Loading…
Loading…
86 results • Latest
same as above
Minnor Works
UPGRADATION OF BDO BDC OFFICE LEH (ADDITIONAL WORKS )
Main Panel LT Supplying, installation,testing and commisioning of LT cubical panel, outdoor type, fabricated out of 16 SWG CRGA SHEET, duly painted (powder coated) floor mount, having locking arrangement comprising of the following switch gears and accessories Incomer : 100 Amp 4p,35KA MCCB ………….. 01 No Outgaing: 63 Amp DP Isolator…………………....06 No Voltage Amps frequency Digital Meter ………01 set R Y B Indication light …………………………….. 01 set changing over 100 Amp......01 Set
Construction of office building of Civil Division by way of landscaping around Office Building PDC Choglamsar Leh
Earth work in rough excavation, banking excavated earth in layers not exceeding 20cm in depth, breaking clods, watering, rolling each layer with ½ tonne roller or wooden or steel rammers, and rolling every 3rd and top-most layer with power roller of minimum 8 tonnes and dressing up in embankments for roads, flood banks, marginal banks and guide banks or filling up ground depressions, lead upto 50 m and lift upto 1.5 m : in all soils
Completion of balance Work of Construction of Protection Bund at Nallah Gound Minjee
Earth work in excavation by mechanical means (Hydraulic excavator) in foundation trenches ordrains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, liftupto1.5m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kind Of soil 50%
Spare parts of MAHINDRA AND MAHINDRA Ltd Vehicle
A) Spare parts compatible with Mahindra Scorpio N
as same above