Loading…
Loading…
5,182 results • Latest
Grouting, paver block PMC etc.
SH- Patch WBM- 3, Grouting, Re-carpeting, Tack Coat, Seal coat, Surface drain etc. during the year 2026-27.
Patch soling, wbm-III, patch carpeting, paver blocks
SH- Launching of Bailey type unit bridge in place of damaged Boxculvert at ch. 3.01 km including construction of approach road during the year 2026-27.
Construction of abutment for installation of Bailey Bridge at Pal para over Rangapnia cherra
Procurement of 1ST class category Ceramic tiles, Vitrified tiles, Marble stone, Kota stone , Granite of different type, for construction work against various scheme within Boxanagar, Nalchar, Mohanbhog, Kathalia, R.D Block MC , NP areas under RDSNM
Selection of Training Provider for conducting STT Cum EDP on Credit Processing Officer Jobrole under MMDUP Phase III (2nd Call)
SELECTION TRAINING PROVIDER FOR CONDUCTING STT IN THE AUTOMOTIVE TELECALLER JOB ROLE TO BE IMPLEMENTED UNDER MMDUP PHASE III
Selection of Training Provider for Conducting STT Cum Entrepreneurship Development Program on Floriculturist Orchid Job role under MMDUP PHASE III
Selection of Training Provider for Conducting STT EDP On Video Blogger Job Role Under MMDUP Phase III (2nd call)
Improvement of road from Kanchanpur - Jalabassa road to Laljuri - Machmara road via Joysree VC under Laljuri R.D. Block. (under RIDF-XXXI of NABARD during the year 2025-26)
Earthwork, C.C. work, Brick work, R.C.C. work, Hardrawn, Truss and G.C.I. sheet roofing etc.
Deployment of water tanker for supply of drinking water on urgent basis in under DWS Sub-Division Salema during the year 2025-26
Earthwork, C.C. work, R.C.C. work, Plaster work, Tiles work, Truss and G.C.I. Sheet roofing etc.
Construction of CC road drain and RCC slab from the H.O Golabchand Rabi Das to H.O Prasanjit Shil via H.O Jhantu Choudhry at Balurchar under ward No.37 AMC
Construction of Health Sub Center at South Fulbari GP under Kadamtala RD Block under RD Dharmanagar Division 2nd CALL
SH-Removal of Soil, Missing Soling, Repairs of Potholes, Unlined Surface Drain, Palasiding Works, paver Bock etc. during the year 2026-27 (Gr-I)
WS scheme under RWS/JJM/other Fund in North Tripura District/SH- Hiring of 1 No Maruti Celerio/Maruti Wagon R having commercial Registration (Manufacture not before 2020) for o/o DWS Sub-Division, Panisagar, North Tripura 2026-27
e-Tender for Engagement of Security Personnel for providing Security Services in the College of Veterinary Sciences and AH, R K Nagar West Tripura
RWS/Other deposit works/JJM Schemes in North Tripura District 2026-27/ SH- Const. of 2 nos. Pump house, laying of distribution pipe line in/c all allied Civil, Mechanical and Electrical works of DWS Sub-Division, Dharmanagar/Gr.-I
Please refer to DNIeT
Running and Mtc.of RWS scheme in Sepahijala dist./ SH Providing and fitting fixing of starter spare parts and other electrical accessories , panel board under Bishalgarh
Running and Mtc.of RWS scheme in Sepahijala dist./ SH Providing and fitting fixing of starter spare parts and other electrical accessories , panel board under Bishalgarh
Please refer to DNIeT
Manufacturing and placing of C.C block of size 0.45mx0.45mx0.30m including allied works
Please refer to the DNIe-T
Land levelling for construction of various infrastructure of 15th Batallion TSR at West Kanchanbari GP under Kumarghat R.D Block.
Construction of 15 nos Non Type and Type VI quarters at Agartala West Tripura SH Building portion including internal water supply Sanitary installation Sewage and Drainage and Internal Electrification works SH Balance Electrical Works thereof
Repairing and modification of Internal Electrification for different wards including the maintenance of existing IE works of Dhanwantari building ABV RCC Hospital Agartala Tripura W
FDR Mtc of different MI Schemes under PWD WR Sub Division I Udaipur SH Repairing rewinding of horizontal submersible motor within Killa Block Udaipur during FY 2026 27
Construction of Bitumen Road from Cherma PWD road to Bhagatsing SB School via Bamboo Factory at Paschim Singhicherra GP under Khowai RD Block as per PWD SoR-2023 (L-0.45 KM)
Supplying, Installation, Testing and Commissioning of Equipments for Electrical measurement, Electrical workshop, Electrical Machine and Power System Laboratory at TTAADC Polytechnic Institute, Khumulwng, West Tripura
Construction of C.C road from H.O Ajoy Das to H.O Rabindra Sarkar at Nabadiganta area under ward NO 47 AMC.
Supply of GI barbed wire, Chain link wire mesh and Others materials during 2026-27
Patch WBM, Grouting, Re-carpeting , seal coating, and road side drain etc
Patch WBM, Grouting, Re-carpeting , seal coating, and road side drain etc
Installation and commissioning of 2 nos SBDTW one each at ST Boys and Girl Hostel attached to EMRS Birchandra Nagar Santir Bazar sub division of South Tripura District during the year 2026 - 2027
Construction of Paver Block road including Protection wall and R.C.C Cover Drain in Various Locations from 1. PWD Road to House of Sudhama Taran L 35.00 m 2. PWD Road to Swapan Roy L 50.50 m 3. Najir Islam To Satu Miah L 46.00 m Drain and Pvr Block
Procurement of 300 (Three Hundred) Metric Ton Rice Bran for Livestock in 50 Kg Suitable Stitching Bags for GCMPUL for the Period of 12 (Twelve) Months
Construction of masonry drain including cover slab in various locations from I. PWD road to the house of Chabar Miah L 90.00 m II. PWD road to Rahed Sarkar L 32.00 m at Ward No_03 UMC_UDP_2025-26. Length of Drain 122.00 m.
Development of road from Jambura vivekananda club to nag shop L1.2 k.m Ch. 600.00m to Ch. 1200.00 m under PWD RandB Khowai Sub Division during the year 2026 27SH WBM PMC seal coat Road side pucca and surface drain etc. G 2
Development of road from Jambura vivekananda club to nag shop L1.2 k.m Ch. 0.00m to Ch. 600.00 m under PWD RandB Khowai Sub Division during the year 2026m 27 SH WBM PMC seal coat Road side pucca and surface drain etc. G 1
Construction of shed infront of new constructed BPHU and HMIS at Bishalgarh Sub Divisional Hospital, Sepahijala during the financial year 2026-27 in favor of RD Bishramganj Division. (PWD SoR 2023).
OR of the road from Hatimara A to Hatimara B L1.70 Km under Tulasikhar RD Block during the year 2026 27 SH Patch WBM III Re carpeting seal coat protection work etc.
UWS Scheme under DWS Division Dharmanagar 2026-27/ SH- Replacement of filter media of 5000 GPH Capacity Package type IRP at Signal Basti-I (near Indian Oil) within Dharmanagar Municipal Council Area under DWS Division Dharmanagar
Construction of Market at Sutarmura Bazar at Charilam under Bishalgarh Agri Sub Division.
Construction of new Boundary Wall under Raghunathpur GP at Karaimura Class XII School under RD Bishalgarh Sub-Division, Sepahijala during the financial year 2025 26 in favor of RD, Bishramganj Division. (PWD SoR 2023).
Procurement of 1st class brick 1st class straight picket and 1st Class Brick bats for various worksites at Jirania R D Block Jirania Nagar Panchayat, Mandwi R D Block, Old Agartala R D Block Ranirbazar Municipal Council and Belbari RD Block
CC Block wall protection and earthcutting for const. of Tribal Multipurpose Market Centre TMMC at Debbari Mouja, Rajkang VC, Amarpur RD Block
Major Works Water Supply Schemes Magroom VC SH Construction of 3 Small Bore Deep Tube Wells with UPVC pipes pea gravel distribution pipelines and allied works at Acharjee Para I Acharjee Para II Tri Kumar Para under DWS Sub Division 2026 27