Loading…
Loading…
15,353 results • Latest
SDF/2025/1521 Restoration of Rain Damages on Tandi to Nandi road km. 0/00 to 9/500 (SH Construction of of PCC R/wall with parapets at RD 8/150 to 8/166) Under Deposit
Balance work for Repair of Pot Holes in between km 4/00 to 13/500) ( Under PDNA-2023
C/o Stage at G.S.S.S Chail Chowk Tehsil Chachiot Distt. Mandi (H.P) (SH Construction of stage)
RRD on Kot to Devidarh road km. 0/00 to 22/500 (SH C/o PCC R/wall at RD 2/705 to 2/717 with parapets)
SH C/o B/wall at RD 0/385 to 0/415 , R/wall at RD 0/485 to 0/500 and at RD 0/505 to 0/520, C/o R/wall at RD 0/430 to 0/465,B/wall at RD 0/435 to 0/455, 0/505 to 0/525 and P/L 900mm dia HPC at RD 0/350, 0/420,0/510 ,P/L 300mm dia HPC at RD 0/485)
R and M of Civil works. JOB1
RRD on Shimla Mandi via Tattapani road km. 145/00 to 172/00 (SH C/o of PCC R/wall at RD 171/805 to 171/810 and 171/830 to 171/838)
A/R and M/O Govt. Girls Sports Hostel SH Construction of Toilet, Boundary Wall, Main gate, P.C.C R/Wall in front side of Ground and R.C.C Walls in left and right side of Hostel ground etc.
SH 5/7 mtr wide F/C between km 0/225 to 0/900
Sub Head Construction of Civil work, W.S., S.I. Site development Works
RRD on Naitla Anupali road km. 0/00 to 2/250 (SH C/o R/wall at RD 1/820 to 1/840) LHS of road
RRD on Shimla Mandi via Tattapni road km. 145/00 to 181/400 (SH c/o of PCC R/wall at RD 151/200 to 151/215)
C/O Trench, Water Harvesting Pond, Roof Rain Water Harvesting Structure and Gabion Check Dam (GCD) Structure in W.no 13 Tanda MC Palampur
Balance work of Interpretation Centre of Great Himalayan National Park at Shamshi District Kullu (HP) (SH- Balance work of civil work and W.S and S.I).
Restoraton of rain damages on Kaloha Pragpur Dhaliara Dada Siba Sansarpur Terrace road Km. 22/200 to 60/920 (SH C/o U shape drain with grating in Dadasiba bazar Km. 27/200 to 27/340)
under Jal Shakti Section Kathgarh Sub. Division Indora) (For one Years)
Repair of 40 HP pump set no. 1 along with allied accessories, Repair Repair of 40 HP Motor set no. 1 along with allied accessories
Rewinding of 25 HP Motor along with allied accessories, Repair of star delta conductor pannel board with power factor Job no. II along with allied accessories
Repair of 15 HP Submersible pump along with allied accessories, Repair of 20 HP Submersible , Motor along with allied accessories
Upgradation of MT on Charna Ghatti Lodhia road km. 0/0 to 6/540 (SH Improvement of formation deficiencies, Retaining structure ,C/O Cross-drainage works, 2.00 mtrs span slab ,10.00 mtr Cause way, C/O V-Shape Drain Road furniture and W Metal Crush
C/o link road from Baliana Lamber Basti to Suked Km. 0/0 to 2/0 (SH cement concrete pavement in Km. 0/0 to 0/060, retaining wall at RD. 0/005 to 0/060 and providing and laying premix carpet in Km. 0/510 to 0/710) under MMSY.
Balance work for Repair of Pot Holes on Bani Matkar road in between km 0/00 to 6/715) ( Under PDNA-2023)
RRD on Thatta to Samlwas road Km 0/0 to 12/00 SH - Re-construction/removal of slips/ boulders, muck debris etc. in Km 0/0 to 12/00.
C/o link road from Garli Sadvan road to Sat sang Ghar plat Ward No.7 Gram Panchayat Bani (SH C/o 900mm dia hume pipe culvert at Rd. 0/042 and P/l Interlocking concrete block at Rd. 0/0 to 0/154) under MMSY.
Tender for shifting of 2 Nos of 250 KVA 11/0.4 KV s/stn Bus Stand and Sabji Mandi ( Bum Chowk) Jahu a/w LT Line coming in the alignment of NH Mandi - Jahu on Partial turnkey basis under ESD HPSEBL Bhareri. (ED Barsar)
RRD on Khuhan to Khanethi road Km 0/0 to 2/00 SH-Re-construction/removal of slips/boulders, muck debris etc. in Km 0/0 to 2/00. Job No.1
RRD on Khaneti to Matla road Km 0/0 to 4/00 SH-Filling up Pot holes/Earthen Shoulder/ Berms in Km 0/0 to 4/00.
Tender for providing SOP to Nagar Panchayat Bhoranj by prov. 1- phase LT Line for installation of street light in Bassi Market on partial turnkey basis under ESD HPSEBL Bhoranj. (ED Barsar)
SH RR White washing Distempering Finishing wall Painting and Steel Work
Balance work for Repair of Pot Holes in between km 0/00 to 11/00)( Under PDNA-2023
M/T Karsal to Didian via Mastial road Km. 0/0 to 3/400 (SH providing and laying G.S.B., wearing (G-II G-III) and premix carpet with seal coat in Km. 2/00 to 2/210) under MMSY
RRD on Khaneti to Khuhan road Km 0/00 to 3/0, Sudhrani to Teeldhar Km 0/0 to 4/500 and Thatta to Katwanoo road Km 0/0 to 4/500, SH- Repair/Filling up of Pot Holes Earthen Shoulder/Berm and removal of slips and Filling up of Pot Holes Earthen Shoulder
C/o link road from Main road to the house of Sh.Tara Singh Rana in GP Kaloha (SH C/o Retaining wall, edge wall at Rd. 0/120 to 0/150 RHS wire crate at Rd. 0/150 to 0/165 and P/l CC pavement at RD. 0/120 to 0/375) under MMSY.
Replacement of electrical installation and switchgear system into new one of Leprocy Hospital Sarol at Chamba in Tehsil and Distt. Chamba (H.P).
C/o Link road from Gurala to upper Dubki Ward No. 6 Km. 0/0 to 1/400 (SH P/l Interlocking concrete block in between Km.0/0 to 1/00) under MMSY
Primary Health Centre Building at Kholanal Teh. Balichowki Distt. Mandi H.P. SH Construction of Site Development, Building portion,W.S , S.I Septic Tank and Rain water harvesting system
C/O U-Shape Drain ,Edge wall at Rd 0/120 to 0/300 at Junction point Bhevar Chowk) (Under PDNA-2023)
C/o Link road from main Road Balghar to Village Kalehar upto Dada Siba Bazar Km. 0/0 to 0/750 (SH providing and laying GSB, wearing (G-II G-III) and premix carpet with seal coat in Km. 0/0 to 0/750 and culvert at Rd. 0/300 0/700 and Breast wall ,
providing and fixing of 630 kVA Lt panel box
Replacement of 2Nos damaged DTR i.e 22/.4kV, 250kVA Charimu Nala-II , 100kVA Tungesh-I in ( E) Section Fagu , Dharech, under ESD, HPSEBL, Theog.
Replacement of 3Nos damaged DTRs i.e 22/.4kV, 63kVA Cheyad, 100kVA Koti ,100kVA Switch Yard Theog, under ESD, HPSEBL, Theog.
Estimate for R/M of HT/LT Lines at various locations damaged due to rainfall in (E ) Section Ghora Chowki under the jurisdiction of this division
Replacement of 3Nos damaged DTRs i.e. 22/.4kV, 25kVA LWSS Darabla Khad, 25kVA Airtel Tower Shilaroo 63kVA Shari under ESD, HPSEBL, Matiana
(S.H Preparation of Project report for A/A and E/S, including field survey related study, estimation including topographical survey site plan, L-section, etc. by outsourcing including drawing of all civil structure and hydraulic design.) Under Nabard
Estimate for R/M of HT/LT Lines at various locations damaged due to rainfall CESD, HPSEBL Idgah under the jurisdiction of this division
(SH Providing, Laying, Jointing and testing of rising main GMS pipe line of 150 mm dia (MC) at LWSS Abherni Goyla Panner 2nd stage) Under PDNA (9214).
(SH Construction of drinking water storage tank at Village Mali 20,000 liters capacity). (Under PDNA). (9203,9261)
O and M of Ganvi Stage 2
Drilling, Lowering of assembly, Development of BoreWell at Chulla near Power House , Uhl Stage-III HEP (100 MW), BVPCL, District Mandi H.P
Restoraton of rain damages on Didian to Gurala road Km. 0/0 to 3/800 (SH C/o R/wall at RD 2/650 to 2/670).