Loading…
Loading…
8,854 results • Latest
Earthwork and lining for remodeling of Itagi Distributary of Malaprabha Right Bank Canal ch 9.00-12.00 km including structures
SPECIAL REPAIRS, REPLACEMENT OF RCC POLE TO OCTAGONAL POLE AT THE MARATHA LIRC AND CONNECTED LOC AND PROVISION OF CHEMICAL EARTHING AT BLDG NO T-14 LABORATORY, P-32 OT AND ICU 2 MH OF MH UNDER GE BELGAUM
Procurment of Tareeq Watch Case with Saphire Crystal
Earthwork and lining for remodeling of Itagi Distributary of Malaprabha Right Bank Canal ch 6.00-9.00 km including structures
Earthwork and lining for remodeling of Itagi Distributary of Malaprabha Right Bank Canal ch 4.00-6.00 km including structures
DISTRIBUTION OF MILK FROM CHADACHANA SHETTLE TO VIJAYAPUR DAIRY. APPROX KM 169 VEHICLE CAPACITY 2000 LTRS MILK TRANSPORTABLE INSULATED VEHICLE.