in C2 and Stations.Vinayaka Layout,PapareddyPalya,BDA Complex Nagarbhavi in C1 at Sunkadakatte in C2 of BMRCL,Ph3.
Construction of DoubleDecker structures for a length of 6.521 Km excluding JP Nagar 4th Ph station from Ch-0.330 Km to Ch.6.326 Km and 4 Nos of Elevated Double Decker Metro Stations JP Nagar 5th Ph,JP Nagar,Kadirenahalli and Kamakya Jn. of BMRCL Ph3.
Construction of Double Decker structures for a length of 5.408 Km from Ch.6.326 Km to Ch.11.734 Km and 4 Nos of DoubleDecker Metro Stations, Hoskerehalli, Dwaraka Nagar, Mysore Road and Nagarbhavi Circle of BMRCL, Ph3.
Independent Engineer Services for Development of the Ropeway system from Sonprayag to Kedarnath in the State of Uttarakhand on DBFOT Mode
Upgrad of exist. 4L Corridor from Km 71.000 From Purvanchal Expressway to Km 102.000 Start of Ghazipur Zamania Saiyad Raja sec of NH24 TL 30 km in Uttar Pradesh on HAM mode PKG I
Const. of 4L GF corridor Ghazipur Zamania Saiyad Raja of NH24 Old NH97 with extens. up to Varanasi Ranchi Kolkata corridor Km 0.000 to Km 51.850 TL 51.850 km in Uttar Pradesh on HAM mode Pkg II
4-Laning of Muzaffarpur- Sitamarhi- Sonbarsa section of NH-22 (Design Ch. Km. 0.000 to Design Ch. Km. 82.551 Total Length 82.551 Km) in the state of Bihar on Hybrid Annuity Mode (HAM)
Upgradation of existing Highway to 4 laning Standard from Pachpadara Bypass (Ch. 95.780) to Patau Interchange (Ch. 115.003) Section of NH25 in the State of Rajasthan on EPC mode.
Construction of Breakwater, Rock Bund, Wharf and capital dredging and reclamation for backup yard and allied onshore facilities including maintenance thereof on Hybrid Annuity Model (HAM) under Development of Outer Harbour at V.O. Chidambaranar Port.
Dev of 4/6L of AC Kanpur Kabrai GF highway start 0.000 (Kanpur Ring road) to 117.700 near Kabrai Sec1 and Overlay/Strengthen other road safety and improvement works on exist Kanpur Kabrai sec from 7.430 to 130.100 of NH34 in UP Sec2 on DBFOT pattern
IE Services for 4Laning of Jagtial-Karimnagar Section of NH-563 from Jagtial Bypass Start at Design Ch.0.000 (Ex.chainage 90-500 on NH-63) to Design Ch.58.866 km (Ch.170.400 km) at Karimnagar Bypass End (58.866 km) to be executed on BOT mode NH O
Allotment of land on long term lease (annual lease rental basis) of 30 years, on as is where is basis in Zone - 4, Plot 16066 Sq.m. (3.97 Acres) near ATP at EXIM Park area for Covered Storage Godown for Industrial Purpose-Port Related Activities
Development and Maintenance of Land to be created in Offshore of Vadhvan Coast by Dredging, Reclamation and Construction of Offshore Protection Bund for Vadhvan Port on PPP to be executed on Hybrid Annuity Mode
Construction of 6-lane Elevated Corridor from Maduravoyal Junction (Chainage Km 13.965) Chennai Outer Ring Road (Chainage Km 22.100) including Junction Improvements at km. 22.368 of NH-48 (Old NH4) in Tamil Nadu on Hybrid Annuity Mode (Project Lengt
Construction of six lane Greenfield Highway starting from its Junction with NH4B (New NH348) near Pagote (Design km. 0.000) till its Junction on NH48 at Chowk (Design km. 29.219) in Maharashtra to be executed on BOT (Toll) mode under NH(O)
Tolling Operation Maintenance and Transfer of Purnea Dalkhola Raiganj section of NH-27 and 12 in the state of Bihar and West Bengal (TOT Bundle-22)
Tolling Operation Maintenance and Transfer of Asanpur- Forbesganj- Purnea section of NH-27 in the state of Bihar (TOT Bundle-21)
Tolling Operation Maintenance and Transfer of Muzzafarpur- Darbanga- Asanpur section of NH-27 in the state of Bihar (TOT Bundle-20)
IE Services for Construction of 6-lane Greenfield Highway starting from its Junction with NH-4B (New NH-348) near Pagote (km.0.000) till its Junction on NH-48 at Chowk (km.29.219) in Maharashtra to be executed on BOT (Toll) mode under NH (O)