Loading…
Loading…
667 results • Latest
Renovation Grid Synchronization and Operation and maintenance of Sapteshwar small Hydro Project (2x150 KW) in District Champawat (by deploying manpower with supply of material and consumables) for a period of three years
CIVIL WORK
Supply of PVC Flat Cable at Central Store Tubewell Division Haridwar (Bahadrabad).
PVC Flat Cable 3 Core 6 mm² with bare copper conductor insulated and sheeted with PVC for submersible pump motor confirming and marked with IS: 694:2010 Havells, Finolex, BCH or Equivalent make.
Supply of Unplasticized PVC Pipe 200 mm Dia at Central Store Tubewell Division Haridwar (Bahadrabad).
Supply of Unplasticized PVC Pipe 200 mm dia bell ended(Socket) for water supplies in light gray color 0.4 M.P.A working pressure with solvent cement (in 6mtr lenth) ISI marked including Proper Stacking in center store at tube well division haridwar as per IS:4985:2021.
Work of Temporary Registration Centre for Chardham Yatra with a German hangar at Rishikul ground in Distt. Haridwar (on rented basis)
,Y;wfefu;e teZu gSaxj vkx izfrjks/kh lkbZM ds doj ,oa iw.kZ Qzse lfgr ¼40 eh0 pkSMkbZ fiyj ySl gSaxj½
Annual Cleaning, upkeeping, Gardening and other miscellaneous work of field Hostel (near inspection house) of Lakhwar project at Dakpathar, Dehradun (Year 2026-27)
Supervisor/Receptionist - Providing services of Mate/ Supervisor/ receptionist required for proper Upkeeping, supervision & other miscellanious work of Field Hostel for Lakhwar Project Dakpathar. Consider One Person for One Month = 1 Job
Supply of decentralized material for releasing new connection under 33/11 KV sub station Jhankat.
Supply of following decentralised material as per UPCL RESPO.