Loading…
Loading…
4,324 results • Latest
Supply of the Electric Miscellenious Material
Electric Cable, Wire etc
Supply of Rubber Goods
Supply of Welding Spares (ISI Mark)
Supply of Tools and Tackles
Supply of Nut and Bolt
Supply of Pipe and Pipe Fitting
Supply of Valve (C.I. Sluice Valve, C.I. Non - Return Valve, Butter Fly Valve G.M., C.I. Valve ETC.)
Supply of Hardware (Miscellaneous Store Item)
Slope Protection Works of Khotila and Ghatdhar Dharchula Pithoragarh Uttarakhand
CONSTRUCTION OF STORE AND HALL FOR TRANSPORT COMMISSIONER OFFICE AT SAHASTRADHARA ROAD, DEHRADUN, UTTARAKHAND
Reconstructing and Realignment of 33 KV Linde line at different Plinth locations under EDSD, Selaqui under EDD, Mohanpur.
Flood protection works on both banks of the Suswa River on the Downstream Side of Dudha Devi Bridge within the Municipal Corporation area under Dharampur Assembly Constituency in District Dehradun, Uttarakhand (JOB-2 Right Bank)
Flood protection work in the downstream of dhudhdevi bridge on both Bank of river susawa Dehradun, Uttarakhand. (job-1 left bank)
Construction of Flood Protection Works on the downstream side of the railway bridge over the Rispana River under Raipur Assembly Constituency in District Dehradun Uttarakhand.
Reconstruction of damaged embankments affected due to disaster/heavy rainfall in rivers/streams/drains Nalapani Rao Rispana and Dulhani Rivers and Saiyad Khala Kotra Khala Okhla Khala Oli Khala Aam Khala Banga Khala etc JOB-02
Reconstruction of damaged embankments affected due to disaster/heavy rainfall in rivers/streams/drains Nalapani Rao Rispana Dulhani Rivers Saiyad Khala Kotra Khala Okhla Khala Oli Khala Aam Khala Banga Khala etc CM Ann No219/2024 SDMF JOB1 Dulhani
Construction of protection walls and execution of flood protection works including CC blocks at various locations on Nalapani Rao Aamwala Rao Rispana River Dulhani River Kiduwala in Raipur underCMAnnNo 740/ 2021 SDMF JOB2 Aamwala Rao and NalapaniRao
Construction of protection walls and execution of flood protection works including CC blocks at various locations on Nalapani Rao Amwala Rao Rispana River Dulhani River Kiduwala in Raipur under CM Ann No 740 of 2021 SDMF (JOB1 Dulhani River)
Reconstructing and Realignment of 33 KV AWHO at different Plinth locations under EDSD, Ganeshpur under EDD, Mohanpur.
Construction of Flood Protection work in Asan River form Chandrabani to Harbhajwala in ward-89 Harbhajwala Dehradun, Uttarakhand under C.M. Announcement No. 115/2021 in SDMF (PHASE-2) Reach 1.070 km to 1.500 km.)
Construction of Flood Protection work in Asan River form Chandrabani to Harbhajwala in ward-89 Harbhajwala Dehradun, Uttarakhand under C.M. Announcement No. 115/2021 in SDMF (PHASE-2) Reach 0. 430 km to 1.070 km.
Construction of Flood Protection work in Asan River form Chandrabani to Harbhajwala in ward-89 Harbhajwala Dehradun, Uttarakhand under C.M. Announcement No. 115/2021 in SDMF (PHASE-2) Reach 0.000 km to 0.430 km
Replacement of ACSR Conductor by Aerial Bunch Cable of LT Lines under Nathuawala feeder under 33/11 KV Sub-Station, Balawala under EDSD, Balawala under EDD, Raipur
Providing 07 no Manpower under EDD Rudraprayag through external agency for one year (01/04/2026 to 31/03/2027) against OandM Head
Operation of works through contractor/external agency (From 01-04-2026 to 31-03-2027) under EDSD Gairsain against OandM Head
Maintenance Work of associated HT/LT Lines, Street Light and substations from Junglechatti TO Rambada(From 01.04.2026 to 31.3.2027) under EDD Rudraprayag Through Outer Agency against O and M Head
ELECTRICAL WORK
Under the state plan in the Nainital district assembly constituency Kaladhungi from Himmatpur Vaijnath in Sewadip Kaloni Phase 3 and Vrindavan Vihar and Chandni Chowk Ghuddoda newly constructed work by PCC on the road from Manohar Singh Negis
WORK
ELECTRICAL WORK
Transportation Of Milk From Milk Societies (Harinagar2nd Route)
LINE WORK
UNDER THE STATE PLAN, SURFACE IMPROVEMENT WORK OF INTERNAL CONNECTING ROADS IN VANBHULPURA, GANDHINAGAR AND BAREILLY ROAD UNDER HALDWANI ASSEMBLY CONSTITUENCY OF NAINITAL DISTRICT BY BM/BC
Maintenance Work of associated HT/LT Lines, Street Light and substations from Sonprayag to Junglechatti (From 01.04.2026 to 31.3.2027) under EDD Rudraprayag Through Outer Agency against O and M Head
Project for Renovation of 02 Canals (Banpur and Shediya) under the Trible Block Chakrata of distt-Dehradun. Shediya Canal Reach Km 0.00 to 2.300 Km and Water Tank 02 Nos
Project for Renovation of 02 Canals (Banpur and Shediya) under the Trible Block Chakrata of distt Dehradun.Banpur Canal Reach Km. 0.000 to 2.500 Km.
Maintenance Work of associated HT/LT Lines, Street Light and substations from Lincholi to Sri Kedarnath Dham(From 01.04.2026 to 31.3.2027) under EDD Rudraprayag Through Outer Agency against O and M Head
Upon arrival in the Pithoragarh district, construction work is underway for a district gateway designed to showcase the region mythological and historical significance.
Supply And Establishment of Milk Homozniser (05 KPL) at NDUSS Lalkuan
Maintenance Work of associated HT/LT Lines, Street Light and substations from Rambada to Lincholi(From 01.04.2026 to 31.3.2027) under EDD Rudraprayag Through Outer Agency against O and M Head
Maintenance Work of associated HT/LT Lines, Replacement of IDF Meter and disconnection of Defaulter Consumers (From 01.04.2026 to 31.3.2027) of 33/11 KV S/S Guptkashi and Ukhimath under EDD Rudraprayag through outer agency against O and M Head
Maintenance Work of associated HT/LT Lines, Replacement of IDF Meter and disconnection of Defaulter Consumers (From 01.04.2026 to 31.03.2027) of 33/11 KV S/S Jakholi under EDSD Sumari Bhardar Through Outer Agency against OandM Head
Remaining work of construction of helipad at Bharadisen under development block Gairsain
Transport of Packed Milk and Milk product in Haldwani Second Route
Transport of Packed Milk and Milk product in Ramnagar Sai Route
Construction of 1 Quarantine Building in Dhela Rescue Center Under Corbett Tiger Reserve Ramnagar
Laying of 33 KV XLPE U/G Cable from Prabhat Cinema to MDDA Substation due to Multiple Joint (Straight Through 07 Nos) in existing cable.
CONSTRUCTION OF RAJAT JAYANTI PARK IN NAGAR PALIKA PARISHAD SHIVALIKNAGAR
Supply and Installation of 33 KV Ring Main Unit at OPTO line for Connecting OPTO factory Sub-Station under EDSD, IT Park under EDD, Raipur.