Loading…
Loading…
28,152 results • Latest
Improvement of Drain near Muthyalamma Tempel and Improvement of UGD Near Somvara Kunte Kalyani in Doddathoguru TP limits
Construction of Culvert in Bettadasanpura near Reddy hotel in Doddathoguru TP Limits
Improvement of Road near Government School Yallamma Temple in Doddathoguru TP limits.
Improvement of Road from Iragal Temple to Narayanreddy House in Doddathoguru TP Limits
Laying of Drinking Water Pipeline from Bettdasanpura Mehabub Pash House and Vitasandra Lake newly Drilled Borewell to Existing pipeline and Joseph Layout in Doddathoguru TP limits
Improvement of Drain and Culvert in Bettadasnpura Kuba Mazid Nabil Weilding Shop in Doddathoguru TP Limits
Improvement of Road near Betadasnpura Channppa Street in Doddathoguru TP Limits
Construction of RCC Drain and Covering Slab Near Prakash Bakery to sai Vidhrath School infront in Doddathoguru TP Limits.
Laying of Pipeline from Betadasanpura Kaveri Water Sump tank to Over Head Tank in Doddathoguru TP limits.
Construction of Metaling Road from Appayya S Karoli farm to Jakanevva Temple at Ward No 8 Construction of Metaling Road from Jatta Jamboti Road to Balappa Sakreppagol House at Ward No 9 Fixing of Cement Pipes Ward No 1 to Ward No 3 Development of Road at Ward No 14 and 5 Development of Road at Ward No 3 6 10 14 Construction of Paver Road Yadranvi Farm at ward no 10 Construction of RCC Drain from Kanapatteppa Temple to Panchayat Road
Providing PVC Pipes From Government High School Over head tank to Mahallingeshwar School in Ward -05 Under Naganur TP.
Annual maintenance of Road Thotadamadagu,Hanumantapura, Chathrapalya, Nagalapura,S.Appenahalli, Yammethimmanahalli,Shravanagudi,Bedattur, Nallekamanahalli, Benakanahalli, attiganahalli,R.Gollarahatti,R.Gollahalli,G.D.Palya joining Andra border from Ch.0.00 to 1.40, 3.49 to 3.60, 3.80 to 9.0, 12.80 to 15.50, 16.04 to 17.75Km in Madhugiri taluk for the year 2026-27 (Total length 16.81Km,0.00 to 17.75Km Overlap length 1.65Km)
Annual Maintenance to Road from Garani To AP Border via Hosakote,Neerakallu, Chinnenahalli, Kattirajanahalli,Brahmadevarahalli, Kasapura, Mallanayakanahalli,M Gollarahatti CH 0.00 To 1.00 KM, 2.40 to 3.40, 10.00 to 12.25, 13.70 to 17.00 & 23.63 To 26.24 km In Madhugiri taluk for the year 2026-27 (Total length 26.24Km (Overlap length 0.71Km))
Anuual Maintenance of to Doddayalkuru, Dadagondanahalli, Tippapura, Adavinagenahalli, Singanahalli, Tireyuru, Kadagathuru, Joining Andra Boder Road from CH 0.00 to 0.75 , 4.75 to 6.65, 8.66 To 9.90, 13.85 to 14.80 and 15.30 to 16.00 KM In Madhugiri Taluk for the year 2026-27
Contsruction of Shathamanothsava Bhavana at Govt model Higher Primary School at Hosur Village, Gouribidanur Taluk, Chikkaballapur Dist
Special Repairs to CC lining and raising of embankment at aqueduct no 4 to 7 of IBC Dy-17A
Special repairs to CC Lining and Raising of Embankment from km 0.00 to 10.00 of Dy 18 under IBC
Special repairs to CTC Head wall and pipe replacement Lateral L-1 at 0.500 km and L-5 at Ch 1.300 km of Dy 18 under IBC
Special repairs to damaged CD to at ch 2.500 km of Sub lateral-1 of Lateral-9 of Dy-25 under IBC
Special repairs to CD at ch 5.200 km of Dy-21 under IBC
Raising of embankment at ch 1.800 to 2.500 km in selected reaches of DY-19A of IBC
Providing And LAying Of Paver Blocks From Sheety Doctor House To Mahiboob Ali Watch Repair House At Ward No.09 And Constrcution Of RCC slab Opposite To sangameshwara College At Ward No.18 And Constrcution Of RCC Drain And Drain Over The Slab From Gani PT Sir House To Ramanna Kabber House At Ward No.09 In Lingasugur Town Limits
Annual Maintenance of road from Nandinathapura to Bylakuppe connecting Road via Bhoothanahalli Alanahalli Road from Ch 0 Km to Ch 4.65 Km from Ch 6.85 Km to Ch 7.86 Km in Periyapatna Taluk for the year 2026 27
CONSTRUCTION OF BOX CULVERT ON BUDHERA TO (T) MIRJAPUR ROAD IN BIDAR TQ.
Improvements to road Mann E Khelli- Ranjol Kheni MDR road Km. 1.45 to 10.00 Tq. Dist Bidar (working reach Km 1.34 to 3.20 & 4.86 to 5.21)
Annual Maintenance to road from Sira to Nanjanagudu Via Gubbi, Kalluru, Yadiyuru, Amruthuru, Mandya, Hosahatti, T Narasipura From Ch 0.00 to 11.00 Km in Sira Taluk (SH-84) For The Year 2026-27
Anuual Maintenance of Chinakavajra to Chandrayanadurga ch 0.00 to 3.00 km in In Madhugiri Taluk for the year 2026-27
Annual Maintenance ofKodigenahalli-muddenahalli Road from Ch 0.00 to 2.85, 3.10 to 3.60, 4.10 to 4.40 8.91 to 9.195 9.77 to 10.00 and 10.20 to 10.59 KM in Madhugiri taluk For the year 2026-27
Annual maintenace of to NH 234 to Bislahalli via Shetty halli byalya, Handralu, kondavadi, Gandigrama road from ch 0.00 to 5.00, 7.00 to 11.31 and 11.70 to 12.40 KM IN madhugiri Taluk for the year 2026-27
Anuual Maintenance of to NH 234 To Connecting Kurudi via Vadrahatti Chikkahosahalli hanumathapura hunasavadi Road from CH 3.00 to 3.75 KM, 3.77 to 5.11 KM, 5.25 To 6.82 KM, 7.05 To 8.52 And 9.52 TO 11.20 Km In Madhugiri Taluk for the year 2026-27
Annual Maintenance of Highway connecting Hunasanahalli with Chikkahalli via Kanakapura, Ramanagara, Magadi, Solur, Sompura, Koratagere, Madugiri and Pavagada Road From Ch 137.48 KM to 146.09 KM for the year 2026-27 in Tumkur taluk (TotalCh137.48 KM to 146.09 KM)
Annual Maintenance of Gangasandra Sirivara Road From ch 0.00 to 18.17 km for the year 2026-27 in Tumkur taluk (Total Ch 0.00 to 18.50 km)
Annual Maintenance of Road Hariyajjihalli to Harogere Via Gonihalli From Ch 0.00 to 3.50, 8.50 to 12.63 and 13.00 to 14.00 km in Sira taluk for the year 2026-27
Annual Maintenance of Road Tavarekere to Bevinahalli From Ch 0.00 to 3.00, 6.00 to 12.00 and 14.00 to 17.50 km in Sira taluk for the year 2026-27
Annual Maintenance of Bagepalli-Halagur Road to Devarayanadurga I.B Road from Ch 0.00 to 6.40 km & 8.40 to 9.00 km 9.55 to 10.60 km for the year 2026-27 in Tumkur taluk (Total Ch 0.00 to 10.60)(Reserved For CAT II (A)
AN NUAL MAINTANCE OF THE ROAD FROM NH-48 KURIHALLI RANTAVALA JOINING AP BOARDER VIA MUDDENAHALLI FROM CH-0.00 TO 13.90 KM IN SIRA TALUK FOR THE YEAR 2026-27(TOTAL LENGTH 13.90KM, FROM 0.00-13.90KM)
Annual maintenance of Gangasagara-Obalapura MDR
Annual maintainance of road 2026-27 Nonavina kere Gungurumale Road from ch 0.00 to 7.00km in Tiptur taluk (0.00 to m12.00km)
Providing services of experts along with testing equipment for on-line Safety valves pressure setting in boilers of RTPS units-1 to 8 for the year 2026-27
Maintenance of road starting from NH-150A Challakere to Vishwanathanahalli via Parashurampura (SH-48),Darmapura (SH-24),Dwaranakunte,Lakkavvanahalli,Kodihalli,Adivala (NH-48) Kalagatta at Ch.109.72 to 116.46 km in Sira Taluk for the year 2026-27 (Total Length 6.74km, Ch 109.72 to 116.46)
Annual Maintenance to road from Hoskere to Huildore Road From Ch 27.64 to 29.70 Km in Sira Taluk And Annual Maintenance to road from NS Road to Kuntaramanahalli From Ch 0.00 to 5.50 Km in Sira Taluk For The Year 2026-27
Annual Maintenance of Around Devarayanadurga road From Ch 0.00 to 6.50 Km for the year 2026-27 in Tumkur taluk (Total Ch 0.00 to 6.50 km)
Annual Maintenance of Road from Valagerpura Gate (on SH 275) to Sanabaghatta Gate (on SH275) via Sanaba, Kuppe from Ch 0.00 KM to 4.81 Km for the year 2026-27 in kunigal taluk(Ch0.00 KM to 7.34 Km )(Reserved for CAT-IIA)
AME of the road State Highway No. 94,Bagepalli Halaguru Road via Channapatna Ramanagara Magadi chainage 195.00 km to 213.00 km in Kootagal Hobli of Ramanagara Taluk for the year 2026-27
AME of Old Bengaluru-Mysuru National Highway 275 (Bantawala to Bengaluru NH) From Ch 324.090 to 329.885 km (4 Lane road) in Bidadi jurisdiction for the year 2026-27
AME of Hunasahalli-chikkanahalli road (via Kanakapura-Ramanagara-Magadi) SH-3 (Ch-48.40-61.00 Km) in Ramanagara taluk for the year 2026-27
AME Road from Bidadi (NH-275) to join Huskur (NH-279) via kenchanakuppe (NH-275) Heggadagere, puttirammanadoddi, Chuchaga, Hunasanahalli-nagohalli Kailancha (SH-3) averahalli (SH-3), Kavanapura- Bommanahalli, Channapatana (NH-275), Honganuru (SH-94), Santhemogenehalli-Akkuru, Sogalapalya- Iggaluru- MaregowdanadoddiCh.7.60 to 33.80km (Overlap 20.02 to 22.40km is equal to 2.38km) for the year 2026-27 in Ramanagara Taluk Bangalore south district
AME of the road from kanakapura road to join kadanakuppe via channamanahalli, vibhuthukere, bannikuppe, nanjapura hosadoddi from 0.00-12.00 km (Ch-0.00-12.50 Km) in Ramanagara taluk for the year 2026-27
Annual maintenance of Mangalawada-Shylapura MDR
AME of Bangalore-Jalasur Road of SH 85 Road Halasabele Gate to Join Bagapalli Halagur SH-94 of Gattipura village road via chakrabavi, Koramangala, Seegekuppe, Kalludevanahalli in Magadi Taluk From Ch 0.00 km to 15.40 km for the year 2026-27 in Magadi Taluk. (CH0.00KM TO 15.40KM)