Maintaining of electrical wiring system of Kotla colony, Jeori colony, Det. Jeori Colony, Ganvi colony, intake sites, power house complex, dam sites of stageI stageII power house complex for the year of 2026-27 (135 days)
SH Hiring of Machinery for restoration of Rain Snow Damages on NH 05 Km 280.00 to 307.00 under NH Sub Division Jeori
O and M of Ganvi Stage 1
O and M of Ganvi Stage 1 refer NIT
Renovation of rain shelter at back side SBI bank below Kali Bari Mandir in ward No3 Kaithu
HPSEBL/GPHD/DB-9/2026-27-20 REFER NIT
Providing and laying of additonal precast concrete socketed and spigotted pipes and collar of class NP-2 with reinforcement duly ISI marked as per ISI-458-2003 precast concrete pipe with and without reinforcement for providing temporary approach to v
Clearance of chocked trash rack of trench weir Ganvi Intake 2 wef 01.07.2026 to 30.09.2026 (92 days)
Clearance of Chocked Trash Rack of Trench Weir Ganvi Intake I wef 01.07.2026 to 30.09.2026 (92 Days)
CO path from PWD Building to Dhingu Dhar in ward No22 Shanti Vihar SH Chequred tiles M.S Pipe railing and CC steps etc
Construction of Community Center cum Commercial Complex near MC Shops on khasra No 595 to 606 at Mohal Chhotta Shimla SH Site Development Phase I
Felling, Conversion and Carriage upto RSD and further Transportation to HSD Mantaruwalla (Paonta Sahib)
Construction of additional accommodation to Civil Hospital at Bhawarna in Distt. Kangra (H.P.).(SH Providing 01 No.s 20 passengers lift with six stop and six opening (Machine Room Less) electric traction elevator therein).
C O ambulance road from NH 22 Bye Pass to Gorkhu Lodge in ward No 27 Kasumpti SH C O R wall
Supply installation , testing and commissioning of 26 passengers bed cum Stretcher type patient lift No. 2 and 3 service /freight lift and maternity /robotic lift at 500 bedded hospital at Dr. RPGMC Tanda (SH Providing wiring, earthing and additional
C/O Rajeev Gandhi Govt. Engineering College at Nagrota Bagwan distt. Kangra H.P.(Sh Providing Video Surveillance System in Cafeteria therein)
Annual repair and comprehensive maintenance contract of 01 No.250 KVA Dg set installed in the Circuit house Dharamshala in Distt. Kangra (H.P.) for the year 2026-2027
Construction of Heliport at Sultanpur in Tehsil and Distt. Chamba (H.P.).(Sh Providing, Installation, testing and commissioning of fire fighting system therein).
Replacement of Electrical Installation and switchgear system into new one of Govt. Ayurvedic Health Wellness Centre at Bharmour in Tehsil Bharmour District Chamba (H.P).
Construction of Combined Office building at Multhan, Tehsil Baijnath, Distt. Kangra (HP) (SH Providing LAN Networking therein).
A.R and M.O. NH.05 Km 236.00 to 368.00 SH. Construction of Retaining wall in PCC at Km 257.670 to 257.683
A.R and M.O. NH.05 Km 236.00 to 368.00 SH. Distempering and painting of Memorial Park at Jeori Bazar Km 298.260
A.R and M.O. NH.05 Km 236.00 to 368.00 SH. Construction of Retaining wall in PCC at Km 257.072 to 257.095
Repair of restoration of rain damages of internal road Green Avenue Colony Rakkar Tehsil and Distt.Una (SH Laying of CC Paver blocks in various internal road Mohal Tabba (Deposit work)
interlocking paver block, soling, M/T, U shape drain etc.
Repair and Maintenance of link road to Bharolian Khurd Distt.Una km.0.0 to 1.810(SH Providing and erecting crash barrier at RD.0.940 to 1.0) (Under OFC deposit)
Additional alteration of HPPSC Office building at Nigam Vihar,Shimla-02.(SH C/o of wating area near Canteen of HPPSC Building, Nigam Vihar, Shimla-02.
Removal of slips, demolishing stone rubble masonry and demolishing cement concrete from back side of pump House and entire complex at Zone No.- 8 and Circumfrential Butt Welding in common header and Rising Main. PDNA No.- 5482
Supply of Unskilled Labourer for watch and ward of scheme ) for 24 Months.
SH RR providing Laying and Jointing of GMS Tube of various Dia Under PDNA 2023
(SH-Construction of B/wall in P C C 1 4 8 at RD 3/300 to 3/335).
(SH- C/o 900mm dia HPC at RD 7/020 and R/wall in PCC 1 4 8 at RD 7/225 to 7/275) Under PDNA
SH Co 12mtr Long retaining wall to protect the CCStone channel
(SH -Construction of B/wall at RD 0/0 to 0/060, R/wall 30/500 to 30/509 and 33/500 to 33/511)Under PDNA
Construction of Luna to Ohra road Km 0/00 to 7/00 (SH C/O R/wall at RD 5/560 to 5/575.
SH Co 21mtr Long Breast wall to protect the CCStone channel
R.R Damages on T.J.G.N.K road km.0.000 to 52.000. SH P.L of 80mm Cement Concrete Paver Block and U.shape drain at RD 5.580 to 5.660
(SH- Construction of Two Rooms with Verandah on First Floor)
Recovery and Reconstruction of Tikar Jarol Gahan Nankhari Khamadi Road Km 0.000 to 52.000 Sub head Construction of R.Wall at RD 23.875 to 23.895 24.300 to 24.310 27.705 to 27.720 and Breast wall at RD 28.030 to 28.050 Under PDNA
P/L Patch work in between km 15/500 to 22/000 P.D.N.A -2023
P/F W metal beam Crash barrier in B/w km 12/520 to 12/630 and 13/560 to 13/595
SH RR Providing Laying and jointing of GMS tube of various dia Under PDNA 2023
RR Damages on Bhutti Kharan road Km 0.000 to 12.000. Sub head Construction of Retaining wall at RD 3.705 to 3.713.90 3.715 to 3.723.70 5.438 to 5.446.80 5.452 to 5.460.80 and 7.910 to 7.918.90 Under PDNA
SH Providing Internal Electrical Installation work along with CCTV Telephone Exchange EPABX System Video Conferencing System for Conference Hall etc
Restoration of rain Damages on Nankhari to Sharog Shakla to Barog road km 0.000 to 3.000. SH C.o Breast wall from km 1.235 to 1.242.
P/L G-II and Kharnja Stone Soling at km 0/290 to 0/550
RR Damages on Barach Delath road Km. 0.000 to 7.000 under PDNA SH C.o R.Wall in PCC at KM. 6.420 to 6.434 and KM. 6.445 to 6.454